Loading...
HomeMy WebLinkAboutResolution - 86-192 - Approving Schedule of Permanent Construction for Valley View Road Improvements - CITY OF FDFN PRAIRIE HENNEPIN COUNTY , MINNESOTA RESOLUTION 86-192 RESOLUTION APPROVING SCHEDULE OF PERMANENT CONSTRUCTION FOR VALLEY VIEW ROAD IMPROVEMENTS WHEREAS , the City of Eden Prairie has caused plans and specifications to be prepared for the improvement of Valley View Road between CSAH 4 and Mitchell Road including permanent pavement , curb and gutter, storm sewer and other miscellaneous appurtenances ; WHEREAS , due to an impending abandonment of the Chicago & Northwestern Railroad 'line and the necessary correction of some poor soils in the alignment , necessitating that work proposed between Station 39+00 and Station 53+59 will necessarily be temporary it nature. NOW , THEREFORE , BE IT RESOLVED by the Eden Prairie City Council that the following schedule and sequences of events to provide for permanent construction between Stations 39+00 and 53+59 along Valley View Road are hereby adopted; A. Surcharge construction from 39+00 to 48+00 includes an overlay on existing Valley View Road to carry traffic adjacent to the surcharge fill area . The surcharge will remain for a period of 1 112 to 2 years , after which , the construction of a permanent 52 ' section will occur. ( Including removal of the existing box culvert and temporary CMP extensions) . B. A temporary connection between Stations 48+00 and 53+59 to provide a second lane of roadway through the railroad separation with the C .N.W.R.R. shall be accomodated by means of a temporary tressle , or with permission of the railroad company, and open cut without the tressle. C . Upon completion of the abandonment process by the C .N.W.R.R. , the City will remove the existing structure for the grade separation , and let a contract to construct a 52 ' permanent roadway section . It is expected that the City would let a contract to construct the temporary tressle or receive approval from the railroad company to open cut the area and provide for the temporary connection within 6 months. D. The anticipated time period to accomodate the abandonment of the railroad and provide permanent roadway construction is approximately 2 years . It is the intention of the City to coordinate the permanent construction through the surcharge area and the railroad right-of-way into 1 contract . ADOPTED by the Eden Prairie City Council on August 5 , 1986. Mayor Ga D. to on �:� ohn D. Frane , City Clerk