HomeMy WebLinkAboutResolution - 772 - Ordering Preparation of Feasibility Report on SAN 73-1-27 and WTR 73-2-27 - 09/25/1973 RESOLUTIOIJ NO. 772
RESOLUTION 02MERIIIG PREPARl1T IO-;
OF RF.POR-l' ON IMPRO' EIMEN S
U'HEREAS, it proposed to improve:
PROJECTS SAN 73-1-2.7 and WTR 73-2-27 Sanitary sewer and watermain laterals plus
street paving for the Scenic Heights Addition.
and assess the benefi tted property for a f 1 or a portion of the cost of the
improvement, pursuant to M.S.A. 429.011 to 429.111 .
NOU, THEREFORE, BE IT RESOLVED BY THE EDEN PRAIRIE .V'ILLAGE
COUNCIL: •
dThat the proposed improvements be referred to the Village
Engineer for study with the assistance of Brauer & Assoc. , Inc. _
and that a feasibility report shall be prepared and presented to the Village
COUncil with all convenient speed, advising the Council in a preliminary
%qay as to th:: scope, cost, assessment and feasibility of the proposed imprave-
ments.
ADOPTED by the Village Council on _ September 25, 1973
Kee
Paul R. Redpa th, t--;ayoVF
ATTEST:
j SEAL
John n. Fr ane,
x