Loading...
HomeMy WebLinkAboutPlanning Commission - 06/23/2025Agenda Eden Prairie Planning Commission Meeting 7 p.m. Monday, June 23, 2025 City Center Council Chambers 8080 Mitchell Road Eden Prairie, MN 55344 ATTENDEES Planning Commission Members: John Kirk, Andrew Pieper, Ed Farr, Robert Taylor, Daniel Grote, Frank Sherwood, Charles Weber, Phou Sivilay, Trisha Duncan City Staff: Jeremy Barnhart, City Planner; Carter Schulze, City Engineer; Matt Bourne, Manager of Parks and Natural Resources MEETING AGENDA I. Call the Meeting to Order II. Pledge of Allegiance III. Approval of Agenda IV. Minutes A. Approval of the minutes for Planning Commission Meeting held on June 9, 2025. V. Public Hearing A. Veridian Credit Union (2025-03) 1. Planned Unit Development Concept Review on 0.77 acres 2. Planned Unit Development District Review with Waivers on 0.77 acres 3. Site Plan Review on 0.77 acres VI. Planner’s Report VII. Members’ Reports VIII. Adjournment UNAPPROVED MINUTES EDEN PRAIRIE PLANNING COMMISSION MONDAY, JUNE 9, 2025 7:00 PM—CITY CENTER Council Chambers 8080 Mitchell Road COMMISSION MEMBERS: John Kirk, Frank Sherwood, Andrew Pieper, Ed Farr, Trisha Duncan, Robert Taylor, Dan Grote, Charles Weber; Phou Sivilay CITY STAFF: Jeremy Barnhart, City Planner; Carter Schulze, City Engineer; Matt Bourne, Manager of Parks and Natural Resources; Kristin Harley, Recording Secretary I. CALL THE MEETING TO ORDER Chair Pieper called the meeting to order at 7:01 p.m. II. PLEDGE OF ALLEGIANCE – ROLL CALL Commission member Farr was absent. III. APPROVAL OF AGENDA MOTION: Grote moved, seconded by Taylor to approve the agenda. MOTION CARRIED 8-0. IV. MINUTES MOTION: Kirk moved, seconded by Weber to approve the minutes of May 27, 2025. MOTION CARRIED 7-0 with one abstention (Grote). V. PUBLIC HEARINGS A. DANFOSS COMPREHENSIVE PLAN AMENDMENTY (2025-02) • Amendment to Comprehensive Plan for approximately 57 acres currently owned by Danfoss Energy Solutions, re-guiding the property from Industrial Flex Tech and Office to Mixed Use. Barnhart presented the staff report. The City initiated this amendment after learning the property would be sold. This presented an opportunity for the City of Eden Prairie to examine the land use of the property and assess the City’s retail, PLANNING COMMISSION MINUTES June 9, 2025 Page 2 housing and land use goals. These properties are guided Industrial Flex Tech, with one parcel also guided Office. This Comprehensive Plan Amendment and map change would result in the parcels being re-guided Mixed Use, allowing the City to realize its vision for the property, which had great visibility from Highways 5 and 212, access from Mitchell Road and Technology Drive. The parcels had good infrastructure in terms of water and sewer capacity, and the ability to handle increased traffic. Barnhart displayed a colored map showing the different parcels. He concluded this was a prime candidate for office, retail, and residential Mixed Use land use. Barnhart gave some background: the City had identified a couple parcels for Mixed Use (Eden Prairie Center, crosstown). Here, the predominant use would be residential but was the same vision. Office uses would be addressed since one parcel was already so guided. The residential density was anticipated to be between 40 and 75 units per acre. Traffic distribution, utilities, tree preservation, stormwater management, et cetera, would be reviewed by staff as the property develops via development proposals. The existing large manufacturing, large office building, and small office building would continue to operate. Future development proposals might trigger an EAW (Environmental Assessment Worksheet) review. Commission members did not need to be concerned about this at this time. Staff would continue to work with Danfoss, the owner, on a mutually compatible project. Staff recommended approval. Pieper asked for and received confirmation there had been a planned LRT station on this property, which would now not be built. Doug Neuberger, head of real estate for Danfoss for the Americas, stated he and his colleagues disagreed with the Comprehensive Plan Amendment for the entire property. The west side of the property was zoned Industrial and would stay that way, but he feared an overall re-guiding would make the property less desirable to future industrial tenants. The east side of the property was more appropriate for residential and retail, and he was aligned with staff on these site plans. He disagreed with what was being called industrial, seeing that parcel more of a business park. Staff and Danfoss seemed to be growing apart in their visions for this property over time. He also disagreed with expanding the retail footprint in the eastern portion, on which the office buildings currently sat. TransWestern broker, Nate Erickson, also explained the objection to an overall re-guiding of the property. There was a buyer under contractor for entire 57 acres. Danfoss would cease operations at the end of the year, with perhaps some operations continuing into early 2026; therefore, ultimately, the property would be vacant. The buyer had a plan that fit with the closing this year. He stated the re-guiding could change the equation for Danfoss and the buyer, potentially having a significant adverse effect and economic harm. He estimated the effect would be in PLANNING COMMISSION MINUTES June 9, 2025 Page 3 the millions of dollars plus downtime. The west existing industrial properties could be reused as industrial, but a lease or sale to a new user would limit the tenant’s ability to expand or improve the building if the area was re-guided to Mixed Use. The industrial use was congruent with the other buildings in that area. Most anchor tenants were grocers who had alternative locations within Eden Prairie and/or had no plans to expand. He feared a domino effect. He agreed with the destination retail plan in the east side of the site, but with the proposed re- guiding, Danfoss would not be able to execute a plan in a reasonable amount of time. Barnhart replied there seemed to be three competing goals: the City’s long term vision, Danfoss’s goal to sell quickly by the end of the year, and the buyer’s goal to lease or sell quickly. Staff sympathized and supported the continued use of the industrial. He emphasized this Comprehensive Plan Amendment would not rezone the properties. Tonight’s decision could affect the land use for 40 or 50 years, and the commission members had to weigh this vision against the current, short term market issues and the owner’s immediate goals. The guidance would not prevent the properties being used and maintained as industrial. He asked if the City would like to see a new industrial building in a heavily wooded area having the visibility and access described above. Barnhart proposed these uses were more appropriate for the Golden Triangle. From a planning perspective, well-designed, well-run cities did not make that calculation. He urged the commission to take the best path forward and asked what goal should have precedent: the City’s long term goals or the goal to sell the property? Peiper asked if a compromise had been explored, allowing the western parcels to remain guided industrial whereas the others could be re-guided Mixed Use, and Barnhart replied staff did not want to see a new industrial building in the western portion, which was less accessible. Staff wished to avoid a corridor of large Flex warehouses that may or may not employ people. Weber asked what was being done with the other Danfoss property along Wallace Road, and Barnhart replied that parcel, being separate geographically, was left out of this Comprehensive Plan Amendment. Duncan asked why this parcel was not included, and Barnhart replied the current, much larger property under consideration offered a unique opportunity that the other parcel did not. Barnhart added there was mostly consensus between staff and Danfoss. The north half of the office lot and vacant land north of that was the essential debate. Duncan asked if there was space to add more industrial in the Golden Triangle. Barnhart replied most of that was built up and the City was starting to see redevelopment in that area. This was a unique situation: 57 acres to redevelop in the heart of the City. The large Industrial Flex buildings would be less visible in the Golden Triangle business park which was more appropriate for them. Discussion followed on the lack of a grocery store in the area. PLANNING COMMISSION MINUTES June 9, 2025 Page 4 Duncan remarked this was a dilemma and she could see both sides. There was also a potential for high traffic with significant Mixed Use reuse. Barnhart replied he was able to apply ratios to support his staff report and would be required to provide traffic analysis along with any development application. Most uses would generate increased traffic, water and sewer needs. Comparing a worst-case scenario versus no re-guiding was not a helpful metric; the memo in the staff report provided for further analysis in the future based on known information. Sherwood asked for and received confirmation Barnhart had received some messages showing interest in buying/developing the eastern part of the property. Barnhart replied all parties received the same message: the large industrial building would continue but staff did not wish a new industrial building to be constructed, with residential and destination retail envisioned for the east side. The northern part of the industrial parcel was the most controversial; otherwise, the owner and staff were largely in agreement. The residential would require a Comprehensive Plan Amendment. Duncan summarized what she believed was the process of the Comprehensive Plan’s drafting during which this was a Flex Industrial property. The 2040 Plan was met by this property, so her question was, did this exceed goals? Barnhart replied that the Metropolitan Council had a prescription for housing growth and employment growth, and for affordable housing units; Eden Prairie met those without this Amendment change. Kirk stated his goal in these meetings was always to attempt to understand the essential issues and what he heard staff saying was, staff was comfortable with the existing Industrial but would like to see in this site located in central Eden Prairie expanded residential and retail. However, Danfoss wished to keep the Industrial guiding in order to avoid limiting the next buyer to expand the industrial footprint. Some parcels would probably move toward Mixed Use. He concluded the City wished to limit the industrial footprint and even preferred its removal, whereas Danfoss had a buyer that might wish to expand. Taylor agreed with Kirk’s assessment, and added his agreement with staff’s recommendation the commission envision a long term future for Eden Prairie. Kirk reiterated how the City’s perspective was more long term than the landowner’s perspective. Pieper asked if this had been identified as a study area during the drafting of the Comprehensive Plan, and Barnhart replied it had not been. Responding to new information received at the end of last year, staff had responded to the potential best use of this property. Danfoss had been at this site for a long time. Pieper observed Danfoss struggled with a sudden change to the land use just before a sale. Barnhart replied the mixed use expanded opportunities; at present, selling the office space for an office space use, for example, was unlikely today. PLANNING COMMISSION MINUTES June 9, 2025 Page 5 However, a property owner’s hardship, from staff’s perspective, could not be allowed to dictate 50 years of land use. Pieper asked if the large building would trigger a waiver if demolished. Barnhart replied staff had contemplated this; staff was fine with no new industrial being added. If torn down, an industrial building could be rebuilt. The west side would not be rezoned per se. Sivilay asked for and received clarification Danfoss objected to the rezoning of the west section of the property. He rhetorically asked why the Public Works facility on the southwest side just outside this property would not also be re- guided. Barnhart replied it would not due to it being government property, but he understood the analogy. The goal was to have all parcels appropriately zoned and guided. Sivilay stated he was attempting to find a happy medium. Barnhart replied commission members could in a motion voice their concern to the City Council regarding the western parcel being re-guided to Mixed Use. However, staff recommended all parcels to be re-guided Mixed Use. Kirk asked for and received clarification the Planning Commission was providing a recommendation to the City Council in terms of the long term use of the property based on the Comprehensive Plan. Sivilay suggested 24 acres could be guided Mixed Use, leaving the west unchanged. Pieper noted this was similar to the previous Comprehensive Plan Amendment that came before the commission. Sivilay added there was a great need for light industrial, and Eden Prairie along with surrounding cities had a lot of it. Barnhart stated staff received many calls to request industrial buildings, many without users or tenants identified. Industrial buildings could be marketed quickly. He urged the commission look long term rather than short term and ask what the best use of this site would be. Erickson added that during this process Danfoss had selected a developer with a collaborative approach who planned a senior housing development for the southeast corner, also villas and multifamily units with ground-floor retail. There would be an industrial-type building in the northern section but with creative features. This developer envisioned 25 percent office space for engineering, life sciences, manufacturing. While he acknowledged the great visibility and access to this site, he considered it a “tweener” site between the retail in Eden Prairie Center, and retail in Chanhassen. He urged this site not be made an island, as he considered their plan congruent with other uses in the area. There were two large industrial buildings would be leased out very quickly, as there was a large demand for industrial due in part to the Covid-19 pandemic. PLANNING COMMISSION MINUTES June 9, 2025 Page 6 Duncan asked him for a recommended solution. Erickson replied Mixed Use on south portion of east side, but the northern/northeast portion business park remaining as is or even the City buying that portion and taking the risk. Duncan asked for a zoning recommendation, and Erickson urged the zoning be consistent with Industrial Flex Tech so as to not be limited in the future. He acknowledged the existing office building was not marketable and could be re-guided. Weber asked the difference between “rezoning” and the re-guidance plan, as the two terms seemed to be used interchangeably. Barnhart replied they were not interchangeable; this was a Comprehensive Plan Amendment, not a zoning change. The Zoning Ordinance was based on the Comprehensive Plan and establishes the details of property requirements: setback, maximum height, building standards, landscaping requirements, et cetera. The current properties under consideration were guided Industrial Flex Tech. This established a general character of the property, but re-guided did not necessarily result in rezoning. Weber asked for and received confirmation a residential development would require a zoning change. Duncan asked which zoning districts fell within Mixed Use. Barnhart replied a portion could be RM2.5 and another portion zoned Office or Commercial. The guided Mixed Use offered the most flexibility. MOTION: Grote moved, seconded by Sherwood to recommend approval of the Amendment to the Comprehensive Guide Plan re-guiding the property from Industrial Flex Tech and Office to Mixed Use as recommended by the staff report dated June 9, 2025. There was discussion on the motion. Sivilay asked for and received confirmation this Amendment was not changing any zoning, but amending the Comprehensive Plan, and would not prohibit any sale of the property. Motion carried 7-1 (nay vote by Duncan). PLANNERS’ REPORT MEMBERS’ REPORTS VI. ADJOURNMENT MOTION: Taylor moved, seconded by Sherwood to adjourn. Motion carried 8-0. The meeting was adjourned at 8:02 p.m. Planning Commission Agenda Cover Memo Date: June 23, 2025 Location: 8280 Flying Cloud Drive Subject: Veridian Credit Union From: Beth Novak-Krebs, Senior Planner Applicant: Dave Knaeble with Civil Site Group Review period expires: September 6, 2025 ITEM DESCRIPTION The applicant is requesting approval to redevelop the former Mister Car Wash site at 8280 Flying Cloud Drive with a credit union. The 0.77- acre site is located at the corner of Flying Cloud Drive and Middleset Road. The proposed credit union is a new 2,889 square foot building with a drive-thru on the north side of the building. The property is located in a commercial area. REQUESTED ACTIONS • Planned Unit Development Concept Plan Review on 0.77 acres • Planned Unit Development District Review with Waivers on 0.77 acres • Site Plan Review on 0.77 acres BACKGROUND COMPREHENSIVE PLAN AND ZONING The site is guided Regional Commercial in Aspire 2040. The property is currently zoned C-Regional Service. A credit union is a permitted use in the C-Reg-Service Zoning District. SITE PLAN The site is a corner lot with frontage on Flying Cloud Drive and Middleset Road. Staff report – Veridian Credit Union June 23, 2025 Page 2 Vehicular access is provided by a shared access drive from Middleset Road. The shared access drive runs along the northwest side of the site and provides access to other businesses to the north and east. The plan includes two driveways from the shared access drive. At the request of the City, the current driveway directly into the site from Middleset Road will be eliminated because it is too close to the intersection with Flying Cloud Drive. The proposed building is situated close to Flying Cloud Drive with parking on the southwest and northwest sides of the building. The drive-thru facilities are located on the northeast side of the building with the drive lane between the building and Flying Cloud Drive. There are two drive- thru teller windows and a bypass lane. PLANNED UNIT DEVELOPMENT WAIVERS The purpose of a Planned Unit Development (PUD) as stated in the City Code is to provide for a more creative and efficient approach to the use of land within the City; to allow variety in the types of environment available to people and distribution of overall density of population and intensity of land use where desirable and feasible; and provide for greater creativity and flexibility in environmental design. Staff report – Veridian Credit Union June 23, 2025 Page 3 • Parking Setback: City Code requires a parking setback of 10 feet along a rear property line. Seven (7) of the parking stalls along the northwest property line (rear lot line) are located directly on the property line and do not meet the parking setback. The applicant is requesting a waiver to allow a 0-foot parking setback for the stalls along the rear lot line. In 1984, the subject lot and the lots to the north and east were designed together to include the shared access drive and shared parking for the benefit of the whole area. At that time, a variance was approved for a 0-foot setback for the shared parking areas that cross over the interior lot lines of the lots to the north and east. The subject property was not included in the parking variance because the site layout of the first car wash on the site did not have parking along the rear property line. Without a variance, this project requires a waiver. City staff supports the waiver. The subject property is less than an acre. Redevelopment of the site requires efficient use of all the lot to fit a building and parking on the site. Parking along the rear lot line is not out of character with parking along the shared drive on the adjacent sites and has been used without incident since the 1980’s. • Accessory Structure Setback: City Code requires a 10-foot setback from the rear property line for accessory structures. The trash and recycling enclosure is located on the rear property line. The applicant is requesting a waiver to allow a 0-foot setback for the enclosure. The site is designed so the trash enclosure is not visible from Flying Cloud Drive and minimally visible from Middleset Road. There are other trash enclosures along the shared access drive so the new enclosure is not out of character with the area. The trash dumpster for Mister Car Wash was located in the shared access drive and not enclosed or screened. TRAFFIC STUDY The applicant provided vehicle trip generation data comparing the trips when the former car wash was operating versus the proposed credit union with a drive-thru. The data indicates that the credit union with a drive-thru will generate 29 a.m. peak hour trips and 61 p.m. peak hour trips with 292 daily trips. This represents a decrease of 108 total daily trips when compared to the previous car wash use. No significant changes to area roadway traffic volumes or operations are expected. The closure of the existing driveway to the site from Middleset would reduce potential conflicts and improve safety. PARKING The project requires 14 parking stalls. The proposed plan includes 20 parking stalls. There are 6 stalls proposed along the southwest side of the building and 14 stalls on the northwest side of the building between the shared access drive and the building. Staff report – Veridian Credit Union June 23, 2025 Page 4 SIDEWALKS AND TRAILS There is an existing sidewalk along the shared access drive from Middleset to the northeast property line. The proposed plan includes a sidewalk connection from the main entrance of the building to the sidewalk along the shared access drive. In addition, there are bike racks near the main entrance to the building. While there is a shared use path along Flying Cloud Drive, grade issues do not allow for a pedestrian connection along Flying Cloud Drive. BUILDING ARCHITECTURE AND MATERIALS The property is not located in the Town Center; however, it is near the Town Center. The building and site have been designed with an understanding of its proximity to and the goals of the Town Center. The following elements of the plan help the project fit into the adjacent context as envisioned in the Town Center Design Guidelines: • The redevelopment of the site reinforces an identifiable commercial area along Flying Cloud Drive. • The building façade facing Flying Cloud Drive aligns with existing buildings along the street. • The main entrance to the building is located at the southeast corner of the building and it is emphasized by storefront windows and a change in building material and color. • Parking is mostly located at the back of the building. • Access is located along a secondary street. • The plan includes a bike rack and a pedestrian connection to the shared drive at the back of the lot. • The drive-thru lane between the building and Flying Could Drive is screened with shrubs, perennials and ornamental grasses. The proposed building has a modern look with a butterfly roof that relates to the Veridian V- Mark. All the facades comply with City Code and include recesses, projections, and changes in building material and colors. This articulation complies with City Code and provides visual variety. Staff report – Veridian Credit Union June 23, 2025 Page 5 The proposed building material includes the following Class I material: glass, cast stone, and stone veneer. The Class II material consists of aluminum composite panels and metal siding. Each façade exceeds the building material requirements. DRAINAGE/STORMWATER MANAGEMENT The applicant is proposing to use underground chambers to manage stormwater. The system is located under the drive lane on the southwest side of the building. The applicant is working with the Riley Purgatory Bluff Creek Watershed District on securing a stormwater management permit. UTILITIES Sanitary sewer and water is readily available for connection. Sanitary sewer and water lines run under Flying Cloud Drive and Middleset Road. LANDSCAPING AND TREE REPLACEMENT PLAN There are a total of 9 existing trees on the property. The 4 significant trees and one newer tree will be preserved. Four non significant trees will be removed. Tree replacement is not required. Based on the size of the building, 9 caliper inches of landscaping are required. The plan includes 9 caliper inches of landscaping. The applicant complies with the landscaping requirements on the property. The plan includes 3 trees and a variety of shrubs, ornamental grasses and perennials screening the drive thru lane, enhancing the building and softening the parking lot. There are more shrubs, grasses and perennials than are needed to satisfy the landscaping requirements, which results in a robust landscape treatment. Staff report – Veridian Credit Union June 23, 2025 Page 6 SUSTAINABILITY While waivers are requested, the project is not subject to the Building Sustainability requirements, due to the size of the building. The applicant is proposing to incorporate the following sustainable features into the project: • Use energy star rated appliances • Use Water Sense certified fixtures in its design. • Utilize native vegetation and minimize the use of irrigation SIGNS The plan shows one proposed monument sign at the southwest corner of the site and several wall signs. The applicant is required to apply for a sign permit for all the signs. All signs must comply with City Code. LIGHTING The site includes pole lighting at the perimeter of the parking lot, lighting on the building, and lighting under the drive-thru canopy. The lighting complies with City Code. STAFF RECOMMENDATION Recommend approval of the following requests: • Planned Unit Development Concept Plan Review on 0.77 acres • Planned Unit Development District Review with Waivers on 0.77 acres • Site Plan Review on 0.77 acres CONDITIONS OF APPROVAL This is based on plans dated June 10 & 11, 2025 and the following conditions: 1. Prior to the 1st reading by the City Council, the applicant must: A. Revise the Utility Plan to address the following comment: FDC location is good, don't see valve room location indicated on plan. Will riser/ valve be located in mech room and connection plumbed to opposite side? B. Clean up both the Site Plan and Utility Plan so property lines and existing D&U easements are visible/easier to see. The proposed 20' D&U easement should be labeled as proposed, should stay within property lines (in certain spots you won't have the full 20' width) and do not need to overlap the existing D&U. 2. Prior to land alteration permit issuance, the applicant must: A. Obtain permits and approvals from other agencies as needed. B. Obtain City approval of a final grading and drainage plan for the property. C. Submit construction plans and project specifications for any public infrastructure for review and approval by the City Engineer. D. Submit detailed utility and erosion control plans for review and approval by the City Engineer. E. Obtain and provide documentation of Watershed District approval. F. Notify the City and Watershed District 48 hours in advance of grading. G. Provide a construction grading limits and tree protection plan for review and approval by the City. Staff report – Veridian Credit Union June 23, 2025 Page 7 H. Install erosion control at the grading limits of the property for review and approval by the City. I. Install fencing at the construction grading limits and tree protection areas as shown on the approved plans. J. Submit and receive written approval of an executed landscape agreement. K. Submit a landscaping letter of credit or escrow equivalent to 150% of the cost of the landscaping. L. Any improvements on adjacent property may require a temporary easement. M. Obtain written approval of a Wrecking Permit for the removal of buildings on the property. N. Obtain a building permit for retaining wall construction from the City for any retaining walls greater than four feet in height. O. Submit a land alteration bond, letter of credit, or escrow surety equivalent to 125% of the cost of the land alteration. P. Provide proof that the Inspection and Maintenance Agreement for Private Stormwater Facilities has been recorded. 3. The following waivers are granted through the PUD for the project as indicated in the plans dated June 10 & 11, 2025. A. Parking Setback: City Code requires a parking setback of 10 feet along a rear property line. The waiver allows a 0-foot parking setback along the rear property line. In 1984, the subject lot and the lots to the north and east were designed together to include the shared access drive and shared parking for the benefit of the whole area. At that time, a variance was approved for a 0-foot setback for the shared parking areas that cross over the interior lot lines of the lots to the north and east. The subject property was not included in the parking variance because the site layout of the first car wash on the site did not have parking along the rear property line. Without the variance, a waiver is required. B. Accessory Structure Setback: City Code requires a 10-foot setback from the rear property line for accessory structures. The waiver allows a 0-foot setback for the trash and recycling enclosure, which is an accessory structure and it is located on the rear property line. The site is designed so the trash enclosure is not visible from Flying Cloud Drive and minimally visible from Middleset Road. There are other trash enclosures along the shared access drive so it is not out of character with the area. 4. Prior to issuance of an Occupancy Permit, the applicant must: A. Construct the retaining wall(s) in accordance with the terms of the permit and terms and conditions of Exhibit C. B. Complete implementation of the lighting plan in Exhibit B. C. Complete construction of mechanical equipment screening. D. Complete construction of the trash enclosure. Staff report – Veridian Credit Union June 23, 2025 Page 8 E. Complete implementation of the approved exterior materials and colors plan. COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 48776 David J. Knaeble LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R C000 TITLE SHEET VERIDIAN CREDIT UNION EDEN PRAIRIE, MINNESOTA SITE LOCATIONSITE LOCATION MAP N ISSUED FOR: CITY RESUBMITTAL SHEET INDEX SHEET NUMBER SHEET TITLE C000 TITLE SHEET C100 REMOVALS PLAN C110 TREE PRESERVATION PLAN C120 EXISTING CONDITIONS PLAN C200 SITE PLAN C210 TURNING MOVEMENTS C300 GRADING PLAN C400 UTILITY PLAN C500 CIVIL DETAILS C510 CIVIL DETAILS C520 CIVIL DETAILS C530 CIVIL DETAILS L100 LANDSCAPE PLAN L110 LANDSCAPE PLAN NOTES & DETAILS SW100 SWPPP - EXISTING CONDITIONS SW110 SWPPP - PROPOSED CONDITIONS SW200 SWPPP - DETAILS SW300 SWPPP - NARRATIVE PROJECT CONTACTS NAME & ADDRESS CONTACT CIVIL ENGINEER CIVIL SITE GROUP 5000 GLENWOOD AVE GOLDEN VALLEY, MN 55422 DAVE KNAEBLE 612-615-0060 DKNAEBLE@CIVILSITEGROUP.COM LANDSCAPE ARCHITECT CIVIL SITE GROUP 5000 GLENWOOD AVE GOLDEN VALLEY, MN 55422 ROB BINDER 612-615-0060 RBINDER@CIVILSITEGROUP.COM DEVELOPER VERIDIAN CREDIT UNION 5805 ROCKWELL DRIVE NE CEDAR RAPIDS, IA 52402 PROPERTY OWNER ARCHITECT THE REDMOND COMPANY W228 N745 WESTMOUND DRIVE WAUKESHA, WI 53186 NATHAN ZYWICKI 262-896-3781 NZYWICKI@THEREDMONDCO.COM SURVEYOR CIVIL SITE GROUP 5000 GLENWOOD AVE GOLDEN VALLEY, MN 55422 RORY SYNSTELIEN 612-615-0060 X 712 RORY@CIVILSITEGROUP.COM GEOTECHNICAL ENGINEER BRAUN INTERTEC 11001 HAMPSHIRE AVE S MINNEAPOLIS, MN 55348 STEVE MARTIN 612-221-2504 SMARTIN@BRAUNINTERTEC.COM REVISION SUMMARY DATE DESCRIPTION Know what's below. before you dig.Call R VERIDIAN CREDIT UNION 5805 ROCKWELL DRIVE NE CEDAR RAPIDS, IA 52402 STEVE KLEIN 319-743-6470 STEVEJK@VERIDIANCU.ORG 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.CONTRACTOR SHALL CONFIRM THAT THE EXISTING CONDITIONS FOR THE SITE MATCH WHAT IS SHOWN ON THE DRAWINGS INCLUDED PRIOR TO CONSTRUCTION. 3.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICES COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICES. 4.ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 5.CIVIL SITE GROUP SHALL HAVE NO LIABILITY WHATSOEVER FOR ANY COSTS ARISING OUT OF THE CLIENTS DECISION TO OBTAIN BIDS OR PROCEED WITH CONSTRUCTION BEFORE CIVIL SITE GROUP HAS ISSUED FINAL, FULLY-APPROVED PLANS AND SPECIFICATIONS. THE CLIENT ACKNOWLEDGES THAT ALL PRELIMINARY PLANS ARE SUBJECT TO SUBSTANTIAL REVISION UNTIL PLANS ARE FULLY APPROVED AND ALL PERMITS ARE OBTAINED. STEVE KLEIN 319-743-6470 STEVEJK@VERIDIANCU.ORG On e S t o r y B r i c k B u i l d i n g Fo u n d a t i o n A r e a = 5 , 4 9 0 S q . F t . + / - Ga r a g e Do o r Ov e r h a n g Ga r a g e D o o r Ga r a g e Do o r Bitu m i n o u s T r a i l Ke y s t o n e Re t a i n i n g W a l l / Pyl o n Si g n Ac c e s s Ac c e s s 66 . 1 6 S5 5 ° 2 4 ' 4 2 " E N34 ° 2 5 ' 1 1 " E 1 1 6 . 4 2 S5 5 ° 3 4 ' 4 9 " E 1 6 5 . 0 0 0.9 5 Δ= 0 ° 0 0 ' 5 1 " R= 3 8 5 9 . 7 2 S34 ° 3 5 ' 1 8 " W 1 7 7 . 0 0 N 5 5 ° 2 4 ' 4 2 " W 1 9 1 . 1 8 39. 8 4 Δ= 1 0 ° 0 8 ' 4 3 " R= 2 2 5 . 0 0 N34 ° 3 5 ' 1 8 " E 6 4 . 5 6 [17 ] T r a i l E a s e m e n t per D o c . N o . 9 4 3 7 7 5 5 [1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N [10 ] [ 1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N PI D : 1 4 1 1 6 2 2 3 1 0 0 3 6 Ad d r e s s : 8 2 8 0 F l y i n g C l o u d D r O w n e r : N n n R e i t L p PI D : 1 4 1 1 6 2 2 3 1 0 0 3 7 Ad d r e s s : 8 2 7 0 F l y i n g C l o u d D r O w n e r : C a r l s o n P r o p e r t i e s 8 7 2 0 L l c PID : 1 4 1 1 6 2 2 3 1 0 0 1 1 Add r e s s : 1 2 2 0 0 M i d d l e s e t R d Ow n e r : L a r i a t C o m p a n i e s I n c M I D D L E S E T R O A D FLY I N G C L O U D D R I V E ( C . S . A . H . N O . 6 1 ) 6 6 (A P u b l i c R / W ) (A P u b l i c R / W ) (W i d t h V a r i e s ) [9] R e s t r i c t e d A c c e s s per D o c . N o . 4 3 4 7 0 4 2 [14 ] H i g h w a y a n d Util i t y E a s e m e n t p e r Doc . N o . 8 3 3 6 3 0 5 [A ] C o n c r e t e W a l k 15 " R C P 18" R C P 12" R C P 15 " R C P 8" P V C 8" P V C 8" P V C ( R e c ) 6" D I P Con c r e t e W a l k [12 ] . S h a r e d A c c e s s E a s e m e n t Co n c r e t e P a r k i n g L o t Co n c r e t e Fo u n d a t i o n P o s t (T y p ) Tra s h Enc l o u s e r Woo d Gat e Ro c k La n d s c a p i n g Roc k L a n d s c a p i n g Roc k Lan d s c a p i n g Me t a l Ca n o p y [B ] R o c k La n d s c a p i n g M e t a l Bo o t h Gu a r d Ra i l Ov e r h a n g Co n c r e t e Ra m p Fo u n d Ma g Na i l Fo u n d 1 / 2 I n c h I r o n Pi p e w / C a p N o . 4 4 5 3 0 Foun d 1 / 2 I n c h Ope n I r o n P i p e Fo u n d 1 / 2 I n c h Iro n P i p e w / Ca p N o . 1 0 8 4 7 Ex i s t i n g B u i l d i n g Ro c k La n d s c a p i n g Roc k Lan d s c a p i n g [11 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N Tru n c a t e d Dom e Fou n d M a g N a i l Tru n c a t e d Dom e s [D ] 6 " P V C [C] C o n c r e t e P a d [12] . S h a r e d Acce s s E a s e m e n t CONSTRUCTION LIMITS REMOVE ALL EXISTING PRIVATE UTILITY SERVICES (THAT ARE NOT TO BE REUSED) PER PRIVATE UTILITY COMPANY AND CITY STANDARDS CONTRACTOR SHALL SAWCUT & REMOVE PUBLIC PVMTS., CURBS, AND WALKS FOR INSTALLATION OF UTILITIES. UPON COMPLETION OF UTILITY WORK, REPLACE ALL MATERIAL, IN KIND, AND TO CITY STANDARD AND APPROVAL REMOVE EX BUILDING, STRUCTURES, FOUNDATIONS, FOOTINGS & BASE MATERIALS, PER LOCAL STATE & FEDERAL STANDARDS. REMOVE/DISCONNECT ALL SERVICES & UTILITIES PER UTILITY COMPANY AND/OR L.G.U. STANDARDS REMOVE EXISTING CURB AND GUTTER, TYP. REMOVE EXISTING PAVEMENT AND BASE MATERIAL AND PARKING SIGNS, TYP. REMOVE EXISTING TREE AND BALL ROOT, TYP. EXISTING TREES TO REMAIN, PROVIDE TREE PROTECTION FENCING, TYP. REMOVE ALL EXISTING TREES & VEGETATION IN SHADED AREAS SHOWN. REMOVE ALL STUMPS & ROOT SYSTEMS. COORDINATE PROPER DISPOSAL OF MATERIALS WITH L.G.U. PROTECT EXISTING SIDEWALK PROTECT EXISTING APRON AND DRIVE ENTRANCE (7) REMOVE EXISTING CONCRETE FOUNDATIONS POSTS, TYP. REMOVE EXISTING OVERHEAD WIRES, COORDINATE WITH UTILITY OWNER (12) REMOVE EXISTING CONCRETE BOLLARD, TYP. REMOVE EXISTING WATER SERVICE, REMOVE BACK TO THE MAIN PER CITY STANDARDS, LOCATION IS APPROXIMATE, CONTRACTOR TO FIELD VERIFY REMOVE EXISTING SIGNAL LIGHT. (3) SALVAGE EXISTING LIGHT POLES, TYP. REMOVE EXISTING GAS SERVICE, COORDINATE WITH UTILITY OWNER REMOVE EXISTING SIGN SALVAGE EXISTING LIGHT POLE, TYP. REMOVE BIKE RACK (3) REMOVE CONCRETE POLE BASE, TYP. SAWCUT & REMOVE EXISTING PAVEMENT. COORD. W/ SITE PLAN FOR REPAIR AND/OR REPLACEMENT, TYP. TYPICALLY 2' WIDTH ALONG CURB SAWCUT CONCRETE AT NEAREST JOINT. MAKE SURE TO REMOVE ANY EXISTING PAVEMENT MARKINGS REMOVE EXISTING PED RAMP. PROTECT EXISTING STREET SIGN DURING CONSTRUCTION. PROTECT EXISTING HYDRANT DURING CONSTRUCTION. REMOVE EXISTING UTILITY SERVICES PER CITY OF EDEN PRAIRIE STANDARDS, COORD. W/ UTILITY CO. REMOVE TRAIL PORTION TO EXCAVATE FOR UTILITIES SAWCUT & REMOVE EXISTING PAVEMENT. COORD. W/ SITE PLAN FOR REPAIR AND/OR REPLACEMENT, TYP. TYPICALLY 2' WIDTH ALONG CURB REMOVE EXISTING FENCE AND FOOTING, TYP. REMOVALS PLAN LEGEND: TREE PROTECTION REMOVAL OF PAVEMENT AND ALL BASE MATERIAL, INCLUDING BIT., CONC., AND GRAVEL PVMTS. REMOVAL OF STRUCTURE INCLUDING ALL FOOTINGS AND FOUNDATIONS. TREE REMOVAL - INCLUDING ROOTS AND STUMPS COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 48776 David J. Knaeble LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R C100 REMOVALS PLAN REMOVE CURB AND GUTTER. IF IN RIGHT-OF-WAY, COORDINATE WITH LOCAL GOVERNING UNIT. REMOVAL NOTES: CITY OF EDEN PRAIRIE REMOVAL NOTES: 1.RESERVED FOR CITY SPECIFIC REMOVAL NOTES. 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.SEE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) PLAN FOR CONSTRUCTION STORM WATER MANAGEMENT PLAN. 3.REMOVAL OF MATERIALS NOTED ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH MNDOT, STATE AND LOCAL REGULATIONS. 4.REMOVAL OF PRIVATE UTILITIES SHALL BE COORDINATED WITH UTILITY OWNER PRIOR TO CONSTRUCTION ACTIVITIES. 5.EXISTING PAVEMENTS SHALL BE SAWCUT IN LOCATIONS AS SHOWN ON THE DRAWINGS OR THE NEAREST JOINT FOR PROPOSED PAVEMENT CONNECTIONS. 6.REMOVED MATERIALS SHALL BE DISPOSED OF TO A LEGAL OFF-SITE LOCATION AND IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 7.ABANDON, REMOVAL, CONNECTION, AND PROTECTION NOTES SHOWN ON THE DRAWINGS ARE APPROXIMATE. COORDINATE WITH PROPOSED PLANS. 8.EXISTING ON-SITE FEATURES NOT NOTED FOR REMOVAL SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE CONTRACT. 9.PROPERTY LINES SHALL BE CONSIDERED GENERAL CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED ON THE DRAWINGS. WORK WITHIN THE GENERAL CONSTRUCTION LIMITS SHALL INCLUDE STAGING, DEMOLITION AND CLEAN-UP OPERATIONS AS WELL AS CONSTRUCTION SHOWN ON THE DRAWINGS. 10.MINOR WORK OUTSIDE OF THE GENERAL CONSTRUCTION LIMITS SHALL BE ALLOWED AS SHOWN ON THE PLAN AND PER CITY REQUIREMENTS. FOR ANY WORK ON ADJACENT PRIVATE PROPERTY, THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM THE ADJACENT PROPERTY OWNER PRIOR TO ANY WORK. 11.DAMAGE BEYOND THE PROPERTY LIMITS CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED IN A MANNER APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT OR IN ACCORDANCE WITH THE CITY. 12.PROPOSED WORK (BUILDING AND CIVIL) SHALL NOT DISTURB EXISTING UTILITIES UNLESS OTHERWISE SHOWN ON THE DRAWINGS AND APPROVED BY THE CITY PRIOR TO CONSTRUCTION. 13.SITE SECURITY MAY BE NECESSARY AND PROVIDED IN A MANNER TO PROHIBIT VANDALISM, AND THEFT, DURING AND AFTER NORMAL WORK HOURS, THROUGHOUT THE DURATION OF THE CONTRACT. SECURITY MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY. 14.VEHICULAR ACCESS TO THE SITE SHALL BE MAINTAINED FOR DELIVERY AND INSPECTION ACCESS DURING NORMAL OPERATING HOURS. AT NO POINT THROUGHOUT THE DURATION OF THE CONTRACT SHALL CIRCULATION OF ADJACENT STREETS BE BLOCKED WITHOUT APPROVAL BY THE CITY PRIOR TO CONSTRUCTION ACTIVITIES. 15.ALL TRAFFIC CONTROLS SHALL BE PROVIDED AND ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, SIGNAGE, BARRICADES, FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY. 16.SHORING FOR BUILDING EXCAVATION MAY BE USED AT THE DISCRETION OF THE CONTRACTOR AND AS APPROVED BY THE OWNERS REPRESENTATIVE AND THE CITY PRIOR TO CONSTRUCTION ACTIVITIES. 17.STAGING, DEMOLITION, AND CLEAN-UP AREAS SHALL BE WITHIN THE PROPERTY LIMITS AS SHOWN ON THE DRAWINGS AND MAINTAINED IN A MANNER AS REQUIRED BY THE CITY. 18.ALL EXISTING SITE TRAFFIC/REGULATORY SIGNAGE TO BE INVENTORIED AND IF REMOVED FOR CONSTRUCTION SHALL BE RETURNED TO LGU. 19.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. SEE SWPPP ON SHEETS SW100 - SW300 EROSION CONTROL NOTES:CONSTRUCTION LIMITS REVISION SUMMARY DATE DESCRIPTION PROPERTY LINE REMOVAL OF TREES AND VEGETATION INCLUDING STUMPS AND ROOT SYSTEMS 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R OWNER INFORMATION VERIDIAN CREDIT UNION 5805 ROCKWELL DRIVE NE CEDAR RAPIDS, IA 52402 STEVE KLEIN 319-743-6470 STEVEJK@VERIDIANCU.ORG On e S t o r y B r i c k B u i l d i n g Fo u n d a t i o n A r e a = 5 , 4 9 0 S q . F t . + / - Ga r a g e Do o r Ov e r h a n g Ga r a g e D o o r Ga r a g e Do o r Bitu m i n o u s T r a i l Ke y s t o n e Re t a i n i n g W a l l / Pyl o n Si g n Ac c e s s Ac c e s s 66 . 1 6 S5 5 ° 2 4 ' 4 2 " E N34 ° 2 5 ' 1 1 " E 1 1 6 . 4 2 S5 5 ° 3 4 ' 4 9 " E 1 6 5 . 0 0 0.9 5 Δ= 0 ° 0 0 ' 5 1 " R= 3 8 5 9 . 7 2 S34 ° 3 5 ' 1 8 " W 1 7 7 . 0 0 N 5 5 ° 2 4 ' 4 2 " W 1 9 1 . 1 8 39. 8 4 Δ= 1 0 ° 0 8 ' 4 3 " R= 2 2 5 . 0 0 N34 ° 3 5 ' 1 8 " E 6 4 . 5 6 [17 ] T r a i l E a s e m e n t per D o c . N o . 9 4 3 7 7 5 5 [1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N [10 ] [ 1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N PI D : 1 4 1 1 6 2 2 3 1 0 0 3 6 Ad d r e s s : 8 2 8 0 F l y i n g C l o u d D r O w n e r : N n n R e i t L p PI D : 1 4 1 1 6 2 2 3 1 0 0 3 7 Ad d r e s s : 8 2 7 0 F l y i n g C l o u d D r O w n e r : C a r l s o n P r o p e r t i e s 8 7 2 0 L l c PID : 1 4 1 1 6 2 2 3 1 0 0 1 1 Add r e s s : 1 2 2 0 0 M i d d l e s e t R d Ow n e r : L a r i a t C o m p a n i e s I n c M I D D L E S E T R O A D FLY I N G C L O U D D R I V E ( C . S . A . H . N O . 6 1 ) 6 6 (A P u b l i c R / W ) (A P u b l i c R / W ) (W i d t h V a r i e s ) [9] R e s t r i c t e d A c c e s s per D o c . N o . 4 3 4 7 0 4 2 [14 ] H i g h w a y a n d Util i t y E a s e m e n t p e r Doc . N o . 8 3 3 6 3 0 5 [A ] C o n c r e t e W a l k 15 " R C P 18" R C P 12" R C P 15 " R C P 8" P V C 8" P V C 8" P V C ( R e c ) 6" D I P Con c r e t e W a l k [12 ] . S h a r e d A c c e s s E a s e m e n t Co n c r e t e P a r k i n g L o t Co n c r e t e Fo u n d a t i o n P o s t (T y p ) Tra s h Enc l o u s e r Woo d Gat e Ro c k La n d s c a p i n g Roc k L a n d s c a p i n g Roc k Lan d s c a p i n g Me t a l Ca n o p y [B ] R o c k La n d s c a p i n g M e t a l Bo o t h Gu a r d Ra i l Ov e r h a n g Co n c r e t e Ra m p Fo u n d Ma g Na i l Fo u n d 1 / 2 I n c h I r o n Pi p e w / C a p N o . 4 4 5 3 0 Foun d 1 / 2 I n c h Ope n I r o n P i p e Fo u n d 1 / 2 I n c h Iro n P i p e w / Ca p N o . 1 0 8 4 7 Ex i s t i n g B u i l d i n g Ro c k La n d s c a p i n g Roc k Lan d s c a p i n g [11 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N Tru n c a t e d Dom e Fou n d M a g N a i l Tru n c a t e d Dom e s [D ] 6 " P V C [C] C o n c r e t e P a d [12] . S h a r e d Acce s s E a s e m e n t CONSTRUCTION LIMITS REMOVE EXISTING TREE AND BALL ROOT, TYP. EXISTING TREES TO REMAIN, PROVIDE TREE PROTECTION FENCING, TYP. TREE PRESERVATION PLAN LEGEND: TREE PROTECTION TREE REMOVAL - INCLUDING ROOTS AND STUMPS COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 48776 David J. Knaeble LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R C110 TREE PRESERVATION PLAN CONSTRUCTION LIMITS REVISION SUMMARY DATE DESCRIPTION PROPERTY LINE 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R TREE PROTECTION N T S 25' DL DRIPLINE WIDTH FURNISH AND INSTALL TEMPORARY FENCE AT THE TREE'S DRIP LINE OR CONSTRUCTION LIMITS AS SHOWN ON PLAN, PRIOR TO ANY CONSTRUCTION. WHERE POSSIBLE PLACE FENCE 25' BEYOND DRIP LINE. PLACE TREE PROTECTION SIGN ON POSTS, ONE PER INDIVIDUAL TREE (FACING CONSTRUCTION ACTIVITY), OR ONE EVERY 100' LF ALONG A GROVE OR MULTI-TREE PROTECTION AREA. POSTS AND FENCING EXTEND FENCE 25' BEYOND DRIPLINE WHERE POSSIBLE TREE PROTECTION SIGN, TYP. TREE DRIPLINE, OR CONSTRUCTION LIMITS 1 Ga r a g e Do o r Ov e r h a n g Ga r a g e Do o r Ga r a g e Do o r Ke y s t o n e Ret a i n i n g Wa l l / Pyl o n Sig n Acc e s s Acc e s s [17 ] T r a i l E a s e m e n t per D o c . N o . 9 4 3 7 7 5 5 PI D : 1 4 1 1 6 2 2 3 1 0 0 3 6 Ad d r e s s : 8 2 8 0 F l y i n g C l o u d D r Ow n e r : N n n R e i t L p MI D D L E S E T R O A D FLY I N G C L O U D D R I V E ( C . S . A . H . N O . 6 1 ) 6 6 (A P u b l i c R / W ) (A P u b l i c R / W ) (Wi d t h V a r i e s ) 15" R C P 18" R C P 12" R C P 15 " R C P 8" P V C 8" P V C 8" PVC ( R e c ) 6" D I P [12 ] . S h a r e d A c c e s s E a s e m e n t Co n c r e t e P a r k i n g L o t Co n c r e t e Fo u n d a t i o n P o s t (T y p ) Tra s h Enc l o u s e r Woo d Gat e Ro c k La n d s c a p i n g Roc k L a n d s c a p i n g Roc k Lan d s c a p i n g Met a l Ca n o p y Me t a l Bo o t h Gu a r d Rail Ov e r h a n g Co n c r e t e Ra m p Roc k Lan d s c a p i n g [D] 6 " P V C [12]. S h a r e d Acces s E a s e m e n t COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 48776 David J. Knaeble LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R C120 EXISTING CONDITIONS PLAN REVISION SUMMARY DATE DESCRIPTION 0 1" = 40'-0" 40'-0"20'-0" N Know what's below. before you dig.Call R Bitu m i n o u s T r a i l Ac c e s s Ac c e s s [17 ] T r a i l E a s e m e n t per D o c . N o . 9 4 3 7 7 5 5 [1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N [10 ] [ 1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N PI D : 1 4 1 1 6 2 2 3 1 0 0 3 7 Ad d r e s s : 8 2 7 0 F l y i n g C l o u d D r O w n e r : C a r l s o n P r o p e r t i e s 8 7 2 0 L l c PID : 1 4 1 1 6 2 2 3 1 0 0 1 1 Add r e s s : 1 2 2 0 0 M i d d l e s e t R d Ow n e r : L a r i a t C o m p a n i e s I n c M I D D L E S E T R O A D FLY I N G C L O U D D R I V E ( C . S . A . H . N O . 6 1 ) (A P u b l i c R / W ) (A P u b l i c R / W ) (W i d t h V a r i e s ) [9] R e s t r i c t e d A c c e s s per D o c . N o . 4 3 4 7 0 4 2 [14 ] H i g h w a y a n d Util i t y E a s e m e n t p e r Doc . N o . 8 3 3 6 3 0 5 [A ] C o n c r e t e W a l k 15 " R C P 18" R C P 12" R C P 15 " R C P 8" P V C 8" P V C 8" P V C ( R e c ) 6" D I P Con c r e t e W a l k [12 ] . S h a r e d A c c e s s E a s e m e n t [B ] R o c k La n d s c a p i n g Fo u n d Ma g Na i l Fo u n d 1 / 2 I n c h I r o n Pi p e w / C a p N o . 4 4 5 3 0 Foun d 1 / 2 I n c h Ope n I r o n P i p e Fo u n d 1 / 2 I n c h Iro n P i p e w / Ca p N o . 1 0 8 4 7 Ro c k La n d s c a p i n g [11 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N Tru n c a t e d Dom e Fou n d M a g N a i l Tru n c a t e d Dom e s [D ] 6 " P V C [C] C o n c r e t e P a d [12] . S h a r e d Acce s s E a s e m e n t REF. 112 116 113 114a 115 105 106 107 100 b 114 b 108 109 100a IT / D A T A 106 MECH . / C U S T . 105 WOM E N ' S R E S T . 113 MEN ' S R E S T . 112 QUIE T R O O M 116 BRE A K R O O M 114 N/D115 OFFIC E 107 OFFI C E 108 OFFI C E 109 VEST I B U L E 100 TELL E R W O R K A R E A 104 TELL E R A R E A 103 COR R I D O R 111 REFR E S H M E N T A R E A 110 MEM B E R L O B B Y A R E A 101 WAIT I N G A R E A 102 S3C S11 S3CS11 S3CS11 S8AS11 S3C S11 S3CS11 S3B S11 S3B S11 S3AS11 S2AS01 S8AS11 S3AS21 S6AS11 S6AS11 S6CS11 S3A01 S3AS11 S3E01 S3B01 S3E01 S3A S11 S3AS01 S3C S11 8.6 9 ° 8.6 8 ° S3E01 S3AS01 20' S I D E B U I L D I N G S E T B A C K 35' F R O N T B U I L D I N G & PA R K I N G S E T B A C K 35' F R O N T B U I L D I N G & P A R K I N G S E T B A C K 10' P A R K I N G S E T B A C K 13 . 0 24 . 0 18 . 0 24. 0 18. 0 14. 0 24. 0 14. 3 9.0 5.09.0 13. 0 R1 0 . 0 R10.0 R3 . 0 R3 . 0 R20. 0 NOPA R K I N G 18. 0 7 6 7 R10.0 R25.0 R 2 5 . 0 R 8 . 0 R2.0 BYP A S S LAN E 9.0 48. 2 R8.0 R5.0 R3.0 R 3 . 0 R10.0 R 3 . 0 R10. 0 R 8 . 0 R20. 0 6. 7 6.0 9. 0 9. 0 PROPOSED CREDIT UNION BUILDING MAIN BUILDING ENTRY MODULAR BLOCK RETAINING WALL WITH RAILING, DESIGNED BY OTHERS EMPLOYEE ENTRY NOT ACCESSIBLE SIDEWALK, MATCHES EXISTING DRIVE ACCESSIBLE PARKING SPACE, INCL. SIGNAGE, STRIPING AND RAMPS CONCRETE PVMT., TYP, SEE FINAL GEOTECH FOR THICKNESS ACCESSIBLE CURB RAMPS, TYP. SEE DETAILS. CROSSWALK STRIPING, TYP. TRASH ENCLOSURE, SEE ARCH'L PLANS FOR DETAILS DIRECTIONAL ARROW PVMT. MARKING MATCH EXISTING CURB AND GUTTER, TYP. MATCH EXISTING CURB AND GUTTER, TYP. B612 C&G, TYP. PVMT. STRIPING TYP. MATCH EXISTING SIDEWALK, TYP. NEW CONCRETE WALK, TYP. SEE DETAIL CONTRACTOR IS RESPONSIBLE TO INSTALL ANY SIDEWALK AND CURBING PER DESIGN PLAN. CONTRACTOR TO VERIFY ALL CURBS AND SIDEWALKS WILL DRAIN PROPERLY IN FIELD CONDITIONS. CONTRACTOR MUST CONTACT THE CIVIL ENGINEER 24-HOURS PRIOR TO ANY CURB AND/OR SIDEWALK INSTALLATION TO REVIEW AND INSPECT CURB STAKES. CONTRACTOR IS RESPONSIBLE FOR ANY CURB OR SIDEWALK REPLACEMENT IF THIS PROCEDURE IS NOT FOLLOWED. CONSTRUCTION LIMITS (2) "HOOP" STYLE BIKE RACK (4 SPACES), SURFACE MOUNT PER MANUF. SPECS. REPLACE CURB AND GUTTER TO MATCH EXISTING, TYP. 69. 2 43 . 4 71. 0 51. 6 45 . 0 6.0 INFILL WITH CONCRETE PAVEMENT STRIPE (2) DO NOT ENTER SIGNS MONUMENT SIGN REPLACE CURB AND GUTTER TO MATCH EXISTING, TYP. PATCH ASPHALT TO CITY OF EDEN PRAIRIE SPECIFICATION. ONE-WAY DIRECTION CURB RAMP PER MNDOT DETAILS. COORD. W/COUNTY AND CITY ON FINAL DETAILS. PED RAMP PER MNDOT DETAILS. CONC. APRON. REPLACE TO MATCH EXISTING. REMOVE ASPHALT AS NECESSARY TO TAPER PAVEMENT. COORD. W/ CIVIL ENGINEER AND CITY. 24" VALLEY GUTTER, THROUGH APRON 233 SF OF PARKING LOT ISLANDS 170 SF OF PARKING LOT ISLANDS 161 SF OF PARKING LOT ISLANDS SNOW STORAGE SNOW STORAGE REPLACE TRAIL TO MATCH EXISTING ELEVATIONS SITE LIGHTING, TYP. 202 SF OF PARKING LOT ISLANDS 20' UTILITY EASEMENT 16 5 . 0 116 . 4 66. 4 64. 9 23 1 . 3 177 . 9 41 . 3 SUMMARY SITE DATA ZONING SUMMARY EXISTING ZONING C - REGIONAL SERVICE COMMERCIAL PROPOSED ZONING C - REGIONAL SERVICE COMMERCIAL REQUIRED PROVIDED BUILDING SETBACKS FRONT 35' - 0"41' - 0" REAR SIDE 10'-0"70' - 0"/48' - 0" PARKING SETBACKS FRONT 35' - 0"41'-0"/69'-0" REAR SIDE 10'-0"44' - 0"/35' - 0" REQUIRED PROVIDED PARKING SUMMARY PARKING STALL DIMENSIONS 9'-0" X 18'-0"9'-0" X 18'-0" COMPACT PARKING STALL DIMENSIONS DRIVE AISLE DIMENSIONS 24'-0"24'-0" FIRE ACCESS ROAD DIMENSIONS REQUIRED PROVIDED PARKING STALLS - SURFACE 15 19 BUILDING HEIGHT 40'-0"25'-9" SUMMARY BUILDING SQUARE FOOTAGE 2889 PARKING REQUIRED SPACES 15 PROVIDED SPACES 19 PARKING LOT SQUARE FOOTAGE 4889 REQUIRED ISLAND SQUARE FOOTAGE 244 PROVIDED ISLAND SQUARE FOOTAGE 766 COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 48776 David J. Knaeble LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R SITE LAYOUT NOTES: SITE PLAN LEGEND: TRAFFIC DIRECTIONAL ARROW PAVEMENT MARKINGS SIGN AND POST ASSEMBLY. SHOP DRAWINGS REQUIRED. HC = ACCESSIBLE SIGN NP = NO PARKING FIRE LANE ONE = ONE WAY CP = COMPACT CAR PARKING ONLY PROPERTY LINE CURB AND GUTTER-SEE NOTES (T.O.) TIP OUT GUTTER WHERE APPLICABLE-SEE PLAN CONSTRUCTION LIMITS TO CITY OF EDEN PRAIRIE SITE SPECIFIC NOTES: 1.STRUCTURE WILL REQUIRE NFPA 13 COMPLIANT SPRINKLER HEADS. 2.A PERMIT WILL BE REQUIRED FROM THE ENGINEERING DIVISION FOR ALL WORK WITH PUBLIC ROW. 3.SALT FOR PARKING LOT SHALL BE STORED OFFSITE AND APPLIED BY SNOW REMOVAL COMPANY. ACCESSIBILITY ROUTE ARROW (IF APPLICABLE) DO NOT PAINT. 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.CONTRACTOR SHALL VERIFY LOCATIONS AND LAYOUT OF ALL SITE ELEMENTS PRIOR TO BEGINNING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, LOCATIONS OF EXISTING AND PROPOSED PROPERTY LINES, EASEMENTS, SETBACKS, UTILITIES, BUILDINGS AND PAVEMENTS. CONTRACTOR IS RESPONSIBLE FOR FINAL LOCATIONS OF ALL ELEMENTS FOR THE SITE. ANY REVISIONS REQUIRED AFTER COMMENCEMENT OF CONSTRUCTION, DUE TO LOCATIONAL ADJUSTMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO OWNER. ADJUSTMENTS TO THE LAYOUT SHALL BE APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF MATERIALS. STAKE LAYOUT FOR APPROVAL. 3.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, INCLUDING A RIGHT-OF-WAY AND STREET OPENING PERMIT. 4.THE CONTRACTOR SHALL VERIFY RECOMMENDATIONS NOTED IN THE GEO TECHNICAL REPORT PRIOR TO INSTALLATION OF SITE IMPROVEMENT MATERIALS. 5.CONTRACTOR SHALL FIELD VERIFY COORDINATES AND LOCATION DIMENSIONS & ELEVATIONS OF THE BUILDING AND STAKE FOR REVIEW AND APPROVAL BY THE OWNERS REPRESENTATIVE PRIOR TO INSTALLATION OF FOOTING MATERIALS. 6.LOCATIONS OF STRUCTURES, ROADWAY PAVEMENTS, CURBS AND GUTTERS, BOLLARDS, AND WALKS ARE APPROXIMATE AND SHALL BE STAKED IN THE FIELD, PRIOR TO INSTALLATION, FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT. 7.CURB DIMENSIONS SHOWN ARE TO FACE OF CURB. BUILDING DIMENSIONS ARE TO FACE OF CONCRETE FOUNDATION. LOCATION OF BUILDING IS TO BUILDING FOUNDATION AND SHALL BE AS SHOWN ON THE DRAWINGS. 8.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OR SAMPLES AS SPECIFIED FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO FABRICATION FOR ALL PREFABRICATED SITE IMPROVEMENT MATERIALS SUCH AS, BUT NOT LIMITED TO THE FOLLOWING, FURNISHINGS, PAVEMENTS, WALLS, RAILINGS, BENCHES, FLAGPOLES, LANDING PADS FOR CURB RAMPS, AND LIGHT AND POLES. THE OWNER RESERVES THE RIGHT TO REJECT INSTALLED MATERIALS NOT PREVIOUSLY APPROVED. 9.PEDESTRIAN CURB RAMPS SHALL BE CONSTRUCTED WITH TRUNCATED DOME LANDING AREAS IN ACCORDANCE WITH A.D.A. REQUIREMENTS-SEE DETAIL. 10.CROSSWALK STRIPING SHALL BE 24" WIDE WHITE PAINTED LINE, SPACED 48" ON CENTER PERPENDICULAR TO THE FLOW OF TRAFFIC. WIDTH OF CROSSWALK SHALL BE 5' WIDE. ALL OTHER PAVEMENT MARKINGS SHALL BE WHITE IN COLOR UNLESS OTHERWISE NOTED OR REQUIRED BY ADA OR LOCAL GOVERNING BODIES. 11.SEE SITE PLAN FOR CURB AND GUTTER TYPE. TAPER BETWEEN CURB TYPES-SEE DETAIL. 12.ALL CURB RADII ARE MINIMUM 3' UNLESS OTHERWISE NOTED. 13.CONTRACTOR SHALL REFER TO FINAL PLAT FOR LOT BOUNDARIES, NUMBERS, AREAS AND DIMENSIONS PRIOR TO SITE IMPROVEMENTS. 14.FIELD VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS. 15.PARKING IS TO BE SET PARALLEL OR PERPENDICULAR TO EXISTING BUILDING UNLESS NOTED OTHERWISE. 16.ALL PARKING LOT PAINT STRIPING TO BE WHITE, 4" WIDE TYP. 17.BITUMINOUS PAVING TO BE "LIGHT DUTY" UNLESS OTHERWISE NOTED. SEE DETAIL SHEETS FOR PAVEMENT SECTIONS. 18.ALL TREES THAT ARE TO REMAIN ARE TO BE PROTECTED FROM DAMAGE WITH A CONSTRUCTION FENCE AT THE DRIP LINE. SEE LANDSCAPE DOCUMENTS. 19.CONTRACTOR IS RESPONSIBLE TO INSTALL ANY SIDEWALK AND CURBING PER DESIGN PLAN. CONTRACTOR TO VERIFY ALL CURBS AND SIDEWALKS WILL DRAIN PROPERLY IN FIELD CONDITIONS. CONTRACTOR MUST CONTACT THE CIVIL ENGINEER 24-HOURS PRIOR TO ANY CURB AND/OR SIDEWALK INSTALLATION TO REVIEW AND INSPECT CURB STAKES. CONTRACTOR IS RESPONSIBLE FOR ANY CURB OR SIDEWALK REPLACEMENT IF THIS PROCEDURE IS NOT FOLLOWED. 20.FINISH GRADING FOR HARDSCAPE AREAS IE. PARKING LOTS, CURBS, SIDEWALKS SHALL BE WITHIN 0.05 FEET. ADA AREAS MUST COMPLY WITH REQUIREMENTS ON PLANS AND ADA REGULATIONS. TOLERANCE WITHIN ADA AREAS IS 0.00 FEET DISCUSS ANY DEVIATIONS WITH ENGINEER PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ANY CURB, SIDEWALK AND/OR PAVEMENT REPLACEMENT THAT DOES NOT MEET TOLERANCE/ADA REQUIREMENTS. CONCRETE PAVEMENT (IF APPLICABLE) AS SPECIFIED (PAD OR WALK) SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & CONCRETE DEPTHS, WITHIN ROW SEE CITY DETAIL, WITHIN PRIVATE PROPERTY SEE CSG DETAIL OPERATIONAL NOTES SNOW REMOVAL ALL SNOW SHALL BE STORED ON-SITE OUTSIDE PARKING LOT. WHEN FULL, REMOVAL CO. SHALL REMOVE EXCESS OFF-SITE. TRASH REMOVAL TRASH SHALL BE PLACED IN EXTERIOR TRASH AREA AND REMOVED BY COMMERCIAL CO. WEEKLY. DELIVERIES DELIVERIES SHALL OCCUR AT THE FRONT DOOR VIA STANDARD COMMERCIAL DELIVERY VEHICLES (UPS, FED-EX, USPS). REVISION SUMMARY DATE DESCRIPTION C200 SITE PLAN SEE SHEET C0.1 FOR GENERAL SITE NOTES 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R OWNER INFORMATION VERIDIAN CREDIT UNION 5805 ROCKWELL DRIVE NE CEDAR RAPIDS, IA 52402 STEVE KLEIN 319-743-6470 STEVEJK@VERIDIANCU.ORG CONCRETE PAVEMENT (IF APPLICABLE) AS SPECIFIED (DRIVE) SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & CONCRETE DEPTHS, WITHIN ROW SEE CITY DETAIL, WITHIN PRIVATE PROPERTY SEE CSG DETAIL On e S t o r y B r i c k B u i l d i n g Fo u n d a t i o n A r e a = 5 , 4 9 0 S q . F t . + / - Bitu m i n o u s T r a i l Ac c e s s Ac c e s s 66 . 1 6 S5 5 ° 2 4 ' 4 2 " E N34 ° 2 5 ' 1 1 " E 1 1 6 . 4 2 S5 5 ° 3 4 ' 4 9 " E 1 6 5 . 0 0 0.9 5 Δ= 0 ° 0 0 ' 5 1 " R= 3 8 5 9 . 7 2 S34 ° 3 5 ' 1 8 " W 1 7 7 . 0 0 N 5 5 ° 2 4 ' 4 2 " W 1 9 1 . 1 8 39. 8 4 Δ= 1 0 ° 0 8 ' 4 3 " R= 2 2 5 . 0 0 N34 ° 3 5 ' 1 8 " E 6 4 . 5 6 [17 ] T r a i l E a s e m e n t per D o c . N o . 9 4 3 7 7 5 5 [1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N [10 ] [ 1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N PI D : 1 4 1 1 6 2 2 3 1 0 0 3 6 Ad d r e s s : 8 2 8 0 F l y i n g C l o u d D r O w n e r : N n n R e i t L p PI D : 1 4 1 1 6 2 2 3 1 0 0 3 7 Ad d r e s s : 8 2 7 0 F l y i n g C l o u d D r O w n e r : C a r l s o n P r o p e r t i e s 8 7 2 0 L l c PID : 1 4 1 1 6 2 2 3 1 0 0 1 1 Add r e s s : 1 2 2 0 0 M i d d l e s e t R d Ow n e r : L a r i a t C o m p a n i e s I n c M I D D L E S E T R O A D FLY I N G C L O U D D R I V E ( C . S . A . H . N O . 6 1 ) (A P u b l i c R / W ) (A P u b l i c R / W ) (W i d t h V a r i e s ) [9] R e s t r i c t e d A c c e s s per D o c . N o . 4 3 4 7 0 4 2 [14 ] H i g h w a y a n d Util i t y E a s e m e n t p e r Doc . N o . 8 3 3 6 3 0 5 [A ] C o n c r e t e W a l k 15 " R C P 18" R C P 12" R C P 15 " R C P 8" P V C 8" P V C 8" P V C ( R e c ) 6" D I P Con c r e t e W a l k [12 ] . S h a r e d A c c e s s E a s e m e n t [B ] R o c k La n d s c a p i n g Fo u n d Ma g Na i l Fo u n d 1 / 2 I n c h I r o n Pi p e w / C a p N o . 4 4 5 3 0 Foun d 1 / 2 I n c h Ope n I r o n P i p e Fo u n d 1 / 2 I n c h Iro n P i p e w / Ca p N o . 1 0 8 4 7 Ex i s t i n g B u i l d i n g Ro c k La n d s c a p i n g [11 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N Tru n c a t e d Dom e Fou n d M a g N a i l Tru n c a t e d Dom e s [D ] 6 " P V C [C] C o n c r e t e P a d [12] . S h a r e d Acce s s E a s e m e n t REF. 112 116 113 114a 115 105 106 107 100 b 114 b 108 109 100a IT / D A T A 106 MECH . / C U S T . 105 WOM E N ' S R E S T . 113 MEN ' S R E S T . 112 QUIE T R O O M 116 BRE A K R O O M 114 N/D115 OFFIC E 107 OFFI C E 108 OFFI C E 109 VEST I B U L E 100 TELL E R W O R K A R E A 104 TELL E R A R E A 103 COR R I D O R 111 REFR E S H M E N T A R E A 110 MEM B E R L O B B Y A R E A 101 WAIT I N G A R E A 102 S3C S11 S3CS11 S3CS11 S8AS11 S3C S11 S3CS11 S3B S11 S3B S11 S3AS11 S2AS01 S8AS11 S3AS21 S6AS11 S6AS11 S6CS11 S3A01 S3AS11 S3E01 S3B01 S3E01 S3A S11 S3AS01 S3C S11 8.6 9 ° 8.6 8 ° S3E01 S3AS01 NOPA R K I N G CONSTRUCTION LIMITS SB-1 SB-2 SB-3 ADJUST WATER MAIN AS NECESSARY TO PROVIDE 18" SEPARATION FROM STORM CROSSING EOF= 864.75 EOF= 862.26 COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 48776 David J. Knaeble LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R C300 GRADING PLAN GENERAL GRADING NOTES: 1.0' CONTOUR ELEVATION INTERVAL GRADING PLAN LEGEND: SPOT GRADE ELEVATION GUTTER SPOT GRADE ELEVATION TOP OF CURB SPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRS CITY OF EDEN PRAIRIE GRADING NOTES: 1.RESERVED FOR CITY SPECIFIC GRADING NOTES. EX. 1' CONTOUR ELEVATION INTERVAL SPOT GRADE ELEVATION (GUTTER/FLOW LINE UNLESS OTHERWISE NOTED) CURB AND GUTTER (T.O = TIP OUT) EMERGENCY OVERFLOW 41.26 1125 891.00 G 891.00 TC 891.00 BS/TS 1137 EOF=862.26, 864.75 TO SPOT GRADE ELEVATION MATCH EXISTING891.00 ME GB GRADE BREAK - HIGH POINTS 1.CONTRACTOR SHALL VERIFY ALL BUILDING ELEVATIONS, (FFE, LFE, GFE), PRIOR TO CONSTRUCTION BY CROSS CHECKING WITH ARCHITECTURAL, STRUCTURAL AND CIVIL ELEVATIONS FOR EQUIVALENT "100" ELEVATIONS. THIS MUST BE DONE PRIOR TO EXCAVATION AND INSTALLATION OF ANY FOOTING MATERIALS. VERIFICATION OF THIS COORDINATION SHALL BE CONFIRMED IN WRITING BY CIVIL, SURVEYOR, ARCHITECTURAL, STRUCTURAL AND CONTRACTOR PRIOR TO CONSTRUCTION. 2.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 3.SEE SITE PLAN FOR HORIZONTAL LAYOUT & GENERAL GRADING NOTES. 4.THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION (INCLUDING BUT NOT LIMITED TO SITE PREPARATION, SOIL CORRECTION, EXCAVATION, EMBANKMENT, ETC.) IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER. 5.ANY ELEMENTS OF AN EARTH RETENTION SYSTEM AND RELATED EXCAVATIONS THAT FALL WITHIN THE PUBLIC RIGHT OF WAY WILL REQUIRE A “RIGHT OF WAY EXCAVATION PERMIT”. CONTRACTOR IS RESPONSIBLE FOR AQUIRING THIS PERMIT PRIOR TO CONSTRUCTION IF APPLICABLE 6.GRADING AND EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS & PERMIT REQUIREMENTS OF THE CITY. 7.PROPOSED SPOT GRADES ARE FLOW-LINE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE NOTED. 8.GRADES OF WALKS SHALL BE INSTALLED WITH 5% MAX. LONGITUDINAL SLOPE AND 1% MIN. AND 2% MAX. CROSS SLOPE, UNLESS OTHERWISE NOTED. 9.PROPOSED SLOPES SHALL NOT EXCEED 3:1 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. MAXIMUM SLOPES IN MAINTAINED AREAS IS 4:1. 10.PROPOSED RETAINING WALLS, FREESTANDING WALLS, OR COMBINATION OF WALL TYPES GREATER THAN 4' IN HEIGHT SHALL BE DESIGNED AND ENGINEERED BY A REGISTERED RETAINING WALL ENGINEER. DESIGN DRAWINGS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. 11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF GRADE STAKES THROUGHOUT THE DURATION OF CONSTRUCTION TO ESTABLISH PROPER GRADES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR A FINAL FIELD CHECK OF FINISHED GRADES ACCEPTABLE TO THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO TOPSOIL AND SODDING ACTIVITIES. 12.IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE. 13.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THE CONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 6 INCHES. 14.FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE BEEN FINISH GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED BY TRAFFIC OR ERODED BY WATER OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK. 15.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND/OR PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. NO TEST ROLL SHALL OCCUR WITHIN 10' OF ANY UNDERGROUND STORM RETENTION/DETENTION SYSTEMS. 16.AN OSHA-APPROVED QUALIFIED PERSON SHOULD REVIEW THE SOIL CLASSIFICATION PRESENTED IN THE GEOTECHNICAL REPORT IN THE FIELD. EXCAVATIONS MUST COMPLY WITH CURRENT OSHA REQUIREMENTS IN THE CODE OF FEDERAL REGULATIONS PERTAINING TO EXCAVATIONS AND TRENCHES. EXCAVATION SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR. 17.TOLERANCES 17.1.THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 17.2.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE. 17.3.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. 17.4.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. 17.5.FINISH GRADING FOR HARDSCAPE AREAS IE. PARKING LOTS, CURBS, SIDEWALKS SHALL BE WITHIN 0.05 FEET. ADA AREAS MUST COMPLY WITH REQUIREMENTS ON PLANS AND ADA REGULATIONS. TOLERANCE WITHIN ADA AREAS IS 0.00 FEET DISCUSS ANY DEVIATIONS WITH ENGINEER PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ANY CURB, SIDEWALK AND/OR PAVEMENT REPLACEMENT THAT DOES NOT MEET TOLERANCE/ADA REQUIREMENTS. 18.MAINTENANCE 18.1.THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP AREA FREE OF TRASH AND DEBRIS. 18.2.CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED AND RUTTED AREAS TO SPECIFIED TOLERANCES. DURING THE CONSTRUCTION, IF REQUIRED, AND DURING THE WARRANTY PERIOD, ERODED AREAS WHERE TURF IS TO BE ESTABLISHED SHALL BE RESEEDED AND MULCHED. 18.3.WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION OPERATIONS OR ADVERSE WEATHER, CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE, AND COMPACT TO REQUIRED DENSITY PRIOR TO FURTHER CONSTRUCTION. SEE SWPPP ON SHEETS SW100 - SW300 EROSION CONTROL NOTES: CONSTRUCTION LIMITS REVISION SUMMARY DATE DESCRIPTION 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R CUT/FILL CALCULATIONS: CUT = 1215 CY FILL = 25 CY NET = 1190 CY EXPORT RILEY-PURGATORY-BLUFF CREEK (RPBCWD) SITE SPECIFIC NOTES: 1.ALL PERVIOUS AREAS COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUST BE DECOMPACTIED TO ACHIEVE A SOIL COMPACTION TESTING PRESSURE OF LESS THAN 1,400 KILOPASCALS OR 200 LBS PER SQUARE INCH IN THE UPPER 12 INCHES OF THE SOIL PROFILE WHILE TAKING CARE TO PROTECT UTILITIES, TREE ROOTS, AND OTHER EXISTING VEGETATION. 2.TOPSOIL SHALL CONTAIN A MINIMUM OF 5% ORGANIC CONTENT CONSISTENT WITH RPBCWD REQUIREMENTS. 3.BUFFER AREAS DISTURBED MUST BE PLANTED WITH NATIVE VEGETATION AND MAINTAINED TO RETAIN NATURAL RESOURCES AND ECOLOGICAL VALUE. 4.NO FILL, DEBRIS, OR OTHER MATERIAL SHALL BE PLACED IN A BUFFER. 5.THE POTENTIAL TRANSFER OF AQUATIC INVASIVE SPECIES (E.G., ZEBRA MUSSELS, EURASIAN WATERMILFOIL, ETC.) MUST BE MINIMIZED TO THE MAXIMUM EXTENT POSSIBLE. On e S t o r y B r i c k B u i l d i n g Fo u n d a t i o n A r e a = 5 , 4 9 0 S q . F t . + / - Bitu m i n o u s T r a i l Ac c e s s Ac c e s s 66 . 1 6 S5 5 ° 2 4 ' 4 2 " E N34 ° 2 5 ' 1 1 " E 1 1 6 . 4 2 S5 5 ° 3 4 ' 4 9 " E 1 6 5 . 0 0 0.9 5 Δ= 0 ° 0 0 ' 5 1 " R= 3 8 5 9 . 7 2 S34 ° 3 5 ' 1 8 " W 1 7 7 . 0 0 N 5 5 ° 2 4 ' 4 2 " W 1 9 1 . 1 8 39. 8 4 Δ= 1 0 ° 0 8 ' 4 3 " R= 2 2 5 . 0 0 N34 ° 3 5 ' 1 8 " E 6 4 . 5 6 [17 ] T r a i l E a s e m e n t per D o c . N o . 9 4 3 7 7 5 5 [1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N [10 ] [ 1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N PI D : 1 4 1 1 6 2 2 3 1 0 0 3 6 Ad d r e s s : 8 2 8 0 F l y i n g C l o u d D r O w n e r : N n n R e i t L p PI D : 1 4 1 1 6 2 2 3 1 0 0 3 7 Ad d r e s s : 8 2 7 0 F l y i n g C l o u d D r O w n e r : C a r l s o n P r o p e r t i e s 8 7 2 0 L l c PID : 1 4 1 1 6 2 2 3 1 0 0 1 1 Add r e s s : 1 2 2 0 0 M i d d l e s e t R d Ow n e r : L a r i a t C o m p a n i e s I n c M I D D L E S E T R O A D FLY I N G C L O U D D R I V E ( C . S . A . H . N O . 6 1 ) (A P u b l i c R / W ) (A P u b l i c R / W ) (W i d t h V a r i e s ) [9] R e s t r i c t e d A c c e s s per D o c . N o . 4 3 4 7 0 4 2 [14 ] H i g h w a y a n d Util i t y E a s e m e n t p e r Doc . N o . 8 3 3 6 3 0 5 [A ] C o n c r e t e W a l k 15 " R C P 18" R C P 12" R C P 15 " R C P 8" P V C 8" P V C 8" P V C ( R e c ) 6" D I P Con c r e t e W a l k [12 ] . S h a r e d A c c e s s E a s e m e n t [B ] R o c k La n d s c a p i n g Fo u n d Ma g Na i l Fo u n d 1 / 2 I n c h I r o n Pi p e w / C a p N o . 4 4 5 3 0 Foun d 1 / 2 I n c h Ope n I r o n P i p e Fo u n d 1 / 2 I n c h Iro n P i p e w / Ca p N o . 1 0 8 4 7 Ex i s t i n g B u i l d i n g Ro c k La n d s c a p i n g [11 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N Tru n c a t e d Dom e Fou n d M a g N a i l Tru n c a t e d Dom e s [D ] 6 " P V C [C] C o n c r e t e P a d [12] . S h a r e d Acce s s E a s e m e n t REF. 112 116 113 114a 115 105 106 107 100 b 114 b 108 109 100a IT / D A T A 106 MECH . / C U S T . 105 WOM E N ' S R E S T . 113 MEN ' S R E S T . 112 QUIE T R O O M 116 BRE A K R O O M 114 N/D115 OFFIC E 107 OFFI C E 108 OFFI C E 109 VEST I B U L E 100 TELL E R W O R K A R E A 104 TELL E R A R E A 103 COR R I D O R 111 REFR E S H M E N T A R E A 110 MEM B E R L O B B Y A R E A 101 WAIT I N G A R E A 102 S3C S11 S3CS11 S3CS11 S8AS11 S3C S11 S3CS11 S3B S11 S3B S11 S3AS11 S2AS01 S8AS11 S3AS21 S6AS11 S6AS11 S6CS11 S3A01 S3AS11 S3E01 S3B01 S3E01 S3A S11 S3AS01 S3C S11 8.6 9 ° 8.6 8 ° S3E01 S3AS01 NOPA R K I N G CONSTRUCTION LIMITS MH 1 RIM=861.93 IE(E)=858.32 IE(N/W)=854.37 EX. CB RIM=857.60 EX 12" IE=854.08 [FIELD VERIFY] PR 12" IE=854.08 CORE DRILL NEW CONNECTION TO EXISTING CB 57 LF 12" SCH40 PVC STORM @ 0.50% CONTECH JELLYFISH FILTER 4X6 PEAK DIVERSION (WITH 40" CARTRIDGE DEPTH AND HATCH COVER) (WATERBODY ID:14-31-I) RIM=856.00 IE N (15")=853.12 IE S (15")=853.12 BOT=847.87 CONTECH FILTER TO PROVIDE ALLOWABLE DISCHARGE RATE = 0.73 CFS PROP. 1.1" DISCHARGE RATE = 0.33 CFS CASTING TO BE HS20 RATED CONTECH 6' X 12' VAULT STORMFILTER (WITH 27" CARTRIDGE DEPTH AND PHOSPHOSORB MEDIA) (WATERBODY ID:14-31-H) RIM (W)=862.10 RIM (E)=862.42 IE E (4")=855.97 IE S (4")=854.47 WEIR WALL=858.60 BOT=854.47 CONTECH FILTER TO PROVIDE ALLOWABLE DISCHARGE RATE = 0.26 CFS PROP. 1.1" DISCHARGE RATE = 0.25 CFS CASTING TO BE HS20 RATED. 4" OUTLET IE=856.05 5 LF 4" SCH40 PVC STORM @ 2.00% 4 LF 4" SCH40 PVC STORM @ 2.00% 14 LF 12" HDPE STORM @ 2.00% 12" OUTLET IE=858.60 CBMH 11 RIM=860.31 IE=856.77 SUMP=852.77 INSTALL MOMENTUM PRESERVER 12" INLET IE=856.58 38 LF 15" SCH40 PVC STORM @ 0.50% ADJUST WATER MAIN AS NECESSARY TO PROVIDE 18" SEPARATION FROM STORM CROSSING CBMH 21 RIM=864.49 IE=859.01 SUMP=855.01 INSTALL MOMENTUM PRESERVER 12" INLET IE=858.55 UNDERGROUND STORMWATER INFILTRATION SYSTEM 1 (WATERBODY ID:14-31-G) 192 LF (3 ROWS @ 64 LF) OF 48" PERFORATED CMP 12" SIDE & END STONE 6" STONE COVER 24" STONE SEPARATION 7.2" STONE BASE TILL OR RIP SOIL 3' BELOW BOTTOM OF STONE BASE STONE IE=855.45 CHAMBER IE=856.05 CHAMBER TOP=860.05 STONE TOP=860.55 OUTLET ELEVATIONS (SEE DRAWING, OUTLET CONTROL STRUCTURE & DETAILS) WQL (MPCA)=856.36 100-YR HWL=860.31 (SEE DETAIL AND SHOP DWGS) 23 LF 12" HDPE STORM @ 2.00% MAKE CONNECTION TO EXISTING SANITARY SEWER, CUT IN WYE. EX 8" IE=854.38± (FIELD VERIFY PRIOR TO CONST) PR IE=854.55 COORDINATE WITH CITY STUB SANITARY SEWER TO 5' FROM BUILDING IE @ STUB=855.31 COORD. W/MECH'L 38 LF 6" PVC SDR 26 SANITARY SERVICE @ 2.00% 6" COMBINED DIP WATER SERVICE AND VALVE, STUB TO WITHIN 5' FROM BUILDING, COORD. WITH MECH'L. PROPOSED GATE VALVE AND VALVE BOX FIRE DEPARTMENT CONNECTION, COORD. W/MECH'L MAKE WET TAP CONNECTION TO EXISTING 6" WATER MAIN, COORD. WITH CITY CONTRACTOR SHALL SAWCUT & REMOVE PUBLIC PVMTS., CURBS, AND WALKS FOR INSTALLATION OF UTILITIES. UPON COMPLETION OF UTILITY WORK, REPLACE ALL MATERIAL, IN KIND, AND TO CITY STANDARD AND APPROVAL CONTRACTOR SHALL COORDINATE ALL THE UTILITY SERVICES WITH BOTH THE CIVIL AND MECHANICAL PLANS PRIOR TO CONSTRUCTION. SEE DEMO PLAN FOR ALL EXISTING UTILITY REMOVAL INFORMATION 8" STORM SERVICE, STUB TO WITHIN 5' FROM BUILDING, COORD. W/MECH'L BLDG IE=859.71 STUB IE=859.61 30 LF 8" SCH40 PVC STORM @ 2.00% INSTALL 25 LF 4" DT BELOW CLASS V LAYER, TYP. ACCESS RISER, TYP. CB 12 RIM=861.94 IE=858.44 43 LF 12" SCH40 PVC STORM @ 3.88% EOF= 864.75 EOF= 862.26 20' DRAINAGE & UTILITY EASEMENT COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 48776 David J. Knaeble LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R GENERAL UTILITY NOTES: UTILITY PLAN LEGEND: CITY OF EDEN PRAIRIE UTILITY NOTES: 1.RESERVED FOR CITY SPECIFIC UTILITY NOTES. CATCH BASIN GATE VALVE AND VALVE BOX SANITARY SEWER STORM SEWER WATER MAIN PROPOSED FIRE HYDRANT MANHOLE CONSTRUCTION LIMITS DRAINTILE REVISION SUMMARY DATE DESCRIPTION C400 UTILITY PLAN 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.SEE SITE PLAN FOR HORIZONTAL DIMENSIONS AND LAYOUT. 3.CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF DISCREPANCIES OR VARIATIONS FROM THE PLANS. 4.CASTINGS SHALL BE SALVAGED FROM STRUCTURE REMOVALS AND RE-USED OR PLACED AT THE DIRECTION OF THE OWNER. 5.PIPE LENGTHS SHOWN ARE FROM CENTER TO CENTER OF STRUCTURE OR TO END OF FLARED END SECTION. 6.UTILITIES CONNECTIONS ON THE PLAN ARE SHOWN TO WITHIN 5' OF THE BUILDING FOOTPRINT. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR THE FINAL CONNECTION TO BUILDING LINES. COORDINATE WITH ARCHITECTURAL AND MECHANICAL PLANS. 7.CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS IN GUTTERS SHALL BE SUMPED 0.15 FEET PER DETAILS. RIM ELEVATIONS SHOWN ON THIS PLAN DO NOT REFLECT SUMPED ELEVATIONS. 8.ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB UNLESS OTHERWISE NOTED. 9.HYDRANT TYPE, VALVE, AND CONNECTION SHALL BE IN ACCORDANCE WITH CITY REQUIREMENTS. HYDRANT EXTENSIONS ARE INCIDENTAL. 10.A MINIMUM OF 8 FEET OF COVER IS REQUIRED OVER ALL WATERMAIN, UNLESS OTHERWISE NOTED. EXTRA DEPTH MAY BE REQUIRED TO MAINTAIN A MINIMUM OF 18" VERTICAL SEPARATION TO SANITARY OR STORM SEWER LINES. EXTRA DEPTH WATERMAIN IS INCIDENTAL. 11.A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIRED FOR ALL UTILITIES, UNLESS OTHERWISE NOTED. 12.ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND COORDINATED WITH THE CITY PRIOR TO CONSTRUCTION. 13.CONNECTIONS TO EXISTING STRUCTURES SHALL BE CORE-DRILLED. 14.COORDINATE LOCATIONS AND SIZES OF SERVICE CONNECTIONS WITH THE MECHANICAL DRAWINGS. 15.COORDINATE INSTALLATION AND SCHEDULING OF THE INSTALLATION OF UTILITIES WITH ADJACENT CONTRACTORS AND CITY STAFF. 16.ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. ALL PAVEMENT CONNECTIONS SHALL BE SAWCUT. ALL TRAFFIC CONTROLS SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS SHALL INCLUDE BUT NOT BE LIMITED TO SIGNAGE, BARRICADES, FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY. 17.ALL STRUCTURES, PUBLIC AND PRIVATE, SHALL BE ADJUSTED TO PROPOSED GRADES WHERE REQUIRED. THE REQUIREMENTS OF ALL OWNERS MUST BE COMPLIED WITH. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING. 18.CONTRACTOR SHALL COORDINATE ALL WORK WITH PRIVATE UTILITY COMPANIES. 19.CONTRACTOR SHALL COORDINATE CONNECTION OF IRRIGATION SERVICE TO UTILITIES. COORDINATE THE INSTALLATION OF IRRIGATION SLEEVES NECESSARY AS TO NOT IMPACT INSTALLATION OF UTILITIES. 20.CONTRACTOR SHALL MAINTAIN AS-BUILT PLANS THROUGHOUT CONSTRUCTION AND SUBMIT THESE PLANS TO ENGINEER UPON COMPLETION OF WORK. 21.FOR ALL SITES LOCATED IN CLAY SOIL AREAS, DRAIN TILE MUST BE INSTALLED AT ALL LOW POINT CATCH BASINS 25' IN EACH DIRECTION. SEE PLAN AND DETAIL. INSTALL LOW POINT DRAIN TILE PER PLANS AND GEOTECHNICAL REPORT RECOMMENDATIONS AND REQUIREMENTS. 22.AN OSHA-APPROVED QUALIFIED PERSON SHOULD REVIEW THE SOIL CLASSIFICATION PRESENTED IN THE GEOTECHNICAL REPORT IN THE FIELD. EXCAVATIONS MUST COMPLY WITH CURRENT OSHA REQUIREMENTS IN THE CODE OF FEDERAL REGULATIONS PERTAINING TO EXCAVATIONS AND TRENCHES. EXCAVATION SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR. Bitu m i n o u s T r a i l 66 . 1 6 S5 5 ° 2 4 ' 4 2 " E N34 ° 2 5 ' 1 1 " E 1 1 6 . 4 2 S5 5 ° 3 4 ' 4 9 " E 1 6 5 . 0 0 0.9 5 Δ= 0 ° 0 0 ' 5 1 " R= 3 8 5 9 . 7 2 S34 ° 3 5 ' 1 8 " W 1 7 7 . 0 0 N 5 5 ° 2 4 ' 4 2 " W 1 9 1 . 1 8 39. 8 4 Δ= 1 0 ° 0 8 ' 4 3 " R= 2 2 5 . 0 0 N34 ° 3 5 ' 1 8 " E 6 4 . 5 6 [17 ] T r a i l E a s e m e n t per D o c . N o . 9 4 3 7 7 5 5 [1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N [10 ] [ 1 1 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N PI D : 1 4 1 1 6 2 2 3 1 0 0 3 7 Ad d r e s s : 8 2 7 0 F l y i n g C l o u d D r O w n e r : C a r l s o n P r o p e r t i e s 8 7 2 0 L l c PID : 1 4 1 1 6 2 2 3 1 0 0 1 1 Add r e s s : 1 2 2 0 0 M i d d l e s e t R d Ow n e r : L a r i a t C o m p a n i e s I n c [9] R e s t r i c t e d A c c e s s per D o c . N o . 4 3 4 7 0 4 2 [14 ] H i g h w a y a n d Util i t y E a s e m e n t p e r Doc . N o . 8 3 3 6 3 0 5 [A ] C o n c r e t e W a l k 15 " R C P 18" R C P 12" R C P 15 " R C P 8" P V C 8" P V C 8" P V C ( R e c ) 6" D I P Con c r e t e W a l k [12 ] . S h a r e d A c c e s s E a s e m e n t [B ] R o c k La n d s c a p i n g Fo u n d Ma g Na i l Fo u n d 1 / 2 I n c h I r o n Pi p e w / C a p N o . 4 4 5 3 0 Foun d 1 / 2 I n c h Ope n I r o n P i p e Fo u n d 1 / 2 I n c h Iro n P i p e w / Ca p N o . 1 0 8 4 7 Ro c k La n d s c a p i n g [11 ] [ 1 3 ] U t i l i t y a n d D r a i n a g e E a s e m e n t p e r TH E P R E S E R V E C O M M E R C I A L P A R K N O R T H 3 R D A D D I T I O N a n d THE P R E S E R V E C O M M E R C I A L P A R K N O R T H 4 T H A D D I T I O N Tru n c a t e d Dom e Fou n d M a g N a i l Tru n c a t e d Dom e s [D ] 6 " P V C [C] C o n c r e t e P a d [12] . S h a r e d Acce s s E a s e m e n t REF. 112 116 113 114a 115 105 106 107 100 b 114 b 108 109 100a IT / D A T A 106 MECH . / C U S T . 105 WOM E N ' S R E S T . 113 MEN ' S R E S T . 112 QUIE T R O O M 116 BRE A K R O O M 114 N/D115 OFFIC E 107 OFFI C E 108 OFFI C E 109 VEST I B U L E 100 TELL E R W O R K A R E A 104 TELL E R A R E A 103 COR R I D O R 111 REFR E S H M E N T A R E A 110 MEM B E R L O B B Y A R E A 101 WAIT I N G A R E A 102 S3C S11 S3CS11 S3CS11 S8AS11 S3C S11 S3CS11 S3B S11 S3B S11 S3AS11 S2AS01 S8AS11 S3AS21 S6AS11 S6AS11 S6CS11 S3A01 S3AS11 S3E01 S3B01 S3E01 S3A S11 S3AS01 S3C S11 8.6 9 ° 8.6 8 ° S3E01 S3AS01 NOPA R K I N G CONSTRUCTION LIMITS 5 - PC 3 - HS 3 - HT 5 - CM 7 - SB 4 - SB 7 - SB 4 - JN 1 - GC2 1 - PC2 1 - AL 3 - AL2 4 - AL2 5 - HT 6 - EM 7 - DS 7 - AM 6 - EM 7 - DS 6 - JN 3 - DS 2 - EM LANDSCAPE EDGER, TYP. WEATHERED BOULDERS, TYP. PLANTING BED W/ ROCK MULCH SOD, TYP. 4 - DS 2 - LF 7 - AM 6 - HS 7 - HT 7 - AM 4 - SB 5 - DS 5 - SB 6 - HS 5 - AM 11 - AL2 5 - JN 7 - PC 5 - HS 2 - JN 3 - CM 8 - PC SYMBOL COMMON / BOTANICAL NAME QTY SIZE GROUND COVERS 1.5" SCREENED ROCK/STONE, 3" DEEP / ROCK MULCH 1.5" SCREENED DECORATIVE ROCK/STONE MULCH 3" DEEP OVER GEOTEXTILE FABRIC, PROVIDE SAMPLES. INSTALL W/EDGING AS SHOWN ON LANDSCAPE PLAN. 2,738 sf Mulch BLUE GRASS SOD / SOD BLUE GRASS SOD W/IMPROVED VARIATIES, INSTALLED ON PREPARED SOIL, CONTAINING 6" OF TOPSOIL W/MINIMUM 4% ORGANICS BY WEIGHT. SCARIFIED AND EVENLY GRADED. BIG ROLL PREFERRED FOR LARGER AREAS. 4,063 sf Sod SUBTOTAL:6,801 sf PLANT SCHEDULE - GROUND COVER L100 LANDSCAPE PLAN COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. 25821 Robert L. Binder 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R LANDSCAPE NOTES: PROPOSED PERENNIAL PLANT SYMBOLS - SEE PLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES PROPOSED DECIDUOUS AND EVERGREEN SHRUB SYMBOLS - SEE PLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES PROPOSED ORNAMENTAL TREE SYMBOLS - SEE PLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES PROPOSED EVERGREEN TREE SYMBOLS - SEE PLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES PROPOSED CANOPY TREE SYMBOLS - SEE PLANT SCHEDULE AND PLAN FOR SPECIES AND PLANTING SIZES DECORATIVE BOULDERS (ROUNDED & BLOCK STYLE), 18"-30" DIA. LANDSCAPE PLAN LEGEND: EDGING - SHALL BE COMMERCIAL GRADE, 4" DEPTH ALUMINUM, BLACK OR DARK GREEN IN COLOR, INCLUDE ALL CONNECTORS, STAKES, & ALL APPURTENANCES PER MANUF. INSTALL PER MANUF. INSTRUC./SPECS. SEE SHEET L1.1 FOR PLANTING SCHEDULE CONSTRUCTION LIMITS REVISION SUMMARY DATE DESCRIPTION 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R MULCH SCHEDULE AREA MULCH TYPE EDGING FABRIC REMARKS TREE RINGS 4" DEPTH, SHREDDED CEDAR YES NO SEE DETAIL SHT. L1.1 PLANTING BEDS 3" DEPTH, 1.5 INCH SCREENED ROCK.YES YED MAINT. STRIP AT BUILDING FOUNDATION NA NA NA NOTE: COORDINATE ALL MULCH AND PLANTING BED MATERIAL PRIOR TO INSTALLATION, PROVIDE SAMPLES AND SHOP DRAWINGS/PHOTOS/DATA SHEETS OF ALL MATERIALS 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.REFERENCE MULCH SCHEDULE FOR MULCH MATERIALS AND LOCATIONS. 3.ALL TREES SHALL BE MULCHED WITH SHREDDED CEDAR MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ALL MULCH SHALL BE KEPT WITHIN A MINIMUM OF 2" FROM TREE TRUNK. 4.IF SHOWN ON PLAN, RANDOM SIZED LIMESTONE BOULDERS COLOR AND SIZE TO COMPLIMENT NEW LANDSCAPING. OWNER TO APPROVE BOULDER SAMPLES PRIOR TO INSTALLATION. 5.PLANT MATERIALS SHALL CONFORM WITH THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS AND SHALL BE OF HARDY STOCK, FREE FROM DISEASE, DAMAGE AND DISFIGURATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PLUMPNESS OF PLANT MATERIAL FOR DURATION OF ACCEPTANCE PERIOD. 6.UPON DISCOVERY OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE SCHEDULE AND THE QUANTITY SHOWN ON THE PLAN, THE PLAN SHALL GOVERN. 7.CONDITION OF VEGETATION SHALL BE MONITORED BY THE LANDSCAPE ARCHITECT THROUGHOUT THE DURATION OF THE CONTRACT. LANDSCAPE MATERIALS PART OF THE CONTRACT SHALL BE WARRANTED FOR TWO (2) FULL GROWING SEASONS FROM SUBSTANTIAL COMPLETION DATE. 8.ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL RECEIVE 6" LAYER TOPSOIL AND SOD AS SPECIFIED UNLESS OTHERWISE NOTED ON THE DRAWINGS. 9.COORDINATE LOCATION OF VEGETATION WITH UNDERGROUND AND OVERHEAD UTILITIES, LIGHTING FIXTURES, DOORS AND WINDOWS. CONTRACTOR SHALL STAKE IN THE FIELD FINAL LOCATION OF TREES AND SHRUBS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 10.ALL PLANT MATERIALS SHALL BE WATERED AND MAINTAINED UNTIL ACCEPTANCE. 11.REPAIR AT NO COST TO OWNER ALL DAMAGE RESULTING FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. 12.SWEEP AND MAINTAIN ALL PAVED SURFACES FREE OF DEBRIS GENERATED FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. 13.PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLY PROGRAMMABLE AND CAPABLE OF ALTERNATE DATE WATERING. THE SYSTEM SHALL PROVIDE HEAD TO HEAD OR DRIP COVERAGE AND BE CAPABLE OF DELIVERING ONE INCH OF PRECIPITATION PER WEEK. SYSTEM SHALL EXTEND INTO THE PUBLIC RIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB. 14.CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INCLUDING PRICING FROM OWNER, PRIOR TO INSTALLATION. LANDSCAPE REQUIREMENTS: CODE COMMON / BOTANICAL NAME QTY CONT NATIVE PLANTS POLLINATOR FRIENDLY DECIDUOUS TREES GC2 True North™ Kentucky Coffeetree / Gymnocladus dioica 'UMNSynergy'1 3" CAL. B&B NATIVE CULTIVAR N SUBTOTAL:1 EVERGREEN TREES PC2 Chalet Swiss Stone Pine / Pinus cembra 'Chalet'1 6` B&B NOT NATIVE N SUBTOTAL:1 ORNAMENTAL TREES AL Spring Flurry Serviceberry / Amelanchier x laevis 'JFS-Arb'1 1.5" CAL. B&B NATIVE CULTIVAR Y SUBTOTAL:1 CODE COMMON / BOTANICAL NAME QTY SIZE NATIVE PLANTS POLLINATOR FRIENDLY SHRUBS AL2 Low Scape Mound® Black Chokeberry / Aronia melanocarpa 'UCONNAM165'18 #5 CONT NATIVE CULTIVAR Y AM Low Scape Hedger Black Chokeberry / Aronia melanocarpa 'UCONNAM166' TM 26 #5 CONT NATIVE CULTIVAR Y CM Muskingham Gray Dogwood / Cornus racemosa `Muskingham`8 #5 CONT NATIVE CULTIVAR Y HS Firefly Nightglow Bush Honeysuckle / Diervilla x splendens `El Madrigal`20 #5 CONT NATIVE CULTIVAR Y HT Fire Light Tidbit® Panicle Hydrangea / Hydrangea paniculata `SMNHPK`15 #5 CONT NOT NATIVE Y JN Grey Guardian Juniper / Juniperus virginiana `Greguard` TM 17 #5 CONT NATIVE N SUBTOTAL:104 GRASSES DS Schottland Hair Grass / Deschampsia cespitosa `Schottland`26 #1 CONT NATIVE Y PC Switch Grass / Panicum virgatum `Cape Breeze`20 #1 CONT NATIVE CULTIVAR Y SB Blue Heaven Little Bluestem / Schizachyrium scoparium `Blue Heaven`27 #1 CONT NATIVE CULTIVAR Y SUBTOTAL:73 PERENNIALS EM Magnus Purple Coneflower / Echinacea purpurea `Magnus`14 #1 CONT NATIVE CULTIVAR Y LF Floristan White Blazing Star / Liatris spicata 'Floristan White'2 #1 CONT NATIVE CULTIVAR Y SUBTOTAL:16 PLANT SCHEDULE L110 LANDSCAPE PLAN NOTES & DETAILS COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T 2025 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 04/11/25 CITY SUBMITTAL 05/09/25 CITY RESUBMITTAL 06/10/25 CITY RESUBMITTAL PROJECT MANAGER DAVE KNAEBLE CONTACT NUMBER 612-615-0060 X XXX DRAWN BY DK,WMB REVIEWED BY DK PROJECT NUMBER 25033 VE R I D I A N C R E D I T UN I O N 82 8 0 F L Y I N G C L O U D D R I V E , ED E N P R A I R I E M N , 5 5 3 4 4 VE R I D I A N C R E D I T U N I O N 58 0 5 R O C K W E L L D R I V E N E , C E D A R R A P I D S , I A 5 2 4 0 2 LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. 25821 Robert L. Binder 06/10/25 Civil Engineering ° Surveying ° Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 OW N E R 1.ENTIRE SITE SHALL BE FULLY IRRIGATED. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 2.PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLY PROGRAMMABLE AND CAPABLE OF ALTERNATE DATE WATERING. THE SYSTEM SHALL PROVIDE HEAD TO HEAD OR DRIP COVERAGE AND BE CAPABLE OF DELIVERING ONE INCH OF PRECIPITATION PER WEEK. SYSTEM SHALL EXTEND INTO THE PUBLIC RIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB. 3.CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INLCUDING PRICING FROM OWNER, PRIOR TO INSTALLATION. 4.SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR IRRIGATION WATER, METER, AND POWER CONNECTIONS. 5.CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND/ABOVE GROUND FACILITIES PRIOR TO ANY EXCAVATION/INSTALLATION. ANY DAMAGE TO UNDERGROUND/ABOVE GROUND FACILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COSTS ASSOCIATED WITH CORRECTING DAMAGES SHALL BE BORNE ENTIRELY BY THE CONTRACTOR. 6.SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTILITY COMPANY STANDARDS AND SHALL BE PER NATIONAL AND LOCAL CODES. EXACT LOCATION OF SERVICE EQUIPMENT SHALL BE COORDINATED WITH THE LANDSCAPE ARCHITECT OR EQUIVALENT AT THE JOB SITE. 7.CONTRACTOR SHALL COORDINATE WITH LOCAL UTILITY COMPANY FOR THE PROPOSED ELECTRICAL SERVICE AND METERING FACILITIES. 8.IRRIGATION WATER LINE CONNECTION SIZE IS 1-12" AT BUILDING. VERIFY WITH MECHANICAL PLANS. 9.ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE. 10.ALL LATERAL LINES SHALL BE 12" BELLOW FINISHED GRADE. 11.ALL EXPOSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR. 12.CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2'-0" BELOW THE FINISHED GRADE OF THE TOP OF PAVEMENT. EXTEND SLEEVES TO 2'-0" BEYOND PAVEMENT. 13.CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT WITH THE SLEEVING MATERIAL "ELLED" TO 2'-0" ABOVE FINISHED GRADE AND CAPPED. 14.FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND SQUARE CUT JOINTS. USE QUALITY GRADE PRIMER AND SOLVENT CEMENT FORMULATED FOR INTENDED TYPE OF CONNECTION. 15.BACKFILL ALL TRENCHES WITH SOIL FREE OF SHARP OBJECTS AND DEBRIS. 16.ALL VALVE BOXES AND COVERS SHALL BE BLACK IN COLOR. 17.GROUP VALVE BOXES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. LOCATE IN PLANT BED AREAS WHENEVER POSSIBLE. 18.IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON-SITE WITH OWNER'S REPRESENTATIVE. 19.CONTROL WIRES: 14 GAUGE DIRECT BURIAL, SOLID COPPER IRRIGATION WIRE. RUN UNDER MAIN LINE. USE MOISTURE-PROOF SPLICES AND SPLICE ONLY AT VALVES OR PULL BOXES. RUN SEPARATE HOT AND COMMON WIRE TO EACH VALVE AND ONE (1) SPARE WIRE AND GROUND TO FURTHEST VALVE FROM CONTROLLER. LABEL OR COLOR CODE ALL WIRES. 20.AVOID OVER SPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY INDIVIDUALLY ADJUSTING RADIUS OR ARC ON SPRINKLER HEADS AND FLOW CONTROL ON AUTOMATIC VALVE. 21.ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE. 22.USE SCREENS ON ALL HEADS. 23.A SET OF AS-BUILT DRAWINGS SHALL BE MAINTAINED ON-SITE AT ALL TIMES IN AN UPDATED CONDITION. 24.ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN. 25.ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL UNDERNEATH VALVE AND VALVE BOX. GRAVEL SHALL EXTENT 3" BEYOND PERIMETER OF VALVE BOX. 26.THERE SHALL BE 3" MINIMUM SPACE BETWEEN BOTTOM OF VALVE BOX COVER AND TOP OF VALVE STRUCTURE. IRRIGATION NOTES: REVISION SUMMARY DATE DESCRIPTION SEE SHEET L1.0 FOR GENERAL LANDSCAPE NOTES & LEGEND Know what's below. before you dig.Call R DRAWN @ ? size PERENNIAL BED PLANTING N T S PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVE SURROUNDING GRADE ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TO ENSURE PROPER BACKFILL-TO-ROOT CONTACT SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED EXISTING GRADE ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT STEM BACKFILL AS PER SPECIFICATION DO NOT EXCAVATE BELOW ROOTBALL. SIZE VARIES SEE LANDSCAPE PLAN MODIFY EXCAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 1 DECIDUOUS & CONIFEROUS SHRUB PLANTING N T S PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE (RETAIN NORMAL SHAPE FOR SPECIES) PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVE SURROUNDING GRADE ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TO ENSURE PROPER BACKFILL-TO-ROOT CONTACT SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED EXISTING GRADE ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK BACKFILL AS PER SPECIFICATION DO NOT EXCAVATE BELOW ROOTBALL. THREE TIMES WIDTH OF ROOTBALL RULE OF THUMB - MODIFY EXCAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 2 THREE TIMES WIDTH OF ROOTBALL DECIDUOUS & CONIFEROUS TREE PLANTING N T S PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE (RETAIN NORMAL TREE SHAPE) THREE 2"X4"X8' WOODEN STAKES, STAINED BROWN WITH TWO STRANDS OF WIRE TWISTED TOGETHER. STAKES SHALL BE PLACED AT 120° TO ONE ANOTHER. WIRE SHALL BE THREADED THROUGH NYLON STRAPPING WITH GROMMETS. ALTERNATE STABILIZING METHODS MAY BE PROPOSED BY CONTRACTOR. TRUNK FLARE JUNCTION: PLANT TREE 1"-2" ABOVE EXISTING GRADE MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK EXISTING GRADE CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. IF NON-BIODEGRADABLE, REMOVE COMPLETELY SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED BACKFILL AS SPECIFIED COMPACT BOTTOM OF PIT, TYP. RULE OF THUMB - MODIFY EXCAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 3 Project Narrative The Redmond Company and Civil Site Group are working together to secure the design and approvals for both the site and building design. The Redmond Company will also be constructing the building and will maintain a safe, clean site throughout construction. Project phasing will be determined on final approval of the building plans; however, Veridian is ready to begin construction in fall of 2025. The proposed project will be located at the northwest corner of Middleset Road and Flying Cloud Drive, which is currently a Mister Car Wash, which is to be removed from the site prior to construction of the new credit union building. A Phase I Assessment was conducted in early spring of 2025 and indicated that there is no evidence of RECs in connection with any previous use of the site. Located within the same block is a Midas Auto Repair Shop, Walgreens and a Pediatric Medical Office Building. Adjacent to the site is Cold Stone Creamery, McDonalds and various other restaurants. Veridian plans on cash financing to secure the ownership of the site. Preventative maintenance agreements will be set up for Landscaping, Trash Removal, Snow Removal, General Repairs, and Maintenance Services. No formal contracts or agreements have been finalized due to it being the initial start of the project. The proposed operation will be a freestanding, 2,890 square foot, single-tenant Veridian Credit Union building will be built within the Regional Service Commercial (C-REG-SER) zoning district and will be requesting as PUD status for this project. Primary site access and exit will occur on the west side of the site via the access roadway to the shopping center to the north which exits to Middleset Road. The credit union is planning on vacating the existing south driveway onto the site in the view that it is a safety concern for those entering and exiting the site given the distance to the intersection. The overall site plan will consist of twenty-one (21) on-site parking spaces for credit union member and employee use. No street parking will be available. Trash pickup will likely happen a maximum of once a week; which will occur on the northwest side of the site. Working to serve the community, Veridian Credit Union is moving into the Minneapolis market. Operationally, they will offer all consumer financial offerings, such as mortgage, commercial, trust, and specialty account needs with video services available for each service provided. These services will be controlled on-site and locally managed by individuals that know and care about their members’ needs. Veridian will operate a standalone 24-Hour ATM, traditional drive-up and self-service coin machine. These financial services are specially tailored to meet the needs of local consumers. At this location, there will be up to eight (8) employees. Typical hours of operation will be from 8:30am to 5:30pm, from Monday through Friday; and from 8:30am to 12:00pm on Saturdays. The credit union will be closed on Sundays. There are two monument signs proposed for this project. The first is proposed to be in the southeast corner of the site; the second by the main entry of the site. Small scale directional signage will be placed throughout the site to help members and employees safely navigate the site. The modern exterior design of the building (as referred to the building elevations within this submittal) includes a butterfly roof that relates itself the Veridian “V-Mark.” Carbon colored aluminum siding frames a natural stone blend that is used across all elevations of the building. Clerestory windows are used to break up the elevations and provide ample amounts of natural light to the interior of the building. Green Alpolic metal panels frame both the entry and the drive-up canopy to further brand the building to Veridian. Back-lit signage is located on the east and south elevations fo the building as they face prominent roadways adjacent to the site. The north side features the green Alpolic metal panels that hide the pneumatic tube system that leads to the Teller Work Area within the building. Lighting is important this project as it highlights the building entry, the drive-up canopy as well as highlight the materiality of the building elevations. On the façade of the building cylindrical light fixtures will be used on stone areas and can downlights will be used under the drive-up canopy. Green LED tape lights are placed at the top of the stone band which provides additional branding and visual interest to the building at night. (Refer to the building renderings as submitted with this submittal.) There is ample landscaping throughout the site that has been designed by a professional landscape architect that meets and exceeds all the requirements of the City of Eden Prairie’s Landscape and Tree Preservation ordinance. Snow storage will be handled by plowing snow to the onsite landscaping areas in the north and south sides of the development. If the site runs out of snow storage options, snow will be removed from the site by the properties snow plowing contractor. Salt management has been contemplated in the site design for this project. The proposed building has been located northerly on the site so that a majority of the parking areas are south facing and will have minimal shading in the winter. This will promote natural melting and reduce the amount of salt needed to maintain this parking lot. The building owner will also work with their snow plowing contractor to minimize salt use on the site, but still provide effective snow and ice management. This project is disturbing 0.7acres of land within the project site. Since this area is over 5,000 square feet of land and triggers the stormwater requirements of Riley Purgatory Bluff Creek Watershed District. The stormwater management requirements of Riley Purgatory Bluff Creek Watershed District are the most stringent and will be used as a basis for the design requirements for this project. The project does not trigger stormwater requirements for the City of Eden Prairie or the MPCA NPDES Permit. This project will utilize an underground infiltration/detention system and two proprietary filter devices to meet the requirements of the RPBCWD. The underground infiltration system will provide abstraction to the maximum extent practicable and the two proprietary filter devices will be designed to provide water quality treatment for the newly created and existing impervious surfaces and to provide rate control to match the existing discharge rates from the site. (see stormwater report) As it pertains to sustainable features, the building will utilize energy star rated appliances and WaterSense certified fixtures in its design. We will provide recycling services per Hennepin County. The landscape plantings will be a combination of native and native cultivars to try and use minimal irrigation after establishment period. All other sustainable items listed on the Development Review checklist will not be attempted. # D a t e C o m m e n t s Revisions Da t e : 6 / 5 / 2 0 2 5 24x36 Sc a l e : 1 " = 2 0 ' These drawings are for conceptual use only and are not intended for construction. Fixture runs and quantities should be verified prior to order. Values represented are an approximation generated from manufacturers photometric inhouse or independent lab tests with data supplied by lamp manufacturers. Ve r i d i a n C r e d i t U n i o n Si t e L i g h t i n g Dr a w n B y : J o e F r e y Sa l e s A g e n t : S t e v e H a h n LS952-4280-2 Scale: 1 inch= 20 Ft. N O P A R KIN G 18L-FT-IL MH = 25ft MH = 25ft 18L-FT-IL MH = 25ft 18L-2-IL MH =10.5 Ctr WM WM MH =10.5 Ctr WM MH =10.5 Ctr MH = 9ft Ctr WM_9 R-B MH = 14.5ftR-B MH = 14.5ft R-A MH = 8.25ft MH = 7ft 11W-45° 18L-FT-IL MH = 25ft MH = 11ft C MH = 11ft C MH = 11ft C MH = 11ft C 12L-FTI-IL 11.1 2 .9 3.0 2.9 2.2 1.3 0.7 0.1 0.5 4.7 3. 7 2.1 2.6 0.6 4.0 2.4 3.7 1.7 0.9 0.1 13.9 18.3 0.5 2.9 2.6 2.3 1.6 0.8 0.1 0.4 4.4 3.5 3.8 2.9 7.2 4.7 0.4 0.1 0.3 1.0 21.7 3.4 2.5 3.4 6.8 3.5 0.5 0.1 0.3 2.4 3.7 2.9 4.4 4.6 0.5 0.1 0.4 1.1 2.4 2.5 0.7 4.6 2.5 3.3 5.1 7.0 5.8 3.3 1.1 0.5 0.5 0.3 0.1 0.0 2.0 1.3 0.0 0.1 0.2 0.2 0.3 0.3 0.8 0.5 1.6 1.3 1.0 0.7 0.7 1.2 0.5 2.9 3.2 4.9 13.2 22.2 17.9 9.5 2.2 1.3 1.4 1.2 0.3 0.0 0.8 2.4 8.7 0.6 0.0 0.2 0.7 0.8 1.7 1.8 2.6 19. 3 1.0 12.9 2.4 3.02.9 0.9 4.1 3.2 3.4 3.3 2.6 1.4 0.7 0.3 0.1 0.6 1.5 2.8 3.6 2.4 3.7 3.1 4.2 3.9 4.1 3.9 3.5 3.5 3.5 3.1 1.9 1.0 0.4 0.1 1.4 3.6 1.3 0.1 0.3 0.6 1.1 1.4 1.4 1.4 1.7 1.8 1.5 1.6 1.5 1.3 3.6 1.2 0.5 3.5 3.7 3.4 3.4 1.5 2.4 1.6 1.0 0.1 3.5 0.3 0.7 3.5 3.2 2.8 0.1 0.6 0.8 1.3 2.2 2.8 2.9 2.3 1.1 0.7 0.6 0.5 1.0 0.5 2.7 0.1 2.9 0.4 0.1 0.4 4.7 0.8 3.9 3.7 3.5 1.1 0.1 0.5 0.5 4.2 3.0 3.2 3.4 2.4 1.9 3.6 3.7 3.6 3.2 2.9 2.7 2.8 2.2 1.4 0.4 2.2 1.5 2.5 1.5 3.5 0.1 1.6 2.4 1.9 2.8 2.9 2.8 2.5 2.1 1.7 1.5 0.2 0.0 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.2 0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.1 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.3 0.1 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.5 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.3 0.50.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.4 0.3 0.5 0.5 0.3 0.2 0.2 0.2 0.3 0.4 0.0 0.2 Luminaire Schedule Calculation Summary Label CalcType Units Avg Symbol Qty Label Arrangement Description LLF Luminaire Lumens Luminaire Watts Max Min Avg/Min 1 Max/Min 12L-FTI-IL Single MRS-LED-12L-SIL-FT-40-70CRI-IL 0.900 8077 86 Site Illuminance Fc 2.6 22.2 0.0 N.A.N.A. Site_1 Illuminance Fc 2 R-B Single LAD6-LED-14L-40-WF-TR6R-SF-HAZ 0.900 1337 14 1 R-A Single LAD6-LED-14L-40-WF-TR6R-SF-HAZ 0.900 1337 14 1 WM_9 GROUP BLADE 25° UP 45° DOWN 0.900 N.A.N.A. 3 WM GROUP BLADE 25° UP 45° DOWN 0.900 N.A.N.A. 1 11W-45°Single BLADE DOWN MEDIUM 11W 3000K 45°0.900 659 10.2 4 C Single CRUS-SC-SLW-40 0.900 5728 38 3 18L-FT-IL Single MRS-LED-18L-SIL-FT-40-70CRI-IL 0.900 11444 135 1 18L-2-IL Single MRS-LED-18L-SIL-2-40-70CRI-IL 0.900 11040 135 0.1 0.5 0.0 N.A.N.A. StatArea_1 Illuminance Fc 3.4 22.2 0.3 11.4 74.0 SITE INFORMATION CONCRETE SIDEWALK TOTAL SITE AREA: TOTAL LOT COVERAGE: TOTAL GREEN SPACE: CURRENT ZONING: BUILDING SETBACKS: MAX BUILDING HEIGHT: PAVING SETBACKS: TOTAL PAVED AREA: PARKING REQUIREMENTS: OTHER INFORMATION: GENERAL NOTES: 1. REFER TO BUILDING ELEVATIONS SHEET FOR MONUMENT SIGN DESIGN. (FOR REFERENCE ONLY) SITE MAP: PROJECT SITE LOCATION 8280 Flying Cloud Dr Eden Prairie, MN 55344 CONCRETE DRIVE UP PAD 21,254 SF (61.02%) 11,681 SF (38.98%) 16,572 SF 34,828 SF (0.80 AC) REGIONAL SERVICE COMMERCIAL (C-REG-SER) FRONT YARD = 35'-0" SIDE YARD = 20'-0" REAR YARD = 10'-0" 40'-0" (4-STORIES MAXIMUM) 5/1000 SF OF RETAIL SPACE (14) STALLS REQUIRED (19) STALLS + (1) ACCESSIBLE = (20) PROVIDED FRONT YARD = 10'-0" SIDE YARD = 10'-0" REAR YARD = 0'-0" FLOOR AREA REQUIREMENTS (F.A.R):0.2 (1-STORY) REQUIRED 0.08 PROPOSED BASE AREA RATIO (B.A.R):0.2 REQUIRED 0.08 PROPOSED 1 F L Y I N G C L O U D D R I V E M I D D L E S E T R O A D PROPOSED CREDIT UNION BUILDING 2,890 GSF (FOOTPRINT) 650 SF (DRIVE THRU) TRANSFORMER LOCATION DUMPSTER LOCATION ATM E M PLOYEE ENTR Y (2) BOLLARD STYLE BIKE PARKING (6) (7) (7) TYP9' - 0" 9' - 0"5' - 0"9' - 0" BYPASS 13' - 0" PARKIN G SETBACK 10' - 0" BUILDIN G SETBA CK 35' - 0" PARKIN G SETBA CK 10' - 0" BUILDIN G SETBACK 20' - 0" BUILDIN G SETBACK 20' - 0" PARKIN G SETBACK 10' - 0" T O PROPERTY LINE 41' - 6" T O PR O PERTY LINE 69' - 3" 24' - 0" 18' - 0" TO PR OPERTY LINE 70' - 5" SIG N AGE SETBACK 20' - 0" O NE W AY 13' - 0" TYP 18' - 0" DRIVE AISLE 24' - 0" TYP 18' - 0" 60' - 0" 14' - 0" 8' - 0" 36' - 0" O NE W A Y RETAINING WALL W/ RAILING - REFER TO CIVIL DRAWINGS MONUMENT SIGN LOCATION M EM BER ENTRY 14' - 0" EQEQEQEQ 6 1 / 4 " 0550-02 0550-02 B2030-B CL CL CL CL 6' - 6 5 / 8 " 4 PR101 0550-02 0550-17 4 PR101B1020-C T. O . B L O C K 6' - 8 " STN-1 4 PR101 B1020-C T. O . B L O C K 6' - 8 " STN-1 0550-02 B1020-C 0420-22 0420-06 0616-14 0771-02 0725-02 B1020-C c The Redmond Company2025 24627 2025-06-03 Veridian Credit Union Architectural Site Plan Presentation N N PLANTRUE 1/16" = 1'-0" ARCHITECTURAL SITE PLAN (REVISED)A1 0'8'16'32' SCALE: 1/16" = 1'-0" 1/4" = 1'-0" ENLARGED TRASH ENCLOSURE PLAN1 1/4" = 1'-0" TRASH ENCLOSURE - FRONT ELEVATION2 1/4" = 1'-0" TRASH ENCLOSURE - REAR ELEVATION3 1/4" = 1'-0" TRASH ENCLOSURE - SIDE ELEVATION5 1/2" = 1'-0" TRASH ENCLOSER- SECTION4 PERSPECTIVE - TRASH ENCLOSURE6 1 ROOF STRUCTURE RE F . VESTIBULE WAITING AREA MEMBER LOBBY AREA IT / DATA MECH. / CUST. TELLER WORK AREA TELLER AREA MEN'S REST. WOMEN'S REST. QUIET ROOM BREAKROOM N/D REFRESHMENT AREA OFFICE OFFICE OFFICE 3' - 0 " 1 6 ' - 8 2 1 / 3 2 " 2 2 ' - 2 1 / 4 " 3' - 4" 12' - 8" 25' - 3" 11 ' - 8 " 8" 13 ' - 0 " 45' - 2" 3' - 0" 1' - 1 11/16" 2' - 2 5/16" 5' - 0" 1' - 1 1 " 2' - 2 " 10' - 0" 2' - 0 " 1 2233 SF BUSINESS (B) (15) 142 SF STORAGE (S-1) (1) 125 SF BUSINESS W/ ASSEMBLY (B) (9) OCCUPANCY BUSINESS (B) BUSINESS W/ ASSEMBLY (B) STORAGE (S-1) 72" 36 " FEC FEC KNOX BOX LOCATION 2,233 SF / 15 OCC 125 SF / 9 OCC 127 SF / 1 OCC PA T H ' A ' PA T H ' A ' PA T H ' B ' PATH 'C' PA T H ' C ' MEANS OF EGRESS XX"MEANS OF EGRESS: ROOM OR LEVEL XX" = CLEAR WIDTH OF OPENING GROUP B XXX SF (XX) AREA TAG ROOM/AREA USE ROOM/AREA SIZE ROOM/AREA OCCUPANT LOAD PATH OF TRAVEL XX"MEANS OF EGRESS: EXIT DISCHARGE XX" = CLEAR WIDTH OF OPENING A4 AS101 14' - 0" EQEQEQEQ 5 5 / 8 " 0550-02 0550-02 B2030-B AS101 A2 CL CL CL CL 6' - 6 " 5 PR102 0550-02 0550-17 5 PR102 A4 AS101 T. O . B L O C K 6' - 8 " STN-1 5 PR102 T. O . B L O C K 6' - 8 " STN-1 0550-02 0420-22 0420-06 0616-14 0771-02 0725-02 B1020-C 6" 5 1 / 2 " CL CL 6" 0550-02 0550-14 0550-15 0550-17 0420-03 STN-1 c The Redmond Company2025 24627 2025-06-03 Veridian Credit Union First Floor Presentation Plan N N PLANTRUE 3/16" = 1'-0" FIRST FLOORA1 N N PLANTRUE 3/16" = 1'-0" FIRST FLOOR PRESENTATIONA2 EXIT ACCESS TRAVEL DISTANCE PATH A 68' - 6" PATH B 22' - 6" PATH C 77' - 6" PATH D 91' - 0" CONSTRUCTION TYPE: OCCUPANCY: BUILDING SIZE:ALLOWABLE PROVIDED HEIGHT: STORIES: FLOOR AREA: FIRE ALARM: FIRE SUPPRESSION: MAX EXIT DISTANCE: 40'-0" 2 9,000 GSF 25'-9" 1 2,890 GSF BUSINESS (B) VB -NON-SPRINKLERED COMPLETE NONE 200' CODE INFORMATION OVERALL BUILDING AREA:2,890 GSF CANOPY AREA: 650 SF NOTE: FIRE ALARM SPECIFICATIONS WILL BE PROVIDED AS PART OF THE BUILDING PERMIT REVIEW. 1/4" = 1'-0" ENLARGED TRASH ENCLOSURE PLANB1 1/4" = 1'-0" TRASH ENCLOSURE - FRONT ELEVATIONB2 1/4" = 1'-0" TRASH ENCLOSURE - REAR ELEVATIONB3 1/4" = 1'-0" TRASH ENCLOSURE - SIDE ELEVATIONB4 1/2" = 1'-0" TRASH ENCLOSER- SECTION51 1/2" = 1'-0" TRASH ENCLOSURE DOOR HINGE Copy 1B5 1 ALUMINUM COMPOSITE PANEL ALUMINUM FRAMED STOREFRONT SYSTEM STONE VENEER CAST STONE METAL COPING METAL SIDING CAST STONE STONE VENEER ALUMINUM COMPOSITE PANEL ACM PANEL 19 ' - 2 " ACCENT LED TAPE LIGHT (W/IN COVE) METAL SUNSHADE -COLOR TO MATCH WINDOW ASSEMBLY 1 ACM PANELS ANODIZED ALUMINUM ACM PANEL ALUMINUM COMPOSITE PANEL ALUMINUM FRAMED STOREFRONT SYSTEM STONE VENEER METAL COPING METAL SIDING ALUMINUM FRAMED STOREFRONT SYSTEM CAST STONE INTERNALLY ILLUMINATED SIGNAGE 10' - 9 1/4" 3' - 4 3 / 4 " UP-DOWN WALL SCONCE 7' - 9 " 1 8 ' - 0 " 15 ' - 8 " METAL SUNSHADE -COLOR TO MATCH WINDOW ASSEMBLY 1 OV E R A L L B U I I L D I N G H E I G H T 25 ' - 9 " ACM PANEL ALUMINUM COMPOSITE PANEL ALUMINUM FRAMED STOREFRONT SYSTEM STONE VENEER CAST STONE METAL COPING METAL SIDING CAST STONE STONE VENEER CAST STONE ALUMINUM COMPOSITE PANEL METAL COPING METAL SIDING ALUMINUM STOREFRONT SYSTEM UP-DOWN WALL SCONCE 18 ' - 8 " 15 ' - 8 " ACCENT LED TAPE LIGHT (W/IN COVE) 1 ALUMINUM COMPOSITE PANEL ALUMINUM FRAMED STOREFRONT SYSTEM STONE VENEER CAST STONE ACM PANELS ALUMINUM COMPOSITE PANEL METAL COPING METAL SIDING ALUMINUM STOREFRONT SYSTEM INTERNALLY ILLUMINATED SIGNAGE ALUMINUM STOREFRONT SYSTEM 18 ' - 8 " ø 7' - 0 1/2" LED TAPE LIGHTS W/ 4" ACRYLIC LENS @ INTERNAL EDGE OF THE HOOD (SIDES & TOP) ACCENT LED TAPE LIGHT (W/IN COVE) METAL SUNSHADE -COLOR TO MATCH WINDOW ASSEMBLY 1 7' - 9 " 1 8 ' - 0 " OV E R A L L B U I L D I N G H E I G H T 25 ' - 9 " 1 STONE VENEER: EDWARDS STONE 'SUNSET BLEND' EXTERIOR MATERIAL LEGEND ACM PANEL (DRIVE-UP CANOPY & ENTRY): ALPOLIC 'BGN GREEN' METAL SIDING: LUX ARCHITECTURAL PRODUCTS 'BRUSHED CARBON' 6" LAP PATTERN (HORIZONTAL) CAST STONE: CUSTOM CAST STONE 'SANDSTONE' ACM PANEL (ACCENT): ALPOLIC 'AGT ALUMINUM GREY' METAL COPING / BREAK METAL PAC CLAD OR EQUAL 'MIDNIGHT BRONZE' WINDOW ASSEMBLY (CURTAINWALL / STOREFRONT) KAWNEER OR EQUAL 'BLACK ANODIZED' ALUMINUM GLAZING: VITRO GLASS; CLEAR MORTAR: UM3410 -'CALAMUS' MORTAR: UM3410 -'CALAMUS' GENERAL NOTES: 1. PROVIDE SUNSHADES EQUIVALENT TO THE WINDOW ASSEMBLY CHOSEN. REFER TO ELEVATIONS FOR SUNSHADE LOCATION. COLOR SHALL MATCH WINDOW FRAMES. 2.LIGHT FIXTURES ARE TO BE SIMILAR IN SIZE, SHAPE AND FUNCTION AS INDICATED IN THE DRAWINGS. STONE VENEER: CLASS 1 AREA: 563 SF PERCENTAGE: 48% EXTERIOR MATERIAL AREAS ACM PANEL: CLASS 2 AREA: 57 SF PERCENTAGE: 5% METAL SIDING: CLASS 2 AREA: 24 SF PERCENTAGE: 2% CAST STONE: CLASS 1 AREA: 30 SF PERCENTAGE: 3% ACM PANEL: CLASS 2 AREA: 70 SF PERCENTAGE: 6% WINDOW ASSEMBLY (CURTAIN WALL / STOREFRONT): CLASS 1 AREA: 416 SF PERCENTAGE: 36% NORTH: 1158 SF STONE VENEER: CLASS 1 AREA: 300 SF PERCENTAGE: 20% ACM PANEL: CLASS 2 AREA: 124 SF PERCENTAGE: 8% METAL SIDING: CLASS 2 AREA: 138 SF PERCENTAGE: 9% CAST STONE: CLASS 1 AREA: 85 SF PERCENTAGE: 6% ACM PANEL: CLASS 2 AREA: 120 SF PERCENTAGE: 7% WINDOW ASSEMBLY (CURTAIN WALL / STOREFRONT): CLASS 1 AREA: 765 SF PERCENTAGE: 50% EAST: 1541 SF STONE VENEER: CLASS 1 AREA: 275 SF PERCENTAGE: 24% ACM PANEL: CLASS 2 AREA: 82 SF PERCENTAGE: 7% METAL SIDING: CLASS 2 AREA: 50 SF PERCENTAGE: 4% CAST STONE: CLASS 1 AREA: 40 SF PERCENTAGE: 3% ACM PANEL: CLASS 2 AREA: 77 SF PERCENTAGE: 7% WINDOW ASSEMBLY (CURTAIN WALL / STOREFRONT): CLASS 1 AREA: 638 SF PERCENTAGE: 55% SOUTH: 1162 SF STONE VENEER: CLASS 1 AREA: 911 SF PERCENTAGE: 55% ACM PANEL: CLASS 2 AREA: 90 SF PERCENTAGE: 5% METAL SIDING: CLASS 2 AREA: 160 SF PERCENTAGE: 10% CAST STONE: CLASS 1 AREA: 85 SF PERCENTAGE: 5% ACM PANEL: CLASS 2 AREA: 155 SF PERCENTAGE: 9% WINDOW ASSEMBLY (CURTAIN WALL / STOREFRONT): CLASS 1 AREA: 263 SF PERCENTAGE: 16% WEST: 1664 SF CLASS 1:87% CLASS 2:13% CLASS 1:75% CLASS 2:25% CLASS 1:82% CLASS 2:18% CLASS 1:76% CLASS 2:24% 4' - 0 " 3 5 / 8 " 6 ' - 0 " 10 ' - 3 5 / 8 " 5' - 1" 4' - 8" 2' - 6 " 1 1/2"1 1/2" DIGITAL: 11.7 SF TOTAL: 30.5 SF DIGITAL READER BOARD INTERNALLY ILLUMINATED SIGNAGE METAL PANEL CAST STONE STONE VENEER OPP SIDE SIM c The Redmond Company2025 24627 2025-06-03 Veridian Credit Union Color Building Elevations 3/16" = 1'-0" NORTH ELEVATION PRESENTATIONA3 3/16" = 1'-0" EAST ELEVATION PRESENTATIONC1 3/16" = 1'-0" WEST ELEVATION PRESENTATIONB1 3/16" = 1'-0" SOUTH ELEVATION PRESENTATIONA1 1/2" = 1'-0" MONUMENT SIGN ELEVATIONB2 1 c The Redmond Company2025 24627 2025-06-03 Veridian Credit Union Color Renderings Building Entrance (Day):Green Alpolic metal panels frame the aluminum glass system. Carbon colored aluminum siding breaks up overall facade. A stone blend anchors the corner of the building as well as provides an area for signage. Building Entrance (Night):The Alpolic panels are side lit next to the aluminum entry facade to give depth to the entry hood as well as provide light to the entry doors. Drive-Up Canopy:Green Alpolic metal panels continue to pull the Veridian marketing colors onto the north elevation. The canopy will contain the pneumatic tubes as well as can light fixtures as well as green tape lights along the interior edge for nighttime lighting. North Elevation:The carbon colored aluminum siding frames a natural stone blend that is used across the elevation, broken by clearstory windows that provide natural light to the Teller Work Area. Back-lit signage is also used on the west elevation. Green LED tape light is placed at the top of the stone band which provides additional branding and visual interest to the building at night.