Loading...
HomeMy WebLinkAboutResolution - 950 - Accepting Bid for I.C. 51-269 (Lochanburn, Lotus View Drive and Center Drive) - 02/11/1975 CITY OF EDEN PRAIRIE HENNEPIN COUNTY, MINNESOTA Resolution No . 950 Resolution Accepting Bid WHEREAS, pursuant to an advertisement for bids for the following improvements : I . C. 51-269 Projects SAN 73-7-21 SAN 73-2-21 WTR 73-8-21 WTR 73-2-21 MIS 74-9-14 Sanitary Sewer, Watermain and Street Improvements Bids were received, opened and tabulated according to law. Those bids received are shown on the attached Summary of Bids ; and WHEREAS, the City Engineer recommends award of contract to Northdale Construction Company, Inc . , Minneapolis , Minnesota , as I the lowest responsible bidder . NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EDEN PRAIRIE: The Mayor and Manager are hereby authorized and directed to enter into a contract with Northdale Construction Company, Inc. , Minneapolis , Minnesota, in the name of the City of Eden Prairie for the improvements aforesaid according to the plans and specifications thereof approved i by the Council and on file in the office of the City Engineer. f ADOPTED by the City Council on February 11 , 1975. GL Vik (/l��• iv �i David W. Osterholt, Mayor ATTESTS SEAL ai- cane, Cyr CITY OF EDEN PRAIRIE SUMMARY OF BIDS IMPROVEMENT CONTRACT 51-269 SAN 73-7-21 WTR 73-8-21 SAN 73-2-21 WTR 73-2-21 MIS 74-9-14 BIDS OPENED FEBRUARY 7, 1975 10 :00 A.M. EDEN PRAIRIE CITY HALL CONSULTING ENGINEERS : RIEKE CARROLL MULLER ASSOCIATES, INC. Northdale Construction , Inc. $408,019. 40 Barbarossa & Sons , Tnc. 420.865 . 50 Northern Contracting, Inc. 426.478. 30 Arcon Construction Company 441 ,518. 97 G. L. Contracting, Inc. 44; ,038. 25 Beatson & !telly, Inc. 453 ,266. 00 Minn-Kota Excavating 461 , 190. 20 Orfei & Sons, Inc . 465 ,228. 98 Fischer Sand & Aggregate 465 ,958. 30 Nodl and Associates 473 ,548. 40 h C. S. McCrossan 480 ,727. 00 Peter Larrietti Construction 482. 104. 32 Erickson Brothers Contracting 493 ,118. 70 Cris Construction 498.595. 30 Hoffman Brothers 509 ,620. 00 McDonald Associates 575 ,816. 50 Lametti & Sons , Inc. 558,376. 30 AFC Construction Company 558 ,781. 25 Mathematical errors corrected. We recommend Award of Contract for Improvement Contract 51-269 to Northdale Construction Company, Inc. , the lowest responsible bidder. The bids have been checked for mathematical accuracy and corrected as necessary. Approved and forwarded for Ci WCounci I consideration Carl Jul P. E. David 0. Husby, P . E. City Eng ' e Rieke Carroll Muller Assoc. , Inc. RIEKE CARROLL M U LLER ASSOCIATES II�JC February 11 , 1975 I f Mr. Carl Jullie , P.E. City Engineer City of Eden Prairie i 8950 Eden Prairie Road Eden Prairie, MN. 55343 RE: BID OPENINu IMPROVEMENT CONTRACT 51-269 LOCHANBLIRN AREA t RCM FILE 741004 I Dear Carl , The bids on the above project were received on Friday, Fc:hruary 7, ' 1975. There were 18 bidders, submitting bids varying from, a low of $408,019 .40 to a high of $558,781 .25. Our estimate was $475,000.00. i The lowest b-id was submitted by Northdale Construction Company , Inc. We have not worked directly with this company but under- stand that the City has had satisfactory results on projects constructed by Northdale. There were some apparent errors in the low bid w-hich will result in substantially lower paving costs than had been anticipated . We discussed these points with i Mr. Schany of Northdale Construction and he has indicated that they will abide by the bid prices . We are therefore recommending award of contract to Northdale. The bid price is considerably lower than the costs estimated for the hearings . Although we can not .yet guarantee the exact final cost figures , it appears now that the lateral sewer and water assessments will be decreased by 18% to 20%. If this figure holds true to completion, the unit assessment could be reduced by $700 to $800 per lot. The typical assessment for the concrete curb and gutter, based on bid prices , will be approximately $520 per lot. Because of the questi on rai sed regardi rig the desi rabi 1 i ty of the proposed watermai n on TH 101 from Lotus View Road -to Duck Lake Trail , that cost has been separated from the remainder of the project. It was originally estimated at $40 ,500 and is now Qi�17 estimated at $35,700. If this portion is deleted, the assessments U Mr. Carl Jullie, P . E. February 11, 1975 Page 2 for lateral water would be dropped from those properties abutting the highway. The latest estimated assessments for water on this project are $1 ,240 per undeveloped REC and $930 per developed REC. The project has benefitted by an extremely favorable bidding climate, resulting in substantially reduced costs to the City. Because of the favorable bids , we recomwend that the project be awarded as bid, with no deletions . Very r ly yours, David 0. Husby, P. E. RIEKE CARROLL MULLER ASSOCIATES, INC. DOH:ca IUD