HomeMy WebLinkAboutResolution - 295 - A Resolution Approving the Final Plat of Dell Road - 03/11/1969 Number 295
RESOLUTION APPROVING
Dell Road Flat
BE IT RESOLVED by the Village Council of the Village of Eden
Prairie, Minnesota, as follows :
The final plat of Del 1 Road
located in Sr ct ior_ 30 , Township 116 , Range 22 , Hennepin County
is found to be in conformance with the provisions of Eden Prairie
Ordinance No. 93 (Subdivision Ordinance) and all amendments thereto ,
and is therefore approved.
ADOPTED BY THE Village Council of the Village of Eden Prairie
Ithis 11 th day of March , 19 69 .
Mayor, Village of Eden Prairie
Attest:
t-
Clerk, Village of Eder_ airie (SEAL)
March it , 1969
Council P,inutes
Pale -two
IV. PETITIONS , "EQUESTS t2,,'D CO'"' UN1CATIOiIS
A. Hennepin County Highway IJeDartrnent - Counter Road 1'r4 Speed Limits.
A letter fro,., the iiennepin County Highway Department advising that -the
speed limit on County Road rf4 north of T.H. 5 was being reduced from
60 to 50 ;piles per hour was presented. The change would take effect
immediately.
B. Minnesota Water, Resources Soar c - :'Ur gat:ory and alley Watershed Hearing.
"'arch 29 , 1959 9 30 A.i-I - Village Hail
The Water Resources Board, State Of ;innesota, advised the Village Council
that they would conduct a public hearing on Saturday, J'arch 29, 1969 at
9 : 30 A.N. at the Eden Prairie Village Hall on the petition requesting the
establishment of a Purgatory and Riley Creek Watershed District. The
Council asked that this matter be placed on the Larch 25th agenda for
consideration.
V. Ri:COh`:f:i i1hATI0'r1S' AIID REPORTS
Deli Road Plat .
Y The final plat of Dell Road vias reviewed by the Council. Mr. Redpath moved
that the plat be approved. i•Ir. ,Jesbitt seconded. All voted aye, the
motion carried.
B. Duck Lake Drainage. Proposal for Temporary Lake Overflow.
Mr. Hite recommended that the Village construct an overflow from Duck Lake
elevation 91.4. at the easterly end of the lake. He reported the present
elevation of the top of the ice to be 9L4.8. He said that if the
recommended overflow was not to be constructed, the lake would in all
probability rise 8 to 12 inches during the spring melt. He said he felt
that it was important that the Village take whatever steps were necessary
to see that a rise of the magnitude did not occur. He indicated that he
would advise the railroad through whose property the overflow would run,
the State Water Resources Board, and the adjoining property owners of the
proposed action and the reasons for it. Iie emphasised that the proposed
temporary establishment of the 914. foot elevation overflow was not intended
to be a permanent solution to the Duck Lake drainage area water problem.
The permanent solution to this problem would require considerably more
engineering design and contact with affected parties.
C. Interstate LE94 - Iii�hway 169. 1.969 Improvements.
It was reported teat the Ninnesota Highway Department had consented to the
Village' s request to remove from its scheduled May 1969 letting, the con-
struction of ramps between existing Trunk highway 169 and Interstate 494.
This action had been requested by the Council at the February 25th meeting.
The Highway Department would proceed to complete the clover leaf at
Interstate 494 and Trunk Highway #5 and would assist the Village in the
design of 169-494 ramps at a location previously suggested by the Village.
D. Disnosit:ion of Accounts Receivable.
The Couricil took the following actions on the outstanding accounts receivable.
Invoices number 1.298 to Joe Semrad for $45.00, numbers 1005 and 8929 to
Don Kral for $200.00 and an unnumbered invoice to Wal-Don Builders in the
amount of $716.25 were referred to the Village Attorney for collection.