Loading...
HomeMy WebLinkAboutPlanning Commission - 09/09/2024AGENDA EDEN PRAIRIE PLANNING COMMISSION Monday, September 9, 2024 PLANNING COMMISSION MEMBERS: John Kirk, Andrew Pieper, Ed Farr, Robert Taylor, Daniel Grote, Frank Sherwood, Charles Weber, Phou Sivilay, Trisha Duncan STAFF MEMBERS: Jeremy Barnhart, City Planner; Carter Schulze, City Engineer; Matt Bourne, Manager of Parks and Natural Resources I. CALL THE MEETING TO ORDER II. PLEDGE OF ALLEGIANCE III. APPROVAL OF AGENDA IV. MINUTES A. Approval of the Planning Commission Meeting minutes dated August 26, 2024 V. PUBLIC HEARINGS A. Wunderlich-Malec Building Addition Request for: • PUD Concept Review on 5.13 acres • PUD District Review with waivers on 5.13 acres • Site Plan Review on 5.13 acres B. Costco Fuel Facility Expansion • PUD Amendment with waivers on 18 acres • Site Plan Review on 18 acres VI. PLANNERS’ REPORT VII. MEMBERS’ REPORTS VIII. ADJOURNMENT ANNOTATED AGENDA TO: Planning Commission Members FROM: Jeremy Barnhart, City Planner RE: Planning Commission Meeting for Monday, September 9, 2024 _______________________________________________________________________________ MONDAY, SEPTEMBER 9, 2024 7:00 PM, COUNCIL CHAMBERS I. CALL THE MEETING TO ORDER II. PLEDGE OF ALLEGIANCE III. APPROVAL OF AGENDA MOTION: Move to approve the agenda. IV. APPROVAL OF MINUTES A. PLANNING COMMISSION MEETING HELD MONDAY, AUGUST 26, 2024 MOTION: Move to approve the Planning Commission minutes dated August 26, 2024 V. PUBLIC HEARINGS A. Wunderlich-Malec Building Addition (2024-06) Request for: • PUD Concept Review on 5.13 acres • PUD District Review with Waivers on 5.13 acres • Site Plan Review on 5.13 acres Wunderlich-Malec Engineering is proposing a 2nd floor expansion of its building at 6101 Blue Circle Drive. The proposed 8,050 vertical expansion will allow the business to convert existing office space on the first floor to warehousing. The applicant is asking for a waiver for number of parking stalls. MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for Planned Unit Development Concept Review, Planned Unit Development District Review with waivers, and Site Plan Review, all on 5.13 acres as represented in the September 9, 2024 staff report, subject to the conditions listed in the staff report. ANNOTATED AGENDA September 9, 2024 Page 2 B. Costco Fuel Expansion (2023-09) Request for: • PUD Amendment with waivers on 18 acres • Site Plan Review on 18 acres The applicant is proposing a fuel facility expansion of the canopy to cover seven (7) new pumps. There will be no alterations to the principal Costco building. A new, underground storage tank and controller enclosure will also be installed. The fuel facility expansion will remove 16 existing parking stalls. The removal of the stalls does not impact the Code required parking for the site. A waiver is requested for driveway width for the western entrance/exit for the site to accommodate truck turning movements. MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for Planned Unit Amendment with waivers and Site Plan Review on 18 acres as represented in the September 9, 2024 staff report, subject to the conditions listed in the staff report. PLANNERS’ REPORT VII. MEMBERS’ REPORT VIII. ADJOURNMENT MOTION: Move to adjourn the Planning Commission meeting. UNAPPROVED MINUTES EDEN PRAIRIE PLANNING COMMISSION MONDAY, AUGUST 26, 2024 7:00 PM—CITY CENTER Council Chambers 8080 Mitchell Road COMMISSION MEMBERS: John Kirk, Frank Sherwood, Andrew Pieper, Ed Farr, Trisha Duncan, Robert Taylor, Dan Grote, Charles Weber; Phou Sivilay CITY STAFF: Jeremy Barnhart, City Planner; Carter Schulze, City Engineer; Matt Bourne, Manager of Parks and Natural Resources; Kristin Harley, Recording Secretary I. CALL THE MEETING TO ORDER Acting Chair Farr called the meeting to order at 7:09 p.m. II. PLEDGE OF ALLEGIANCE – ROLL CALL Commission members Pieper and Weber were absent. III. APPROVAL OF AGENDA MOTION: Grote moved, seconded by Duncan to approve the agenda. MOTION CARRIED 8-0. IV. MINUTES MOTION: Taylor moved, seconded by Duncan to approve the minutes of May 28, 2024. MOTION CARRIED 8-0. V. PUBLIC HEARINGS A. 11609 LEONA ROAD REDEVELOPMENT (2024-05)) Request for • Planned United Development Concept Review on 3.44 acres • Planned Unit Development Amendment with waivers on 3.44 acres • Site Plan Review on 3.44 acres Trent Mayberry, of Toll Development company, displayed a PowerPoint and detailed the application. He also introduced Kathy Anderson from Architectural PLANNING COMMISSION MINUTES August 26, 2024 Page 2 Consortium and engineer Matthew Lingam,. The proposed development would create a Planet Fitness and a Starbucks at the site of the former Office Depot. The site was a vacant 33,000 square foot building with an overgrown landscape and a parking lot needing repair. This property was purchased two years ago in anticipation of Office Depot not renewing the lease, which did occur. The site plan included renovating the building, modernizing the storefront, and using three-quarters of the building, reserving the rest for a Planet Fitness. The parking lot would be expanded and some outlot development would be included. The northeast corner would be a site of future potential retail development. Mayberry displayed elevations with the proposed renovation and the new façade. There would be added windows in the north and east elevations. The Starbucks rendering showed a completely new building, and Mayberry had worked with staff on a design that matched the renovated building with horizontal lines and pleasing canopies. Mayberry detailed the sustainability elements, which included above ground and below ground stormwater management. improved pedestrian/bicycle connectivity, enhanced landscaping and EV charging capability at the Starbucks building. Taylor asked if there would be EV charging at the main building, and Mayberry replied there would not be. He anticipated more demand at the Starbucks but more EV-readiness could be added in the future. Farr asked there would possibly be a variance needed for the driveway of the future potential retail development in the northeast corner which was not being development for this application. Mayberry replied there would be two driveways but the driveway in the northeast corner would be closed off. The question was impossible to answer at this time, but he did not anticipate opening that northeast section again for a driveway in the future. With future development the applicant would have to get site plan approval again. Farr emphasized looking ahead with a rational configuration. Farr also asked if the site lighting plan included LED pole lights in the existing lot. Mayberry replied both business would have brand new lighting, and he was working with staff on a future lighting development agreement timeline. Farr noted the emailed reactions from neighbors asked him to comment on Eric Mueller’s concerns in particular. Mayberry replied he had had conversations with Mueller from the start of the process to collaborate on solutions. The latest emailed comments were new back-and-forth with Sarah Strain, and her proposed solutions were manageable and he would work with staff on them. Farr noted the internal site directional signage for potentially six businesses with shared driveways with a few competitors was a concern. Mayberry agreed, and emphasized that Den Road was a two-way road, not a one-way as raised as a PLANNING COMMISSION MINUTES August 26, 2024 Page 3 concern. It was in his interest to find a circulation solution that worked for everyone. Barnhart presented the staff report. The application was being requested without a specific development idea for the northeast corner. Along with a PUD concept review, two waivers were being requested: an impervious surface limitation of 75 percent, and a 27-foot setback from Leona Road down from 35 feet. In the future development, as long as the total impervious surface was less than 75 percent, no waiver would be needed; staff would of course review that proposal as well. The setback would result in no visual impacts to the neighbors, sightlines, screening, et cetera. Staff had reviewed the access and stacking. Residents had commented on the overall appearance of the site, which would be vastly improved, made more attractive, and sightlines improved. There were unique timing constraints for this application, which requested early demolition and the potential future development. This application would provide parking lot islands in the northeast corner for now. Planet Fitness was considered retail for parking requirements and would share this with the shopping center. Staff had considered the applicant’s neighbors’ comments and assured the commission members there would be two-way traffic through the site and the proper utility work coordination necessary during construction. This could work through via permitting process. The Starbucks was subject to the Sustainable Buildings Standards, being a new building, and would offer EV parking spaces and future solar panels enhancement. More detailed sustainable questions would be answered during the building permit process. The architecture showed a cohesive development with not all identical but matching and complementary materials. Staff recommended approval of the development subject to the conditions outlined in the staff report. Farr asked for and received confirmation the Starbuck’s drive-through lane being paved required a front-yard setback rather than a parking requirement. He noted the landscape plan included a tree in the middle of the reconstructed driveway off Leona, and Barnhart replied graphical error will be corrected; the two driveways would align with those of the Best Buy across the street. Farr stated the main entry driveway had a nice landscape median between Starbucks and the entry driveway, but he wondered if painted striping was warranted on the entrance driveway so cars would not wander. Barnhart replied staff would consider it. Farr suggested building the stormwater underground chamber to encompass the future stormwater compliance of the presently undeveloped northeast corner. Matthew Lingam, engineer for Kimley Horn, confirmed the new stormwater system would have the capacity to handle the future stormwater needs from that site when developed in the future. Connor O’Neill, property manager at 11611 Leona Road, spoke on behalf of Eric Mueller who could not attend. The three concerns were maintaining the access drive which must be wide enough to permit uninterrupted two-way access during PLANNING COMMISSION MINUTES August 26, 2024 Page 4 all phases of construction; maintaining a straight-line exit for trash pickup on Mondays, Wednesdays, Fridays, and Saturdays; and addressing visibility in the center with tree trimming and adequate signage. He hoped the commission would take action tonight to address these concerns, and noted some had already been addressed. Farr replied the commission could not solve these concerns but was empathetic to them, and clarified the second concern was access for trash removal during construction. He suggested the temporary signage and the applicant phasing the work to accommodate the owner’s needs would address most of the concerns. Barnhart replied the area was overgrown and the applicant and the City would work together to address this. A balanced approach would be used as the trees were planted due to City requirements, and would not be arbitrarily removed. MOTION: Kirk moved, seconded by Grote to close the public hearing. Motion carried 8-0. Duncan commended the project; her only concerns were the drive-through stacking at Starbuck’s, which had been addressed. Kirk echoed her comments and stated the details had been addressed by the applicant and staff for optimum development. Farr found the project acceptable and very attractive. He commended the design of the Starbucks and the renovation of the old Office Depot building. He looked forward to the development of the northeast corner in the future. He appreciated the applicant’s willingness to work with the neighboring business owners and agreed with the waivers. MOTION: Duncan moved, seconded by Sherwood to recommend approval of a Planned United Development Concept Review on 3.44 acres; Planned Unit Development Amendment with waivers on 3.44 acres; Site Plan Review on 3.44 acres as represented in the August 26, 2024 staff report subject to the conditions. Motion carried 8-0. PLANNERS’ REPORT MEMBERS’ REPORTS VI. ADJOURNMENT MOTION: Taylor moved, seconded by Kirk to adjourn. Motion carried 8-0. The meeting was adjourned at 7:46 p.m. TO: Planning Commission FROM: Ben Schneider, Planner I DATE: September 9, 2024 SUBJECT: Wunderlich-Malec Building Addition LOCATION: 6101 Blue Circle Drive APPLICANT: TWP Architects REQUESTS: • Planned Unit Development Concept Plan Review on 5.13 acres • Planned Unit Development District Review with Waivers on 5.13 acres • Site Plan Review on 5.13 acres 120 – Day Review Period: November 15, 2024 BACKGROUND Wunderlich-Malec Engineering is proposing an approximately 8,000 square foot vertical building addition to support increasing warehousing needs for their business at 6101 Blue Circle Drive. The site is adjacent to the former American Family Insurance campus to the west and borders Highway 62 to the south. The municipal border between Eden Prairie and Minnetonka runs along the north property line. To the east, the site abuts a City-owned lot with a protected wetland. ZONING AND COMPREHENSIVE PLAN The subject property is zoned Industrial Park (I-2) and guided Industrial Flex Tech. There are no proposed changes to the zoning or guiding of this property. SITE PLAN The existing building has two stories of office space on the north side and one story of office and manufacturing space on the southern half. The proposed addition would add a second story to a portion of the south side of the building and Proposed location of 2nd story addition Staff Report – Wunderlich-Malec Building Addition September 9, 2024 Page 2 2 connect with the existing second story. Since this is proposed to be a vertical addition, the overall building footprint would not change. Following construction, existing office space on the first floor would be moved to the new addition on the second floor. This would free up space on the first level for more warehousing near the loading dock and manufacturing space. The proposed use breakdown is 30,753 square feet (55%) office, 7,285 (13%) manufacturing, and 18,255 square feet (32%) warehousing. All these uses are permitted in the I- 2 Zoning District. PLANNED UNIT DEVELOPMENT WAIVERS The purpose of a Planned Unit Development (PUD) as stated in the City Code is to provide for a more creative and efficient approach to the use of land within the City; to allow variety in the types of environment available to people and distribution of overall density of population and intensity of land use where desirable and feasible; and provide for greater creativity and flexibility in environmental design. The applicant is requesting the following waiver: • Number of Parking Stalls. The number of parking stalls required by City Code with the proposed use breakdown would be 187 stalls, increasing the code requirement by 20 spaces. The applicant is requesting a waiver to have 136 parking stalls. The project narrative provides an analysis of the applicant’s current and future business needs for parking. Wunderlich-Malec utilizes a hybrid working strategy with their office employees, and they calculate their business need to be 108 parking stalls. The applicant anticipates adding six (6) employees in the future. There are currently 136 stalls on the property, which exceeds the business needs of the applicant. There have been no identified parking issues to date at this site. Staff supports this waiver request given these findings. ARCHITECTURE The addition is proposed to match the existing building materials. The proposed façade primarily Staff Report – Wunderlich-Malec Building Addition September 9, 2024 Page 3 3 features brick and glass. City Code requires at least two (2) class I materials in the I-2 Zoning District. In situations where glass is one of the two materials, the other material must have two distinct color variations. The existing and proposed façades meet these standards. The maximum building height in the I-2 Zoning District is 40 feet. The proposed maximum building height is 33 feet. STORMWATER MANAGEMENT The applicant is not proposing any changes to stormwater management on site. LANDSCAPING AND SCREENING The building addition will require 25 caliper inches of additional landscaping on the site. Staff has communicated that a landscaping plan will need to be submitted prior to the first reading at City Council. This is included as a condition of approval at the end of this report. The applicant provided an exhibit that shows how the building will look from Highway 62. Several existing mature trees provide screening of the building from the highway. PLAN ITERATIONS The applicant initially proposed a building expansion to the east, encroaching on the high-quality wooded area on the site. Wunderlich-Malec found an alternative solution that protects these trees. The proposed vertical expansion satisfies staff’s initial concerns, as tree removal is no longer shown on the plans. STAFF RECOMMENDATION Staff recommends approval of the following request: • Planned Unit Development Concept Review on 5.13 acres • Planned Unit Development District Review with Waivers on 5.13 acres • Site Plan Review on 5.13 acres This is based on the plans dated August 16, 2024, staff report dated September 9, 2024, and the following conditions: 1. Prior to the 1st reading by the City Council, the applicant must: A. Submit a landscaping plan that includes 25 caliper inches of new plantings consistent with the requirements in City Code Section 11.42. 2. Prior to building permit issuance for the property, the applicant must: Staff Report – Wunderlich-Malec Building Addition September 9, 2024 Page 4 4 A. Provide a landscape surety that is 150% of the estimated cost of the plantings and submit a landscape agreement. 3. The following waivers are granted through the PUD for the project as indicated in the plans dated August 16, 2024. A. The number of parking stalls required by City Code with the proposed use breakdown would be 187 stalls. The applicant is requesting a waiver to have 136 parking stalls. Introduction: Wunderlich-Malec (WM) is an engineering company, founded in Minnesota in 1981. There was one employee in 1981 and in 2024 there are now more than 600 employees, located in 35 cities and 24 states. Eden Prairie is the WM corporate headquarters, and pre- Covid there had been as many as 120 employees working in the EP office. There is a second Minnesota satellite office in St. Paul. The company provides engineering services, along with furnishing control equipment and subcontracted services from electrical and mechanical contractors. The WM customer base is widespread and industries served include electric utility, medical sciences, oil and gas, manufacturing, civic works projects and many more. Wunderlich-Malec as a company does about 20% of its revenue in the life science industries, including key pharmaceutical manufacturers. Other major vertical markets include the power and utility grid for the country, high-tech work including semiconductor and data centers, and food manufacturing for several Minnesota-based companies. Wunderlich-Malec (WM) bought the 48,800 sf building at 6101 Blue Circle Drive in 2015. It had previously been used as a laboratory building and the built environment was suited to this use. At that time, WM gutted the building and reconfigured all of the existing spaces to suit its needs as an engineering and production company. In recent years, the company has outgrown its production space with the expanded use of building controls on an ever-increasing variety of projects. To alleviate some of these growing pains, WM has reconfigured some existing spaces and let certain administrative and engineering staff work from home or be constricted to smaller workspaces to allow more square footage to be allocated to production and storage of the controls equipment. With increasing construction industry activities and longer project timelines, WM has seen both an uptick in orders and has been obliged to store more product for longer lengths of time to try to keep up with demand without sacrificing service. An expansion would give WM the extra space it needs to serve its customers in a timely fashion. The fabrication can only be done in-house and WM has concluded that an expansion in the Eden Prairie location is the best solution to provide the required space to meet customer needs. The engineering staff and shop employees work together on a daily basis and locating the shop in another facility would be a poor solution for operations. This expansion is planned to not increase the building footprint and to go up, over the manufacturing/warehouse space to create a second story office space. The engineering staff will occupy this space, outside of the first-floor manufacturing and warehouse zone, but still be close to the shop employees. A second story link to the existing office space allows office and engineering employees to remain connected to each other and existing services. Proposed second floor plan: Building Operations: Typically, semi-trucks bring goods to the site. Raw materials coming in at the docks are directed to storage areas to await the manufacturing process. From production to testing to storage, product flows steadily, and often back and forth, through this area. With high-bay storage, keeping production on one floor is critical to operations. Currently, the east section of the building, which was previously used for cubicles only, has been split to allow space for manufacturing storage. An expansion will allow the engineering staff to once again move to its own space but continue to be close to manufacturing. A new second story link will connect the administrative and engineering staff in the new addition to those in the main building. There are no staff increases in the administration or engineering groups, only redistribution. An increase of six employees is expected for the warehouse/manufacturing area. The shop floor is laid out strategically to facilitate workflow in a counterclockwise manner. Receiving to storage, to wiring benches, to finished test area and out to shipping. Common areas are strategically located to facilitate the least amount of movement of all components. Large enclosures go right to the CNC area. Inventory goods and labeling are centrally located to supply the wiring stations located around the exterior of the shop floor. Expanding the shop as shown to the east fits this material workflow perfectly by increasing the number of available exterior work-station areas while maintaining the centrally located components required to supply parts to the workstations. Developer Agreement: In 1993, a developer agreement approved a 50,550 sf building on 5.22 acres, along with a future building expansion of 20,000 sf along the east and south sides of the building. The agreement contemplated utility and erosion control, tree removal and replacement, parking, exterior materials, mechanical equipment screening, PUD waiver for setback, fire code requirements, and wetland mitigation. The original developer agreement did not identify building height or number of stories, so we feel that a second-story expansion well within the allotted 20,000 sf is in keeping with the spirit of the approved agreement. This proposed expansion does not interfere with any of the site functions that were contemplated in 1993 and most importantly, does not propose removing any trees. Proposed Addition: In 2024, this project proposes a second story building expansion of 7,650 square feet, plus a second story circulation expansion of 400 sf. This square footage does not affect the base area ratio and the floor area ratio is still well within the maximum 50% of site area. The expansion is intended to house existing engineering staff, with no plans to increase that staff in the next five years. The area on the first floor that office staff had occupied will be converted into warehouse storage. PUD Waiver: When Wunderlich-Malec bought the existing building in 2015, which is still the same footprint as when purchased, the amount of parking at 104 stalls was not identified as an issue with the purchase (although by square footage and use calculations, the building would have required 166 stalls). The original amount of parking has remained adequate for this Owner’s business since the purchase. On the site plan that WM received at that transaction, the plan showed a dashed-in area for future parking in the southwest corner of the property. The Owner added that parking pre-Covid (32 stalls) because in winter when there was a heavy snow season, they occasionally used additional parking stalls for snow storage. Since Covid, employees working from home have decreased parking needs even further than pre-Covid amounts. There are currently 136 parking stalls constructed on site. If strictly using square foot calculations, this addition would increase the required number of parking stalls to 187. That requirement being greater than the existing 136 spaces, we propose to look at the requirements in terms of needs, rather than square footage to avoid overparking and increasing impervious surface and runoff. We have provided calculations based on the actual number of employees that would be expected to be on site during the week. By actual desks and manufacturing positions, there would be 161 employees that could be expected to occupy the building. Since Covid, the business has instituted a nonoverlapping, three-day per week policy for engineering staff (office staff can work from home even more), and a five-days per week policy for manufacturing and warehouse. Considering this factor of 60% for office/engineering staff and 100% for manufacturing/warehouse, the required parking would be reduced to 108 stalls, well below the actual 136 existing stalls and able to accommodate all of the business’s needs. Traffic Memo: The Owner commissioned a traffic memo to be performed for the site. This memo was performed for the previously proposed addition on the east side, but we believe that no vital conclusions or observations regarding traffic have changed with the revised proposal of expanding vertically. The report determined that “the overall increase in site trip generation associated with the proposed expansion is expected to be relatively minimal and result in no significant change in intersection or roadway operations.” In Summary:  The project at 8,050 sf is a less intensive development of the site than the approved 20,000 sf expansion of 1993 and the approved agreement did not specify heights of the additions.  The proposed expansion is well within the 40’ height limitation.  The 1993 agreement contemplated and accepted tree loss. This project contemplates no tree loss.  The project requests a PUD waiver to allow for fewer parking stalls than indicated by zoning requirements.  The project is not expected to impact intersection or roadway operations.  Building materials on the proposed expansion shall be consistent with the existing building. The project will supply samples of the materials for staff review.  The project shall provide screening for any rooftop mechanical equipment associated with the expansion. 1. General description of the request or proposal. a. Expansion of 7,650 sf to existing manufacturing/office building with a 400 sf link. The proposed expansion will be a second story over the existing manufacturing area. No additional building footprint is being considered. The expansion is intended to house existing office employees—engineering staff that work with the manufacturing staff below, with no plans to increase this staff in the next five years. An area on the first floor that is situated directly below the proposed expansion will be converted into warehouse storage. An increase of five employees is expected for the warehouse/manufacturing area. 2. City Guide Plan framework. a. No change. 3. Zoning classification(s). a. I-2, no change 4. Variances or PUD waivers requested (if applicable). a. PUD parking waiver requested. If using square foot calculations, this addition would increase the required number of parking stalls to 184. We propose to review the requirements in terms of needs, rather than square footage. To avoid overparking and increased impervious surface and runoff, we have provided calculations based on the actual number of employees that would be expected to be on site during the week. By actual desks and manufacturing spots, there would be 161 employees that could be expected to occupy the building. Since Covid, the business has instituted a nonoverlapping, three-day per week policy for office staff, and a five-days per week policy for manufacturing and warehouse. Considering this factor of 60% for office staff and 100% for manufacturing/warehouse, the required parking would be reduced to 108 stalls, well below the actual 136 existing stalls and able to accommodate all of the business’s needs. 5. Existing and proposed land uses of project site and adjacent properties. a. Existing: business/manufacturing office. Proposed: no change 6. List of sustainability components, elements, and features that will be incorporated into the project. Identify if project is expected to be subject to the City’s Sustainable Building Standard. a. Addition is not more than 10,000 sf. 7. Summary of landscaping and/or tree replacement a. There is no landscaping or tree replacement proposed for this project, other than restoration from construction activities. 8. Phasing and construction schedule. a. Begin late autumn 2024, final completion spring 2025. 9. Development method (i.e., sales, lease, owner occupied). a. Owner occupied 10. Legal instruments, association documents, easements, covenants, and restrictions. Identify if any Right of Way or easements will be requested to be vacated. The vacation of Right of Way or easements is a separate process and must be coordinated with the final platting process. a. NA 11. Housing or land/building use profile (i.e., square foot of building, site area, Floor Area Ratio, Base Area Ratio, amount of parking, etc.). a. Existing building footprint 38,940 sf, Site Area: 227,384 sf, BAR: max 30% of site area=allowable 68,200 max sf., no change. Existing parking 136, no plans to expand see item 4. 12. Signage (locations, sizes, materials, and details). a. No change to existing. 13. Lighting (locations, type, and height) including photometric information. a. No change to existing site lighting. 14. Transportation capacity, impacts, Average Daily Trips, trip distributions, a.m. and p.m. peak hour movements, and sight lines at access points to public roads (may be a separate document) a. No proposed change to existing. See attached traffic memo. 15. Phase I Environmental Assessment (may be a separate document) a. NA 16. Environmental Assessment Worksheet or Environmental Impact Statement (if applicable). a. NA 17. Shoreland Ordinance/Floodplain restrictions (if applicable). a. NA 18. Airport Zones (if applicable). Identify if the property is in JAZB zones A, B, or C. a. NA 19. Disposition of any excess land. a. NA 20. Limits of disturbance (including area and volume (cut/fill analysis) of the earthwork proposed). a. NA 21. Summary of the stormwater management report. Projects that have land disturbance of greater than or equal to one acre (including projects of less than one acre that are part of a larger common plan of development or sale) shall also include a summary of the information required in part T of this handbook. a. NA 22. Water and Wetlands (including discussion of any identified water resource features including type of feature, shoreland classification(s), flood elevations, and determination of whether public waters and/or wetlands are present on or adjacent to the property). a. NA 23. Wildlife and endangered species (identify habitats, type, location, impacts and any mitigating measures that would be required). a. NA 24. Soils Classifications (including building, street, utility, or stormwater runoff management constraints and/or, special conditions of construction). a. NA 25. Existing structures (include historic features, e.g., foundations). a. Existing building to remain. 26. Steep slopes (slopes in excess of 12% and elevation difference of 30 feet or more) as defined in City Code Section 11.60 and bluffs as defined in City Code Shoreland Section 11.50. a. NA C0.0 TITLE SHEET WUNDERLICH-MALEC BUILDING EXPANSION EDEN PRAIRIE, MINNESOTA SITE LOCATION SITE LOCATION MAP N ISSUED FOR: CITY SUBMITTAL ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. SHEET INDEX SHEET NUMBER SHEET TITLE C0.0 TITLE SHEET V1.0 ALTA / NSPS LAND TITLE SURVEY C2.0 SITE PLAN PROJECT CONTACTS NAME & ADDRESS CONTACT CIVIL ENGINEER CIVIL SITE GROUP 5000 GLENWOOD AVE GOLDEN VALLEY, MN 55422 MATT PAVEK 612-615-0060 MPAVEK@CIVILSITEGROUP.COM PROPERTY OWNER / DEVELOPER ARCHITECT TWP ARCHITECTS, PA 4125 LAKELAND AVE N #200 MINNEAPOLIS, MN 55422 AMY SCHWABE 763-533-7171 X 20 ASCHWABE@TWPARCHITECTS.COM SURVEYOR CIVIL SITE GROUP 5000 GLENWOOD AVE GOLDEN VALLEY, MN 55422 RORY SYNSTELIEN 612-615-0060 RORY@CIVILSITEGROUP.COM GEOTECHNICAL ENGINEER CHOSEN VALLEY TESTING, INC. 245 ROSELAWN AVENUE EAST, SUITE 29 ST. PAUL, MN 55117 COLBY VERDEGAN 507-281-0968 VERDEGAN@CHOSENVALLEYTESTING.COM REVISION SUMMARY DATE DESCRIPTION Know what's below. before you dig.Call R WUNDERLICH PROPERTIES 2135 CARRIAGE LN WAYZATA, MN 55391 NEAL WUNDERLICH 612-802-9853 NEAL.WUNDERLICH@WMENG.COM civilsitegroup.com COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T PRE L I M I N A R Y : NO T F O R CO N S T R U C T I O N 2023 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 5/21/2024 CITY SUBMITTAL 7/3/2024 CITY RESUBMITTAL 8/16/2024 CITY RESUBMITTAL DRAWN BY RB, AM REVIEWED BY MP PROJECT MANAGER MP PROJECT NUMBER 24004 WU N D E R L I C H - M A L E C B U I L D I N G E X P A N S I O N 61 0 1 B L U E C I R C L E D R I V E , E D E N P R A I R I E , M N 5 5 3 4 3 TW P A R C H I T E C T S 41 2 5 L A K E L A N D A V E N U E N # 2 0 0 , M I N N E A P O L I S , M N 5 5 4 2 2 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/16/2024 PID: 0111622110011 Address: 6101 Blue Circle Drive PID: 0111622110003 Address: Unassigned Owner: City of Eden Prairie PID: 3611722440004 Address: Unassigned Owner: City of Minnetonka PI D : 0 1 1 1 6 2 2 1 2 0 0 1 1 Ad d r e s s : 6 1 3 1 B l u e C i r c l e D r i v e Ow n e r : A m e r i c a n F a m i l y M u t u a l I n s Access Bi t u m i n o u s Pa r k i n g L o t Bituminous Parking Lot Bituminous Parking Lot Bituminous Parking Lot Bituminous Parking Lot Bituminous Side w a l k Bi t u m i n o u s S i d e w a l k Concrete Co n c r e t e W a l k w a y Concrete Walkway Concrete Walkway Co n c r e t e Co n c r e t e Co n c r e t e Landscaping Pavers Rip-Rap Rip - R a p Rip-Rap Pond Chain Link F e n c e Chain Lin k F e n c e Iron Fence Stone Retaining Wall BLUE CIRCLE DRIVE (A Public R/W) (Width Varies) C.S.A.H. N O . 6 2 (A Public R / W ) (Width V a r i e s ) Generator 4 3 8 6 9 4 9 10 11 1 28 31 S77°24'1 8 " W 4 7 2 . 1 5 N0 4 ° 3 5 ' 3 3 " E 47 0 . 1 8 C=171.04 CB=N83°28'05"E R=443.24 Δ=22°14'56" 172.12 S85°24'27"E 189.58 S0 1 ° 1 6 ' 3 3 " W 2 9 7 . 7 3 2 5 . 0 0 S 1 2 ° 3 5 ' 4 2 " E S77°24'18 " W 1 4 3 . 9 8 2 Story Brick Building Foundation area = 38,963 +/- Sq. Ft. 10" DIP (Per Rec.) 36" C M P ( P e r R e c . ) (Per R e c . ) 30" RCP 30" RCP (Per Rec. ) 24" RCP (Per Rec.) 6" DI P F o r c e m a i n ( P e r R e c . ) 8" PVC (Per Rec.) Found 1/2 Inch Iron Pipe W/ Illegible Cap Found 1/2 Inch Iron Pipe W/ Illegible Cap Found CIM Found 1/2 Inch Open Iron Pipe Found Nail Fo u n d 1 / 2 I n c h I r o n Pi p e W / I l l e g i b l e C a p Found 1/2 Inch Iron Pipe W/ Cap No. 15480 Corner Falls in Water. No Monument Found or Set. Th e E L i n e o f T h e W 4 5 F e e t o f L o t 1 , Bl o c k 1 , O P U S l l 2 N D A D D I T I O N Drainage & Utility Easement Per Plat Landscaping Stone Retaining Wall S85°24'27"E 206.60 [A] Vacated Right of Way 8" Wat . S e r v . S 1 7 ° 0 2 ' 4 1 " E 1 7 7 . 2 2 5 7 Loading Docks Concrete Retaining Wall EX C E P T I O N Th e W L i n e o f L o t 1 , B l o c k 1 , OP U S l l 2 N D A D D I T I O N Survey Line Curb Cut 18" S t o r m (Per R e c ) 10" S t o r m (Pe r R e c . ) 18 " S t o r m (P e r R e c ) 10" Storm (Per Rec) 1 5 " S t o r m ( P e r R e c ) 10" S t o r m (Per R e c . ) Edge of Delineated Wetland 10' PARKIN G S E T B A C K 50' BUILD I N G S E T B A C K 10' PARKIN G S E T B A C K 50' BUILD I N G S E T B A C K 10 ' P A R K I N G S E T B A C K 20 ' B U I L D I N G S E T B A C K 10 ' P A R K I N G S E T B A C K 20 ' B U I L D I N G S E T B A C K 10' PARKING SETBAC K 25' BUILDING SETBAC K 10' PARKING SETBAC K 25' BUILDING SETBAC K DELINEATED WETLAND BOUNDARY EXISTING SECOND FLOOR PROPOSED SECOND FLOOR EXPANSION 8,050 SF NO PROPOSED CIVIL IMPROVEMENTS OUTSIDE OF SECOND STORY ADDITION. civilsitegroup.com COPYRIGHT CIVIL SITE GROUP INC.c PR O J E C T PRE L I M I N A R Y : NO T F O R CO N S T R U C T I O N 2023 ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION 5/21/2024 CITY SUBMITTAL 7/3/2024 CITY RESUBMITTAL 8/16/2024 CITY RESUBMITTAL DRAWN BY RB, AM REVIEWED BY MP PROJECT MANAGER MP PROJECT NUMBER 24004 WU N D E R L I C H - M A L E C B U I L D I N G E X P A N S I O N 61 0 1 B L U E C I R C L E D R I V E , E D E N P R A I R I E , M N 5 5 3 4 3 TW P A R C H I T E C T S 41 2 5 L A K E L A N D A V E N U E N # 2 0 0 , M I N N E A P O L I S , M N 5 5 4 2 2 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/16/2024 SITE LAYOUT NOTES: SITE PLAN LEGEND: PROPERTY LINE CITY OF EDEN PRAIRIE SITE SPECIFIC NOTES: 1.RESERVED FOR CITY SPECIFIC SITE NOTES. 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.CONTRACTOR SHALL VERIFY LOCATIONS AND LAYOUT OF ALL SITE ELEMENTS PRIOR TO BEGINNING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, LOCATIONS OF EXISTING AND PROPOSED PROPERTY LINES, EASEMENTS, SETBACKS, UTILITIES, BUILDINGS AND PAVEMENTS. CONTRACTOR IS RESPONSIBLE FOR FINAL LOCATIONS OF ALL ELEMENTS FOR THE SITE. ANY REVISIONS REQUIRED AFTER COMMENCEMENT OF CONSTRUCTION, DUE TO LOCATIONAL ADJUSTMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO OWNER. ADJUSTMENTS TO THE LAYOUT SHALL BE APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF MATERIALS. STAKE LAYOUT FOR APPROVAL. 3.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. 4.THE CONTRACTOR SHALL VERIFY RECOMMENDATIONS NOTED IN THE GEO TECHNICAL REPORT PRIOR TO INSTALLATION OF SITE IMPROVEMENT MATERIALS. 5.CONTRACTOR SHALL FIELD VERIFY COORDINATES AND LOCATION DIMENSIONS & ELEVATIONS OF THE BUILDING AND STAKE FOR REVIEW AND APPROVAL BY THE OWNERS REPRESENTATIVE PRIOR TO INSTALLATION OF FOOTING MATERIALS. 6.LOCATIONS OF STRUCTURES, ROADWAY PAVEMENTS, CURBS AND GUTTERS, BOLLARDS, AND WALKS ARE APPROXIMATE AND SHALL BE STAKED IN THE FIELD, PRIOR TO INSTALLATION, FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT. 7.FIELD VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS. 8.ALL TREES THAT ARE TO REMAIN ARE TO BE PROTECTED FROM DAMAGE WITH A CONSTRUCTION FENCE AT THE DRIP LINE. SEE LANDSCAPE DOCUMENTS. REVISION SUMMARY DATE DESCRIPTION C2.0 SITE PLAN 0 1" = 30'-0" 30'-0"15'-0" N Know what's below. before you dig.Call R OWNER INFORMATION WUNDERLICH PROPERTIES 2135 CARRIAGE LN WAYZATA, MN 55391 NEAL WUNDERLICH 612-802-9853 NEAL.WUNDERLICH@WMENG.COM PUD CONCEPT AND/OR SITE PLAN REVIEW REQUIREMENTS 1. Gross Floor Area including a breakdown of floor areas for types of use. a. Gross Sf: 56,475 sf; B occupancy: 26,580 sf; A occupancy: 4,355 (shared B and F); F-1(Manufacturing): 7,285 sf; S-2 (Warehouse): 18,255 sf 2. Building footprint. a. 38,940 sf 3. Base Area Ratio (BAR). a. (30% of site max 68,200 sf allowed). Actual 38,940 or 17% 4. Floor Area Ratio (FAR). a. (50% of site max 113, 668 allowed). Actual 56,475 or 25%. BAR is more restrictive 5. Density and units per acre. a. NA 6. Lot size. a. 227,384 sf 7. Average lot size. a. NA 8. Parking lot layout, calculation of total number of stalls based on building usage. a. If using square foot calculations, this addition would increase the required number of parking stalls to 187. We proposed to look at the requirements in terms of needs, rather than square footage. To avoid overparking and increased impervious surface and runoff, we have provided calculations based on the actual number of employees that would be expected to be on site during the week. By actual desks and manufacturing spots, there are 161 employees that could be expected to occupy the building. Since Covid, the business has instituted a nonoverlapping, three-day per week policy for office staff, and a five- days per week policy for manufacturing and warehouse. Considering this factor of 60% for office staff and 100% for manufacturing/warehouse, the required parking would be reduced to 108 stalls, well below the actual 136 existing stalls and able to accommodate all of the business’s needs. 9. Total site area by acreage and square footage. a. Acres: 5.22 Square feet: 227,384 10. Snow Storage Areas and Salt Storage Areas (if salt stored outside) a. No change—southwest corner of lot. 11. Setbacks and property lines, building configurations, and locations. a. Building: 50’, Parking 10’ 12. Sidewalk/trail alignment a. No change 13. Access to parcel. a. From BCD, no change. 14. Location of intersections, medians, and driveways within 250 feet of the property. a. No change. 15. Project phasing. a. Late autumn 2024-Spring 2025 16. Location of all structures within 250 feet of the property. 17. Floodplain areas, wetlands, lakes, wetland buffers, stormwater features, shoreland a. No change 18. Airport Zones (if applicable). Identify limits of JAZB zones A, B, or C. a. NA 19. Building material information by type per façade (square footage and percentage). a. 100% masonry 20. Parking lot calculations (percent of parking island area, sizes of islands, and dimensions of parking islands). a. Existing, no change. 21. Variances or PUD waivers requested (if applicable). a. PUD waiver to parking 22. Bluff areas and applicable bluff impact zones and setbacks as defined in City Code Section 11.50. (Shoreland Management) a. NA 23. See additional items that may be required for PUD Concept and Site Plan. a. NA PID: 0111622110011 Address: 6101 Blue Circle Drive PID: 0111622110003 Address: Unassigned Owner: City of Eden Prairie PID: 3611722440004 Address: Unassigned Owner: City of Minnetonka PI D : 0 1 1 1 6 2 2 1 2 0 0 1 1 Ad d r e s s : 6 1 3 1 B l u e C i r c l e D r i v e Ow n e r : A m e r i c a n F a m i l y M u t u a l I n s PID: 3611722440024 Address: 9705 Data Park Drive Owner: United Healthcare Services Access Bi t u m i n o u s Pa r k i n g L o t Bituminous Parking Lot Bituminous Parking Lot Bituminous Parking Lot Bituminous Parking Lot Bituminous Sidew a l k Bit u m i n o u s S i d e w a l k Concrete Co n c r e t e W a l k w a y Concrete Walkway Concrete Walkway Co n c r e t e Co n c r e t e Co n c r e t e Cattails Landscaping Pavers Ri p - R a p Rip - R a p Rip-Rap Pond Edge of Ice Pond Ed g e o f I c e Chain Link F e n c e Chain Lin k F e n c e Iron Fence Stone Retaining Wall BLUE CIRCLE DRIVE (A Public R/W) (Width Varies) C.S.A.H. N O . 6 2 (A Public R / W ) (Width Va r i e s ) Generator 4 3 8 6 9 4 9 10 11 1 28 31 S77°24'1 8 " W 4 7 2 . 1 5 N0 4 ° 3 5 ' 3 3 " E 47 0 . 1 8 C=171.04 CB=N83°28'05"E R=443.24 Δ=22°14'56" 172.12 S85°24'27"E 189.58 S0 1 ° 1 6 ' 3 3 " W 2 9 7 . 7 3 2 5 . 0 0 S1 2 ° 3 5 ' 4 2 " E S77°24'1 8 " W 1 4 3 . 9 8 20 . 4 2.90. 5 147.6 57 . 6 20.1 39 . 1 43.8 0. 4 4.9 4. 9 0.5 12 5 . 9 168.4 42 . 2 35.80. 54.84. 9 79 . 8 0.8 5. 0 4.9 0. 3 54.7 23 . 5 6 . 5 6. 3 6.0 15.1 20 . 5 0.5 23 . 0 0.3 2. 9 14.0 2 Story Brick Building Foundation area = 38,963 +/- Sq. Ft. 10" D I P ( P e r R e c . ) 10" DIP (Per Rec.) 36" C M P ( P e r R e c . ) 36" C M P (Per R e c . ) 30" RCP 30" RCP (Per Rec.) 24" RCP (Per Rec.)6" DI P F o r c e m a i n ( P e r R e c . ) 8" PVC (Per Rec.) Found 1/2 Inch Iron Pipe W/ Illegible Cap Found 1/2 Inch Iron Pipe W/ Illegible Cap Found CIM Found 1/2 Inch Open Iron Pipe Found Nail Fo u n d 1 / 2 I n c h I r o n Pip e W / I l l e g i b l e C a p Found 1/2 Inch Iron Pipe W/ Cap No. 15480 Corner Falls in Water. No Monument Found or Set. Th e E L i n e o f T h e W 4 5 F e e t o f L o t 1 , Blo c k 1 , O P U S l l 2 N D A D D I T I O N Drainage & Utility Easement Per Plat Landscaping Stone Retaining Wall S85°24'27"E 206.60 [A] Vacated Right of Way 8" Wat . S e r v . 133.78 13 2 . 7 2 16 5 . 0 1 S 1 7 ° 0 2 ' 4 1 " E 1 7 7 . 2 2 5 7 Loading Docks Concrete Retaining Wall EX C E P T I O N Th e W L i n e o f L o t 1 , B l o c k 1 , OP U S l l 2 N D A D D I T I O N 55.80 Survey Line 18" S t o r m (Per R e c ) 10" S t o r m (Pe r R e c . ) 18 " S t o r m (P e r R e c ) 10" Storm (Per Rec) 1 5 " S t o r m ( P e r R e c ) 10" S t o r m (Per R e c . ) 12" RCP Curb Cut DESCRIPTION OF PROPERTY SURVEYED Lot 1, Block 1 except that part thereof lying Westerly of a line drawn parallel with and 45 feet Easterly of the West line of said Lot 1 (measured at right angles to the West line of said Lot 1), Opus II 2nd Addition. Torrens Property GENERAL SURVEY NOTES 1.Bearings are based on the Hennepin County Coordinate System (1986 Adjustment). 2.Elevations are based on the NGVD 29 Datum. Site Benchmark is the top nut of the fire hydrant located on the east side of the bituminous parking lot, approximately 65 feet east of the northwest corner of the subject property, as shown hereon. Elevation = 929.54. 3.We have shown the location of utilities to the best of our ability based on observed evidence together with evidence from the following sources: plans obtained from utility companies, plans provided by client, markings by utility companies and other appropriate sources. We have used this information to develop a view of the underground utilities for this site. However, lacking excavation, the exact location of underground features cannot be accurately, completely and reliably depicted. Where additional or more detailed information is required, the client is advised that excavation may be necessary. Also, please note that seasonal conditions may inhibit our ability to visibly observe all the utilities located on the subject property. ALTA/NSPS LAND TITLE SURVEY NOTES (numbered per Table A) 1.Monuments placed and/or found at all major corners of the boundary of the surveyed property as shown hereon. 2.Site Address: 6101 Blue Circle Drive, Eden Prairie, Minnesota 55343. 3.This property is contained in Zone X (area determined to be outside the 0.2% annual chance floodplain) per Flood Insurance Rate Map, Community Panel No. 27053C0344F, effective date of November 4, 2016. 4.The Gross land area is 223,613 +/- square feet or 5.133 +/- acres. 7.(a) Exterior dimensions of buildings at ground level as shown hereon. 8.Substantial features observed in the process of conducting the fieldwork as shown hereon. Please note that seasonal conditions may inhibit our ability to visibly observed all site features located on the subject property. 9.The number of striped parking stalls on this site are as follows: 131 Regular + 5 Handicap = 136 Total Parking Stalls. 13.The names of the adjoining owners of the platted lands, as shown hereon, are based on information obtained from the Hennepin County Interactive Property Map. SURVEY REPORT 1.This map and report was prepared without the benefit of a Commitment for Title Insurance. The property description was obtained from the Hennepin County tax records and may not be the latest description of record. We have shown hereon the easements as shown on the plat of OPIS ll 2ND ADDITION only. There may be easements or other matters of record we are unaware of and thus not shown hereon. 2.Conflicts such as (but not limited to): encroachments, protrusions, access, occupation, and easements and/or servitudes: [A].Please note that the Hennepin County Interactive Property Map shows a road vacation on the northerly side of the subject property. Without being provided with a commitment for Title Insurance, it is unclear to us if the subject property has any claim of ownership of said vacated road. ALTA CERTIFICATION To: TWP Architects, PA: This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 7(a), 8, 9, and 13 of Table A thereof. The fieldwork was completed on 2-9-2024. Dated this 16th day of February, 2024. ________________________________________________________ Rory L. Synstelien Minnesota License No. 44565 rory@civilsitegroup.com VICINITY MAP 61 0 1 B l u e C i r c l e D r i v e Ed e n P r a i r i e , H e n n e p i n C o u n t y , M i n n e s o t a 5 5 3 4 3 41 2 5 L a k e l a n d A v e n u e N o r t h , # 2 0 0 , M i n n e a p o l i s , M i n n e s o t a 5 5 4 2 2 TW P A r c h i t e c t s , P A PR O J E C T PROJECT NO.: 24004.00 COPYRIGHT 2024 CIVIL SITE GROUP INC.c REVISION SUMMARY DATE DESCRIPTION V1.0 ALTA/NSPS LAND TITLE SURVEY 2-27-24 Rec. Storm Sewer 3-21-24 Added 2 Storm Structures 4-10-24 Added Trees .. .. .. N 44565 RORY L. SYNSTELIEN LICENSE NO.DATE I HEREBY CERTIFY THAT THIS SURVEY, PLAN, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA. 2-16-2024 N CL I E N T Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 QA/QC FIELD CREW DRAWN BY REVIEWED BY UPDATED BY DO DS CJ . OVERHEAD UTILITIES GASMAIN SANITARY SEWER STORM SEWER FIBER/COMM. LINE ELECTRIC LINE (RECORD) WATERMAIN ELECTRIC LINE GASMAIN (RECORD) CHAINLINK FENCELINE Linetype & Symbol Legend CONCRETE SURFACE PAVER SURFACE BITUMINOUS SURFACE GRAVEL/LANDSCAPE SURFACE WOODEN FENCELINE GUARDRAIL WATERMAIN (RECORD) SANITARY SEWER (RECORD) STORM SEWER (RECORD) FIBER/COMM. LINE (RECORD) TELEPHONE LINE (RECORD) TELEPHONE LINE SIGN SANITARY MANHOLE STORM MANHOLE CABLE TV BOX TELEPHONE MANHOLE ELECTRIC TRANSFORMER TELEPHONE BOX TRAFFIC SIGNAL GAS METER ELECTRICAL METER WATER MANHOLE WATER VALVE AIR CONDITIONER BOLLARD CATCH BASIN ELECTRIC MANHOLE GAS VALVE FLAG POLE HANDICAP SYMBOL FOUND IRON MONUMENT HYDRANT CAST IRON MONUMENT SET OR TO BE SET IRON MONUMENT FLARED END SECTION POWER POLE UTILITY MANHOLE GUY WIRE CONIFEROUS TREE DECIDUOUS TREE ROOF DRAIN SEWER CLEAN OUT FIRE CONNECTION WELL UTILITY VAULT POST INDICATOR VALVE GAS MANHOLE HAND HOLE FIBER/COMM. MANHOLE MAIL BOX FUEL TANK ELECTRICAL OUTLET SB SOIL BORING LIGHT POLE ACCESS RESTRICTION 80204002040 SCALE IN FEET 119 137 148VEST. STAIR 'B' UP E1 4 8 E1 3 4 B E1 0 7 C FD 127 135 137 13 8 148A 148B MA I L S L O T S 139 F.E.CABN'T F.E. F.E. W6 119 137 148VEST. STAIR 'B' UP E1 4 8 E1 3 4 B E1 0 7 C FD 127 135 137 13 8 148A 148B MA I L S L O T S 139 F.E.CABN'T F.E. F.E. W6 UP 219 DN ST A I R ' B ' 219 F.E.CABN'T DN DN WAREHOUSE / STORAGE 134 OFFICE 135 133 JAN. COMPUTER 137 MEN 138 IDF CABINET 139 A5.1 1 WOMEN'S 132 76 5 A3.1 STORAGE 156 A5.1 2 8 C C.2 C.8 D E F G H G.4 A5.1 3 6.2 A5.1 1 76 5 A3.1 A5.1 2 CONFERENCE OFFICE OFFICE 8 11 ' - 6 " 6' - 7"4' - 0 " 4' - 0 " 4' - 0 " 18' - 3" 11 ' - 7 " 17 ' - 3 " 7' - 1 " 5' - 0" 6' - 3" 4' - 6 " 4' - 0 " 42 CUBES RAMP EX SECOND FLOOR SECOND STORY EXPANSION 8,050 SF PRINT/COPY/PLAN BOTTLE FILLER MINI BREAK ROOM BU-11 LAV 3' - 1 1 " 6' - 6" C C.2 C.8 D E F G H G.4 STAIR STAIR A5.1 3 6.2 T.O. EXIST. MASONRY 121' -4" FIRST FLOOR 100' -0" SECOND FLOOR 116' -0" 76 JOIST BEARING 130' -0" TOP OF FOOTING 96' -0" T.O. MASONRY 133' -0" HEIGHT LIMIT 140' -0" 8 11 ' - 0 " 4' - 0 " 12 ' - 0 " 10 ' - 0 " PROPOSED SECOND FLOOR EXPANSION EXISTING OFFICE OFFICE EXISTING OFFICE EXISTING MANUFACTURING Print Name: Signature: Date: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. License #: NORTH Consultants Certification Sheet Information COPYRIGHT 2024, TWP ARCHITECTS Project Information Revisions Date: Drawn By: Checked By: Job Number: 4125 Lakeland Ave North Suite 200 Minneapolis, MN 55422 Phone: 763-533-7171 A3.1 EDEN PRAIRIE, MN 55343 6101 BLUE CIRCLE DRIVE FLOOR PLAN WUNDERLICH-MALEC EXPANSION E0624 AS DM 48079 AMY SCHWABE 08/15/24 3/32" = 1'-0"A3.1 1 FIRST FLOOR PLAN 3/32" = 1'-0"A3.1 2 SECOND FLOOR PLAN 3/32" = 1'-0"A3.1 5 PROPOSED SECTION 1" = 40'-0"A3.1 4 SECOND FLOOR KEY PLAN 1" = 40'-0"A3.1 3 FIRST FLOOR KEY PLAN WUNDERLICH-MALEC ADDITION FIRST FLOOR 100' -0" EXISTING ADDITION 76 T.O. EXIST. PARAPET 121' -10" PREFIN. METAL PARAPET CAP TO MATCH EXIST. BRICK TYPE '1' WINDOW SURROUND TO MATCH EXIST. BRONZE TINTED GLASS IN LIGHT BRONZE ANOD. ALUM. FRAME TO MATCH EXIST. T.O. MASONRY 133' -0" 86.2 BRICK TYPE '1' (TAN) TO MATCH EXIST. BRICK TYPE '2' (RED) TO MATCH EXIST. FIRST FLOOR 100' -0" SECOND FLOOR 116' -0" 5 A3.1 T.O. EXIST. PARAPET 121' -10" T.O. MASONRY 133' -0" CC.2C.8DEFGHG.4 EXISTING ADDITION PREFIN. METAL PARAPET CAP TO MATCH EXIST. BRICK TYPE '2' (RED) TO MATCH EXIST. BRICK TYPE '1' WINDOW SURROUND TO MATCH EXIST. BRONZE TINTED GLASS IN LIGHT BRONZE ANOD. ALUM. FRAME TO MATCH EXIST. BRICK TYPE '1' (TAN) TO MATCH EXIST. FIRST FLOOR 100' -0" SECOND FLOOR 116' -0" 7 6 T.O. EXIST. PARAPET 121' -10" T.O. MASONRY 133' -0" 8 6.2 EXIST. SECOND FLR 114' -4" EXISTING ADDITION PREFIN. METAL PARAPET CAP TO MATCH EXIST. BRICK TYPE '1' (TAN) TO MATCH EXIST. BRICK TYPE '2' (RED) TO MATCH EXIST. Print Name: Signature: Date: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. License #: Consultants Certification Sheet Information COPYRIGHT 2024, TWP ARCHITECTS Project Information Revisions Date: Drawn By: Checked By: Job Number: GENERAL CONTRACTOR: 4125 Lakeland Ave North Suite 200 Minneapolis, MN 55422 Phone: 763-533-7171 A5.1 EDEN PRAIRIE, MN 55343 6101 BLUE CIRCLE DRIVE EXTERIOR ELEVATIONS WUNDERLICH-MALEC EXPANSION E0624 AS DM 48079 AMY SCHWABE 08/15/24 1/8" = 1'-0"A5.1 1 SOUTH ELEVATION 1/8" = 1'-0"A5.1 2 EAST ELEVATION 1/8" = 1'-0"A5.1 3 NORTH ELEVATION 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.1 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.3 0.2 0.3 0.3 0.4 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.5 0.0 0.5 0.5 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.4 0.4 0.4 0.4 0.0 0.5 0.4 0.4 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.6 0.8 0.8 0.7 0.8 0.7 0.7 0.9 0.7 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.5 0.6 0.8 1.0 1.3 1.5 1.6 1.5 1.4 1.1 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.3 0.4 0.5 0.7 0.8 1.0 1.3 1.6 1.9 2.0 2.0 1.7 1.4 1.1 0.9 0.8 0.6 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.3 0.4 0.6 0.7 0.9 1.0 1.3 1.5 1.6 1.6 1.7 1.6 1.4 1.1 0.9 0.8 0.7 0.5 0.4 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.5 0.6 0.7 0.9 1.0 1.2 1.4 1.4 1.4 1.4 1.4 1.3 1.1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.2 0.2 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.4 0.6 0.7 0.9 1.1 1.2 1.3 1.2 1.1 1.2 1.3 1.3 1.1 1.0 0.8 0.7 0.6 0.5 0.5 0.4 0.3 0.3 0.2 0.2 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.3 0.4 0.5 0.7 0.9 1.1 1.2 1.2 1.1 1.0 1.1 1.2 1.3 1.2 1.0 0.8 0.7 0.6 0.6 0.6 0.5 0.5 0.4 0.3 0.4 0.4 0.4 0.3 0.3 0.2 0.2 0.3 0.3 0.3 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.3 0.3 0.5 0.6 0.8 0.9 1.1 1.1 1.1 0.6 1.1 1.1 1.1 1.0 0.9 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.4 0.3 0.2 0.2 0.3 0.3 0.4 0.5 0.5 0.4 0.4 0.5 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.5 0.7 0.8 0.8 0.8 0.9 0.9 0.9 0.8 0.8 0.8 0.7 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.4 0.4 0.3 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.5 0.4 0.4 0.4 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.5 0.6 0.8 1.1 1.1 1.0 1.1 1.0 1.0 1.2 1.0 0.8 0.6 0.6 0.6 0.7 0.9 1.0 0.8 0.8 0.8 0.7 0.8 0.8 0.6 0.4 0.3 0.3 0.4 0.6 0.8 0.8 0.7 0.7 0.7 0.6 0.8 0.7 0.5 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.6 0.7 0.9 1.0 1.2 1.5 1.7 1.9 1.8 1.6 1.4 1.2 1.1 1.1 1.0 1.0 1.1 1.2 1.5 1.6 1.7 1.7 1.6 1.5 1.1 1.0 0.9 0.8 0.8 0.9 0.9 1.1 1.4 1.5 1.6 1.6 1.5 1.3 0.9 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.5 0.6 0.8 1.0 1.2 1.4 1.7 2.1 2.2 2.2 1.9 1.6 1.4 1.3 1.3 1.3 1.3 1.4 1.5 1.8 2.1 2.3 2.2 2.1 1.7 1.5 1.3 1.3 1.3 1.3 1.3 1.4 1.6 1.8 2.1 2.3 2.2 2.0 1.6 1.3 1.0 0.9 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.5 0.7 0.9 1.0 1.2 1.5 1.7 1.8 1.8 1.8 1.8 1.6 1.4 1.3 1.3 1.3 1.4 1.4 1.6 1.9 2.0 2.0 1.9 1.9 1.9 1.7 1.5 1.5 1.6 1.6 1.6 1.7 1.9 2.1 2.2 2.2 2.1 2.0 1.7 1.4 1.1 1.0 0.8 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.5 0.7 0.9 1.1 1.2 1.4 1.6 1.6 1.5 1.6 1.6 1.5 1.3 1.2 1.2 1.3 1.3 1.4 1.6 1.8 1.9 1.9 1.7 1.8 1.9 1.8 1.7 1.7 1.8 1.9 2.0 2.0 2.1 2.3 2.4 2.2 2.1 2.0 1.8 1.5 1.2 1.0 0.8 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4 0.6 0.9 1.1 1.3 1.4 1.4 1.3 1.3 1.3 1.3 1.3 1.2 1.1 1.1 1.2 1.3 1.4 1.6 1.7 1.8 1.7 1.5 1.6 1.8 1.9 2.0 2.0 2.1 2.3 2.4 2.3 2.4 2.5 2.5 2.3 2.1 2.0 2.0 1.7 1.3 1.0 0.8 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.6 0.9 1.2 1.3 1.4 1.3 1.2 1.1 1.1 1.1 1.1 1.1 1.0 1.0 1.0 1.2 1.3 1.5 1.6 1.6 1.6 1.3 1.4 1.7 2.0 2.3 2.3 2.4 2.6 2.7 2.8 2.8 2.8 2.6 2.5 2.3 2.2 2.0 1.7 1.3 1.1 0.9 0.6 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4 0.6 1.0 1.2 1.3 1.2 1.1 1.1 1.0 0.9 0.8 0.8 0.9 0.9 0.8 0.9 1.0 1.2 1.4 1.5 1.6 1.6 1.1 1.2 1.5 1.8 2.4 2.6 2.8 2.9 3.2 3.1 3.1 2.9 2.8 2.6 2.5 2.3 2.1 1.6 1.3 1.0 0.8 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.5 0.7 1.0 1.2 1.2 1.1 1.0 1.0 0.9 0.8 0.6 0.6 0.6 0.6 0.7 0.7 0.8 1.0 1.2 1.4 1.8 1.7 0.9 1.0 1.2 1.5 2.0 2.7 2.9 2.7 2.7 3.1 3.1 2.5 2.2 2.4 2.6 2.3 1.6 1.3 1.1 0.9 0.7 0.5 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.6 0.8 1.1 1.2 1.2 1.1 1.1 1.0 0.8 0.6 0.5 0.4 0.4 0.5 0.5 0.5 0.6 0.8 1.0 1.3 1.6 1.9 0.5 0.5 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.6 1.1 1.2 1.4 1.3 1.2 1.1 1.0 0.7 0.5 0.4 0.3 0.3 0.3 0.3 0.4 0.5 0.6 0.9 1.2 1.5 1.9 0.5 0.5 0.4 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5 1.2 1.4 1.6 1.5 1.3 1.1 0.9 0.6 0.5 0.3 0.3 0.2 0.2 0.3 0.3 0.4 0.5 0.8 1.1 1.4 1.3 0.5 0.5 0.4 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.6 1.1 1.7 1.9 1.7 1.4 1.1 0.9 0.7 0.5 0.4 0.3 0.3 0.2 0.2 0.3 0.3 0.5 0.8 1.0 1.3 1.0 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.2 1.9 2.0 1.7 1.4 1.2 1.0 0.8 0.6 0.5 0.4 0.3 0.3 0.3 0.3 0.3 0.1 1.0 0.9 0.7 0.5 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.6 1.2 1.9 2.1 1.9 1.6 1.4 1.2 0.9 0.8 0.6 0.6 0.5 0.4 0.3 0.3 0.2 0.2 1.2 1.1 0.7 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.6 1.2 1.7 2.1 2.0 1.8 1.6 1.4 1.1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.2 1.4 1.2 0.7 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.6 1.3 1.6 1.9 2.0 1.9 1.9 1.6 1.3 1.1 1.0 0.9 0.7 0.6 0.5 0.3 0.2 0.2 1.2 1.1 0.7 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.7 1.1 1.4 1.7 1.9 1.9 2.0 1.8 1.6 1.4 1.2 1.0 0.8 0.7 0.6 0.4 0.3 0.2 0.9 0.9 0.6 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.6 0.8 1.4 1.7 1.8 1.9 1.9 1.9 1.8 1.6 1.3 1.1 1.0 0.8 0.7 0.5 0.3 0.3 0.7 0.6 0.5 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.7 1.3 1.7 1.9 1.9 1.9 1.9 1.7 1.6 1.4 1.2 1.1 0.9 0.7 0.5 0.3 0.3 0.5 0.4 0.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.7 1.1 1.5 1.9 2.0 1.9 1.7 1.6 1.5 1.4 1.4 1.2 0.9 0.7 0.5 0.3 0.2 0.3 0.4 0.3 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.6 1.0 1.5 1.9 1.0 0.9 1.7 1.6 1.5 1.4 1.4 1.2 0.9 0.7 0.5 0.3 0.2 0.2 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.6 1.0 1.4 1.9 2.1 2.0 1.8 1.7 1.6 1.5 1.5 1.3 1.0 0.9 0.8 0.7 0.8 1.0 1.3 1.6 1.4 1.2 2.9 2.9 2.5 1.7 1.1 0.9 0.6 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.7 1.1 1.5 2.0 2.1 2.0 1.9 1.8 1.7 1.5 1.4 1.3 1.1 1.0 0.8 0.8 0.8 1.0 1.3 1.4 1.4 1.2 2.9 2.8 2.2 1.7 1.2 0.8 0.6 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.6 0.8 1.2 1.6 1.9 2.1 2.1 2.1 2.0 1.9 1.6 1.3 1.2 1.0 0.9 0.8 0.7 0.7 0.8 0.8 0.8 1.0 2.6 2.3 1.7 1.3 0.9 0.6 0.4 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.7 0.8 1.1 1.8 2.1 2.3 2.3 2.2 2.0 1.8 1.5 1.2 1.0 0.9 0.8 0.7 0.6 0.6 0.6 0.5 0.6 0.6 2.3 1.9 1.3 0.9 0.7 0.5 0.3 0.3 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.6 0.7 0.9 1.9 2.2 2.4 2.3 2.1 1.8 1.5 1.4 1.1 0.9 0.8 0.6 0.5 0.5 0.4 0.4 0.3 0.8 0.7 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.6 0.9 1.7 2.4 2.4 2.2 1.8 1.5 1.3 1.2 1.0 0.8 0.6 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.4 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.2 0.2 0.3 2.3 2.2 1.9 1.6 1.3 1.2 1.0 0.8 0.6 0.5 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.5 0.7 1.4 2.0 2.0 1.8 1.4 1.2 1.0 0.8 0.6 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.5 0.6 1.4 1.6 1.7 1.6 1.3 1.1 0.8 0.6 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.5 0.4 0.6 1.1 1.3 1.4 1.3 1.1 1.0 0.8 0.6 0.4 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.3 0.5 0.7 1.0 1.0 1.0 0.9 0.9 0.8 0.5 0.4 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.2 0.3 0.5 0.8 0.8 0.8 0.8 0.7 0.6 0.5 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.2 0.4 0.6 0.7 0.7 0.6 0.6 0.5 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.3 0.5 0.6 0.5 0.5 0.5 0.4 0.3 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.4 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc1 fc 1 fc 1 fc 1 fc1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 1 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.5 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc 0.4 fc AA AA BB BB +20'+20'+20' AA AA AA AA AABB BB BBBB BB +20' +20'+20' +20' AA +20' LIGHT FIXTURE SCHEDULE FIXTURE LETTER TYPE FIXTURE DESCRIPTION VOLT LED MOUNTING LAMP INITIAL LUMENS WATTAGE LUMENS PER WATT CRI CONTROL MEDIA MANUFACTURER'S CATALOG NUMBERS REMARKS AA WALL PACK MV X RECESSED WALL 4000K LED 5454 47 116 70 TYPE 3M DISTRIBUTION, DARK BRONZE FINISH LITHONIA DSXW1 LED 20C 700 40K T3M MVOLT DDBXD BB AREA LIGHT MV X 30' POLE 4000K LED 19480 135 145 70 TYPE 3M DISTRIBUTION, DARK BRONZE FINISH LITHONIA DSX2 LED P1 40K T3M MVOLT SPA DDBXD LITHONIA SSS 30 6G DM19AS VD DDBXD WU N D E R L I C H PR O P E R T I E S , L L C C NO . D A T E R E V I S I O N 1124WME CO P Y R I G H T 2 0 2 4 I H E R E B Y C E R T I F Y T H A T T H I S P L A N WA S P R E P A R E D B Y M E O R U N D E R M Y DIR E C T S U P E R V I S I O N A N D T H A T I A M A D U L Y L I C E N S E D E N G I N E E R U N D E R TH E L A W S O F T H E S T A T E O F M I N N E S O T A PR I N T N A M E : SI G N A T U R E : DA T E : R E G . N O . BU I L D I N G E X P A N S I O N 61 0 1 B l u e C i r c l e D r i v e , E d e n P r a i r i e , M i n n e s o t a 08/13/24 NORTH 08 / 1 3 / 2 4 Wu n d e r l i c h - M a l e c En g i n e e r i n g | S y s t e m s | S e r v i c e s 55 0 1 F e l t l R o a d , M i n n e t o n k a , M N 5 5 3 4 3 P h o n e ( 9 5 2 ) 9 3 3 - 3 2 2 2 F a x ( 9 5 2 ) 9 3 3 - 0 6 0 8 IS S U E F O R R E V I E W 1 08 / 1 3 / 2 0 2 4 . 2 . 3 . SI T E P L A N - P H O T O M E T R I C PE1 EXISTING WALL MOUNTED LIGHT FIXTURE. EXISTING POLE MOUNTED LIGHT FIXTURE. NEW WALL MOUNTED LIGHT FIXTURE FOR BUILDING ADDITION. SPECIFIC NOTES 1 2 1 1 1 1 1 1 1 222 2 2 2 2 3 3 6101 Blue Circle Drive •Wunderlich-Malec (WM) is an engineering and fabrication company, founded in Minnesota in 1981. •There was one employee in 1981 and in 2024 there are now more than 600 employees, located in 35 cities and 24 states. •Although HQ has always been in MN,Eden Prairie is the WM corporate headquarters since 2015 with the purchase of 6101 Blue Circle Drive. •The company provides engineering services, fabrication of industrial control panels and modular e-houses, along with subcontracted services from electrical and mechanical contractors. Wunderlich-Malec as a company does about 20% of its revenue in the life science industries, including key pharmaceutical manufacturers. •Other major vertical markets include the power and utility grid for the country, high-tech work including semiconductor and data centers, and food manufacturing for several Minnesota-based companies. •The company has outgrown its production space for fabrication with the increased demand for manufacturing automation among its core customers. •An expansion would give WM the extra space it needs to serve its customers in a timely fashion. The fabrication can only be done in-house and WM has concluded that an expansion in the Eden Prairie location is the best solution to provide the required space to meet customer needs and keep critical employees working together under one roof. •This expansion will not increase the building footprint. It will go up, over the manufacturing /warehouse space to create a second story office space to house the engineers that work with the manufacturing group. Site entry Parking Existing Building Green Green Existing Building: 48,425 SF Site: 5+ Acres Bldg entry Parking Parking Whse entry Existing landscaping can support a building size of 731,000 SQUARE FEET PROPOSED SECOND STORY EXPANSION 8,050 SF Zoning •Total building square footage with proposed expansion is 56,475. •Exterior materials will match existing masonry. •Floor area ratio. Max 50%. The proposed building is less than 25%. •Office use is less than 50% of total gross square footage. •40’ height limitation. Proposed addition height is 33’. •Landscaping requirements for building square footage, one caliper inch per 320 square feet. The existing landscaping is enough to accommodate 731,000 square feet of building. •Parking calculations based on square foot and occupant use require the project to have 187 parking stalls. Development •1993 Developer Agreement approved 50,550 sf with a future expansion footprint of 20,000 sf. •The addition would have taken out existing trees and replace them with new. •A parking deck over the west lot would accommodate the lost parking spots. •Original parking lot was only built to 98 stalls. Parking •2019 current Owner added 38 stalls and built south end of parking lot as original plans had shown. It is used for snow storage. Current site has 136 stalls. •Requesting a parking waiver to this project. •A traffic memo was completed and concluded that this expansion would have no impact on intersections or nearby roadways. PUD Parking Waiver •Existing actual # of parking stalls: 136 •Stalls required by existing SF: 167 •Stalls required by proposed SF: 187 •Actual occupants by workspace: 161 •Actual occupants with work from home: 108 Summary •The project at 8,050 sf is a less intensive development of the site than the approved 20,000 sf expansion of 1993. The approved agreement did not specify height or story limitations for the addition. •The proposed expansion is well within the 40’ height limitation. •The 1993 agreement contemplated and accepted tree loss. This project contemplates no tree loss. •The project requests a PUD waiver to allow for fewer parking stalls than indicated by zoning requirements. •The project is not expected to impact intersection or roadway operations. •Exterior façade materials on the proposed expansion shall be consistent with the existing building. 6101 Blue Circle Drive BACKGROUND Costco Wholesale received City Council approval to construct a four (4) pump fuel facility expansion in January 2020, though the project never occurred. Costco is requesting a Site Plan Review and a PUD Concept Review and Amendment with waivers to construct a seven (7) pump expansion, equating to 14 vehicle pump stations, in lieu of the current approval. Four (4) of the pumps are in previously approved locations, and three (3) more are proposed on the east side of the fuel facility, creating another row of pumps. This property received Site Plan and Planned Unit Development (PUD) approvals in 2003 for its current site layout. The existing fuel facility located on the north portion of the property has eight (8) pump dispensers, equating to 16 vehicle pump stations. COMPREHENSIVE PLAN AND ZONING The Comprehensive Guide Plan guides the property for Transit-Oriented Development (TOD). The property is zoned Commercial Regional Service. SITE PLAN This Site Plan review is for an expansion of the existing fuel facility and related modifications around the fuel facility. The applicant is requesting to add seven (7) new pump dispensers that equates to 14 additional vehicle pump stations. If approved, the site will contain 15 pump dispensers and 30 vehicle TO: Planning Commission FROM: Sarah Strain, Planner II DATE: September 9, 2024 SUBJECT: Costco Fuel Facility Expansion LOCATION: 12011 Technology Drive APPLICANT: Barghausen Consulting Engineers, Inc. on behalf of Costco Wholesale REQUESTS: Planned Unit Development Concept Plan Review on 18 acres Planned Unit Development District Amendment with Waivers on 18 acres Site Plan Review on 18 acres 120-DAY REVIEW PERIOD December 4, 2024 Staff Report – Costco Fuel Facility Expansion September 9, 2024 Page 2 2 pump stations. The existing pumps are highlighted in red in the image below, and the proposed pumps are outlined in blue. A new 30,000-gallon underground gasoline storage tank is proposed on the northeast side of the fueling canopy, shown in the image to the right outlined in yellow. A new controller station with a restroom will also be added to the west side of the fuel facility, outlined in the image to the right in green. PLANNED UNIT DEVELOPMENT WAIVERS The purpose of a Planned Unit Development (PUD) as stated in the City Code is to provide for a more creative and efficient approach to the use of land within the City; to allow variety in the types of environment available to people and distribution of overall density of population and intensity of land use where desirable and feasible; and provide for greater creativity and flexibility in environmental design. The applicant is requesting the following waivers: The following waiver is requested as part of this project: A. Driveway Width at the Property Line As part of the January 2020 approval, Costco received a PUD waiver for driveway width at the property line for both entrances to better accommodate traffic and truck turning movements. The western entrance is maintaining the previously approved design. However, the eastern entrance requires changes from the approved width due to the new site plan with additional pumps and is proposed to exceed the width of the previously granted waiver. The current waiver allows the eastern driveway to be 37 feet wide. The proposed site plan shows a 46 foot width. This waiver is in harmony with the general purposes and intent of the ordinance. This waiver is consistent with the commercial character of the area and is a reasonable use of the property due to truck traffic the site receives and the wide Staff Report – Costco Fuel Facility Expansion September 9, 2024 Page 3 3 turning movements necessary for the trucks. ACCESS AND STREET CONNECTIONS There have been recent roadway improvements on Technology Drive that are connected to Costco shown in the image below. There is a temporary traffic signal at the western entrance to the site. The temporary traffic signal will need to become a permanent traffic signal in the future. The development agreement will include language to address the timing of installation and developer cost responsibility. The western entrance to the site was widened, which was approved in 2020. As part of this proposed project, the eastern entrance will be widened to better accommodate truck turning movements. Widening this curb at the property line will require a PUD waiver. A mountable curb median will be installed at the entrance to provide separation between incoming and outgoing vehicles. TRAFFIC STUDY A traffic study was prepared to determine if the proposed site plan better accommodates the current and anticipated number of fuel related trips. Even with number of trips at the fuel station is expected to increase as a result of the expansion, the study found that peak queues and wait times are reduced, due to the improved efficiency and capacity of the fuel facility. PARKING The proposed site plan will result in a loss of 16 parking stalls that are currently on the east and west sides of the gas area. This loss in parking is compliant with City Code parking requirements for the site and previous site plan approvals. After the changes, the site will have 758 parking stalls, exceeding City Code requirements. SIDEWALKS There is an existing sidewalk along the south side of Technology Drive. The western entrance has new, ADA compliant pedestrian ramps and a crosswalk. The ramps at the eastern entrance will be improved to be ADA compliant as part of this project. Staff Report – Costco Fuel Facility Expansion September 9, 2024 Page 4 4 BUILDING ARCHITECTURE AND MATERIALS To cover the new fuel pumps, the fuel facility canopy will expand and architecturally match the existing structure with brick-wrapped columns, shown in the following image. SHORELAND The subject property is located in the City’s Shoreland Overlay District, as it is within 1,000 feet of Lake Idlewild. When Costco was originally reviewed and approved in 2003, a waiver to exceed the impervious surface coverage was granted. The PUD waiver granted allows the site to be up to 77 percent impervious. The proposed project will keep the site’s overall impervious surface coverage below the permitted 77 percent. DRAINAGE/STORMWATER MANAGEMENT The stormwater plan meets City requirements and Riley-Purgatory Bluff Creek Watershed District requirements. Infiltration is not possible at this site due to MPCA regulations related to fuel facilities and stormwater management. LANDSCAPING AND TREE REPLACEMENT PLAN There will be no significant or heritage trees removed as part of the proposed work. The existing landscape island to the east of the fuel facility will be removed and replaced with a landscaping island located slightly closer to the fuel facility. This will accommodate truck turning movements and provide additional space at the eastern entrance/exit of the site. Removed trees will be replaced in site in a one-for-one basis to maintain compliance with the existing landscaping plan. SIGNS The proposed signage is comparable to the existing signage on the fuel facility. Signage will be permitted administratively through a separate application. LIGHTING The under-canopy lights are currently LED. The new canopy lights will also be LED. The new light pole fixtures and illumination are compliant with City Code. STAFF RECOMMENDATION Staff Report – Costco Fuel Facility Expansion September 9, 2024 Page 5 5 Staff recommends approval of the following request: • Planned Unit Development Concept Review on 18 acres • Planned Unit Development District Amendment with waivers on 18 acres • Site Plan Review on 18 acres This is based on plans dated August 25, 2023 and August 29, 2024, the staff report dated September 9, 2024, and the Conditions of Approval outlined in the following section. CONDITIONS OF APPROVAL This is based on plans dated August 25, 2023 and August 29, 2024 and the following conditions: 1. Prior to land alteration permit issuance, the applicant must: A. Obtain permits and approvals from other agencies as needed. B. Obtain City approval of a final grading and drainage plan for the property. C. Submit detailed utility and erosion control plans for review and approval by the City Engineer. D. Obtain and provide documentation of Watershed District approval. E. Notify the City and Watershed District 48 hours in advance of grading. F. Provide a construction grading limits and tree protection plan for review and approval by the City. G. Install erosion control at the grading limits of the property for review and approval by the City. H. Install fencing at the construction grading limits and tree protection areas as shown on the approved plans. I. Submit and receive written approval of an executed landscape agreement. J. Submit a landscaping letter of credit or escrow equivalent to 150% of the cost of the landscaping. K. Submit a land alteration bond, letter of credit, or escrow surety equivalent to 125% of the cost of the land alteration. 2. The following waivers are granted through the PUD for the project as indicated in the plans dated August 25, 2023 and August 29, 2024. A. Driveway Width at the Property Line This property currently has a waiver to allow the eastern driveway to be 37 feet wide at the property line. The proposed site plan shows a 46-foot width at the property line. 3. Prior to issuance of an Occupancy Permit, the applicant must: A. Complete implementation of the lighting plan in Exhibit B. B. Complete implementation of the approved exterior materials and colors plan. PROJECT NARRATIVE MINOR SITE PLAN AND ARCHITECTURAL DESIGN REVIEW AND PLANNED UNIT DEVELOPMENT AMENDMENT PREPARED BY Costco Wholesale Fueling Facility Expansion Barghausen Consulting Engineers, Inc. PREPARED FOR CLIENT ADDRESS Costco Wholesale 730 Lake Drive Issaquah, Washington 98027 SITE ADDRESS JURISDICTION DATE PROJECT NO. 12011 Technology Drive Eden Prairie, MN 55344 CW No. 18-0662 Costco Loc. No. 783 APN No. 14-116-22-22- 0008 07/12/2024 10821 - 2 - 10821.014-Project Narrative.docx The project site for the fuel facility expansion includes the landscape planter and adjacent parking area along the east edge of the existing fuel facility, the existing queue area, the western edge of the fuel facility and the existing eastern driveway to Technology Drive. The overall project disturbance area is approximately 34,730 square feet. The Costco Wholesale (Costco) property is zoned Regional Service Commercial (C-Reg-Ser) in which the fuel facility is allowed as an accessory use to the main Costco warehouse. The subject site is bordered to the north by Technology Drive right-of-way, to the west by office uses, to the east by industrial uses, and to the south by retail uses. The existing fuel facility was previously approved under Planned Unit Development and Site Plan Review No. 2003-0012. The expansion is compliant with the previous Planned Unit Development and Site Plan Review approvals. Project Description: Overview Costco is seeking a Minor Site Plan and Architectural Design Review and Planned Unit Development Amendment to allow for an expansion of the existing fuel facility. The project includes a 5,361 square-foot expansion of the existing canopy (9,203 square feet total), the installation of seven (7) new multi-product dispensers, installation of one (1) 30,000-gallon underground gasoline storage tank (UST), a remote fill system, a new controller enclosure, and associated site improvements. Specific site improvements include directional ground painting, landscaping, and the widening of the existing eastern driveway to Technology Drive. Costco is also requesting a driveway width waiver for the existing eastern driveway to Technology Drive. The driveway will be widened to approximately 46 feet at the property line and will exceed City maximum driveway width standards by approximately 15 feet. The widened driveway will improve internal and external site circulation and provide a buffer between vehicles entering and exiting the site. Please see the enclosed Trip Generation and Queueing Summary Memo prepared by Kittelson & Associates, Inc. for further information. Grading Site grading will be limited to the installation of canopy footings, product piping, the underground storage tank, and stormwater improvements. Parking and Circulation The project will remove 16 parking stalls, for an overall total of 758 parking stalls for the Costco site. City parking standards require a minimum of 4.5 parking stalls for every 1,000 square feet of gross floor area for general retail uses and the initial PUD requires a minimum of 736 stalls for the overall site. The existing warehouse measures 144,626 square feet in size and, therefore, a minimum of 650 stalls is required for the Costco site. Off-street parking for the Costco development will continue to meet the City's minimum parking requirements after the fueling facility is expanded. The fuel facility will continue to provide single-direction circulation with a full-length bypass lane between each dispenser island. To facilitate circulation into and out of the center fueling position, the design has incorporated an additional seven (7) feet of maneuvering space between the center and front dispensers. The existing eastern driveway to Technology Drive will be widened to approximately 46 feet and will include one (1) entrance lane, two (2) exit lanes, a 3-foot median, and new striping. The widened driveway will allow the site to maintain a 2-lane exit onto Technology Drive, provide a buffer between the entrance and exit lanes, and improve on-site and off-site circulation. Please see the enclosed Trip Generation and Queueing Summary Memo prepared by Kittelson & Associates, Inc. for further information. Transportation The expansion is not anticipated to generate a significant number of new trips and it will provide a more efficient fuel-purchasing experience for Costco members. Please see the attached Trip Generation and - 3 - 10821.014-Project Narrative.docx Queueing Summary prepared by Kittelson & Associates, Inc. dated April 19, 2023 for additional information. Architectural Design The canopy expansion is designed to match the existing structure and includes a metal-wrapped canopy fascia and brick-wrapped canopy columns in two (2) orientations and three (3) color variations. The new controller enclosure will match the design of the existing controller enclosure and includes a brick exterior in two (2) orientations and three (3) color variations. City design standards require the fuel facility to be designed consistent with the design of the main structure. The fuel facility will continue to meet City design standards after the fuel facility is expanded. Lighting and Signage The under-canopy lighting will continue to be LED lighting for the existing canopy and expansion. Sign lighting will also be LED. The existing canopy signs are approximately 27 square feet in size and will be replaced with new 20-square-foot "Costco Wholesale" signs located and centered on each façade of the canopy. Landscaping The project will remove approximately 814 square feet of landscape area, for an overall total of approximately 8.2 percent of interior landscape coverage for the Costco development. City landscape standards require a minimum of 5 percent of the parking area to be landscaped. The site will continue to meet City minimum landscape requirements after the fueling facility is expanded. Construction Construction of the expansion will be completed in a single phase and commence after approval of the applicable permits. Depending on construction sequencing, the existing fuel facility may remain open during construction. Green Infrastructure Analysis The project disturbance area is approximately 34,730 square feet (less than one (1) acre) in size and the project is located within an existing developed site. The existing site does not contain any natural features to our knowledge and the project is not anticipated to impact any off-site natural areas such as natural vegetation, critical areas, or critical area buffers as they do not exist nearby. The project will also not modify any existing site drainage patterns and, therefore, will not impact any upland facilities. Lastly, due to the existing developed condition of the site, it is not feasible to direct sheet flow to vegetated areas and the project will modify the existing stormwater conveyance system to the extent necessary to address Watershed District Rules. Shoreland Review The expanded canopy will be located approximately 925 feet from Lake Idlewild to the east. The project will add approximately 0.1 percent of impervious surface area for an overall total of approximately 74.6 percent for the site. PUD2003-0012 included a waiver to allow a maximum impervious surface area of 77 percent for the Costco site. The site will continue to meet the PUD waiver shoreland requirements after the fueling facility is expanded. Development Review Application Checklist: Pursuant to City staff, a response to the City's Project Narrative submittal checklist is required. Please see the table below for the submittal checklist requirement and associated responses. Checklist Requirement Response General description of the request or proposal Please see the Overview Section above City Guide Plan framework Transit Oriented Development (TOD) - 4 - 10821.014-Project Narrative.docx Zoning Classification Regional Service Commercial (C-Reg-Ser) Variances or PUD waivers requested A PUD waiver is requested to widen the existing eastern driveway off of Technology Drive to approximately 46 feet. Existing and proposed land uses of project site and adjacent properties Existing Land Use - Costco Fuel Facility Proposed Land Use - Same as existing The subject site is bordered to the north by the Technology Drive right-of-way, to the west by office uses, to the east by industrial uses, and to the south by retail uses. The project does not modify the land uses of the subject property or adjacent properties. List of sustainability components, elements, and features Costco has a robust sustainability program that they utilize for each site, including a waste diversion and recycling program and the use of LED lighting for the fuel facility. The under-canopy lighting will continue to be LED lighting for the existing canopy and expansion to reduce the site's energy use. In addition, sign lighting will also continue to be LED. Phasing and construction schedule Please see the Construction Section above. Development method The site is owner occupied. Legal instruments, association documents, easements, covenants, and restrictions Please see the enclosed Title Report. The expansion is compliant with all Title elements and does not conflict with any easements. Housing or land/building use profile (i.e. square foot of building, site area, Floor Area Ratio, Base Area Ratio, amount of parking, etc.) Site Area: 18.104 acres/788,608 square feet Existing Canopy Area: 3,842 square feet New Canopy Area: 9,203 square feet Existing Canopy BAR: .005 New Canopy BAR: .012 The expansion will not impact the FAR for the site; however, the BAR for the site will increase by approximately .007. Signage (location, sizes, materials, and details) Please see the Signage Section above. Lighting (locations, type, and height) including photometric information Please see the Lighting Section above. Transportation capacity, impacts, Average Daily Trips, trip distributions, p.m. peak hour movements, and sight lines at access points to public roads. Please see the enclosed Trip Generation and Queueing Summary provided by Kittelson & Associates, Inc. dated April 19, 2023. - 5 - 10821.014-Project Narrative.docx Level 1 Environmental Assessment In consultation with City staff, this information is not applicable due to the project scope. Environmental Assessment Worksheet or Environmental Impact Statement In consultation with City staff, this information is not applicable due to the project scope. Shore land Ordinance/ Floodplain Restrictions City shoreland standards contain a maximum impervious surface area of 30 percent; however, PUD2003-0012 for the site included a waiver to allow a maximum impervious surface area of 77 percent for the Costco site. The expansion will add approximately 0.1 percent of impervious surface area for an overall total of approximately 74.6 percent for the site. Airport Zones The site is not located within an airport zone. Disposition of any excess land The project will not result in any excess land. Limits of Disturbance (including area and volume) The estimated project disturbance area is approximately 34,730 square feet. Approximately 75 cubic yards of cut and approximately 220 cubic yards of fill is required for the expansion, approximately 733 cubic yards of cut is required for the UST excavation. Summary of the Stormwater Management Report A supplement to the existing preliminary stormwater runoff calculations is provided per Riley Purgatory Bluff Creek Watershed District Requirements. The calculations include rate control, volume, and water quality calculations. Please see the enclosed Stormwater Management Report for further information. Water and Wetlands (including discussion of any identified water resource features including type of feature, shoreland classifications, flood elevations, and the determination of whether public or private waters are present). Not applicable. There are no wetlands located on the site. Wildlife (identify habitats, type, location, impacts and any mitigating measures). Not applicable. The subject site is currently developed. Soils (including building or stormwater runoff management constraints and/or special conditions of construction) The site is currently developed with the existing Costco Fuel Facility. Existing soil types are sandy clay, clayey sand, and silty sand underlain by sand and are sufficient for the fuel facility foundations as demonstrated by the existing fuel facility. Existing structures (include historic features) The site is currently developed with the Costco warehouse and fuel facility. It is unknown if historic features exist on the site. - 6 - 10821.014-Project Narrative.docx Steep slopes (slopes exceeding 12% and/or elevation difference of 30 feet or more) and bluffs as defined in City Code Section 11.60 There are no steep slopes within the project area. Any other relevant issues associated with the project not already address There are no known relevant issues associated with the fuel facility. Ownership - Identify all owners legal and equitable of all encumbrances and easements upon the land within the proposed PUD Costco Wholesale Corporation is the property owner. Developer- Identify all parties involved in the development including their previous experience and the nature and extent of their participation Costco Wholesale Corporation is the developer. Financing the project - Identify the source and type of financing of project including public financing Not applicable. Housing or land/building use profile, including computations of gross/leasable square footage, housing unit breakdown to square foot, bedrooms, per person unit, parking requirements, etc. Not applicable. The project does not include any housing units. For telecommunication towers information related to height, setback, colocation requirements, tower, and antennae design, mechanical equipment location as outlined in City Code Section 11.06 Not applicable. The project does not include any telecommunication towers. Purpose of Request: Minor Site Plan and Architectural Design Review Pursuant to Eden Prairie Municipal Code Section 11.03.6(E), a Minor Site Plan and Architectural Design Review shall be approved if the following findings are made: 1) The Adherence to, and consistency with, the City's policies and objects as reflected in the Comprehensive Guide Plan and City Design Guidelines. Response: The project will not change the existing use of the site as a fuel facility and is consistent with the City's Comprehensive Guide Plan policies and City Design Guidelines. The fuel facility expansion is consistent with the following goals of the City's Comprehensive Guide Plan: - Land Use Goal One: Continue to develop the City in accordance with the Comprehensive Plan. The site is designated as Transit-Oriented Development under the City's Comprehensive Guide Plan and encourages a rich mix of uses, including retail. The fuel facility is an accessory use to the main Costco Warehouse and is consistent with the City’s Comprehensive Plan to encourage retail development within TOD areas. The site will continue to operate as a Costco Warehouse and fuel facility after the expansion. - 7 - 10821.014-Project Narrative.docx - Economic Competitiveness Goal One: Maintain and Grow Eden Prairie’s Diverse Economy by Retaining and Attracting Businesses. The expansion will improve overall on-site and off-site circulation and provide a more efficient fuel-purchasing experience for Costco members, thereby, maintaining and growing the community's economic health benefit. 2) Adherence to, and consistency with, the City's Code relating to zoning and the subdivision of land. Response: The expansion of the fuel facility does not change the current use of the site. The project site is zoned Regional Service Commercial (C-Reg-Ser) in which the fuel facility is permitted as an ancillary use to the main Costco warehouse. The existing fuel facility was previously approved under Planned Unit Development 2003-0012. The fuel facility will continue to comply with all applicable provisions, including the development standards of the C-Ser-Reg zone, as indicated in the table below: Development Standard Requirement Response Maximum Building Height 40 feet The maximum height of the canopy is approximately 17 feet from finished grade with a 14-foot 6-inch clearance. Front Yard Setback 35 feet The project will not encroach into the setback area. Side Yard Setback 20 feet The project will not encroach into the setback area. Rear Yard Setback 10 feet The project will not encroach into the setback area. Maximum Base Area Ratio (BAR) Maximum 0.2 The project will increase the BAR by .007 resulting in a new BAR of 0.12. Landscaping 5 percent of parking area. The expansion will remove approximately 814 square feet of landscape area, for an overall total of approximately 8.2 percent of interior site landscaping. Trees PUD2003-0012 requires a minimum of 1,111 caliper inches of trees for the site. The project will remove seven (7) trees (approximately 27 caliper inches total). The removed trees will be replaced with 11 2.5-inch trees for an overall total of approximately 1,111.5 caliper inches of trees on the site. Off-Street Parking 4.5 parking stalls per 1,000 square feet of gross floor area for general retail uses. The project will remove 16 parking stalls and the Costco - 8 - 10821.014-Project Narrative.docx Development Standard Requirement Response (144,626/1,000x4.5 = 650 stalls) PUD requires a minimum of 736 parking spaces. site will provide an overall total of 758 parking stalls. Signs One (1) wall sign per façade Maximum wall sign area per PUD2003-0012 is 27 square feet for each facade. The project will include one (1) 20-square-foot "Costco Wholesale" sign on each façade of the canopy. Exterior Lighting Recessed non-glare lighting is required for under the canopy. Maximum average horizontal luminance of 10 foot-candles at grade and 0.5 foot-candles at the property line. Under-canopy lighting will continue to be LED lighting fixtures and lighting will be directed downward to prevent glare. Design Criteria Complement the primary building and utilize three (3) contrasting and complementary materials with at least one (1) color variation. The design will match the existing structure and will include a metal-wrapped canopy fascia and brick- wrapped canopy columns in two (2) orientations and three (3) colors. Shoreland Criteria - Impervious Surface Area 30 percent maximum; however, PUD 2003-0012 allows a maximum 77 percent of impervious surface area for the Costco site. The project will increase the impervious surface area by approximately 0.1 percent, for an overall coverage area of approximately 74.6 percent for the Costco site. Telecommunication Towers Towers must meet building setback requirements. Maximum height of 150 feet. Not applicable. No telecommunication towers will be installed as part of the expansion. 3) The preservation and enhancement of the natural and built environment as well as those modifications already effected by development and construction upon the land, including the minimization of: tree loss, soil removal, wetland, floodplain, lake and creek encroachment; and the maintenance of the general natural topography or physical grade of the land consistent with that of adjoining properties. - 9 - 10821.014-Project Narrative.docx Response: The project site is currently developed and the project will not change the existing use of the site as a fuel facility. The limits of work for the expansion will remain within the developed area of the site and will not impact any wetlands, floodplain, lake, and creek encroachment or the natural topography. There will be no significant modifications to the physical grade of the land and the site's grades will remain consistent with those of adjoining properties. The project will remove seven (7) interior parking lot trees and the removed trees will be replaced consistent with City replacement requirements. 4) Maintenance of open space to provide a desirable environment both for occupants of the site and the general public. Response: The project site is currently developed and the fuel facility expansion will not significantly impact open space for the Costco site. The site will continue to provide a pedestrian pathway from the warehouse to Technology Drive. 5) Transitions where there are difference in land use, building mass, height, densities, and site intensity, in proximity to that which is the subject of the Site Plan and Architectural Design. Transitions may be accomplished by increased setbacks, berming, plantings, larger lot sizes, lower densities, lower flood area ratios, and smaller buildings. Response: The expansion of the fuel facility will not change the current use or general design of the site. The fuel facility was previously approved under PUD2003-0012 and is compatible with existing, surrounding development. In addition, the expansion will not significantly alter the scale, massing, height, densities, and site intensity of the existing fuel facility. 6) Provision for safe and convenient vehicle and pedestrian traffic, including interior drives and parking arrangements which facilitate clear access to public streets, appropriate widths, for drives and access points, and the separation of vehicular and pedestrian traffic. Response: The fuel facility expansion will continue to provide for safe and convenient vehicle and pedestrian traffic, including interior drives and parking arrangements, a clear access to public streets, and the separation of vehicular and pedestrian traffic. In addition, the eastern driveway will be widened and new striping installed to improve internal site circulation. Please see the enclosed Trip Generation and Queueing Summary prepared by Kittelson & Associates, Inc. dated April 19, 2023 for further information. 7) The minimization of negative impacts upon other land uses of surface water run off, noise, glare, odors, vibrations, dust, loading areas, parking areas, and refuse areas. Response: The project will not change the existing use of the site as a fuel facility and will not significantly impact surface water runoff, noise, glare, odors, vibrations, dust, loading areas, parking area, and refuse areas for the site and surrounding land uses. 8) Compatibility of materials, textures, colors, and other construction details with other structures and uses in the vicinity. Response: The canopy expansion is designed to match the existing structure. The existing canopy design was previously approved under PUD 2003-0012 and includes a metal-wrapped canopy fascia with brick-wrapped canopy columns in two (2) orientations and three (3) colors. The canopy design is consistent with the design and general appearance of the main Costco warehouse and is compatible with existing, surrounding development. 9) Such other conditions and criteria as are reasonably related to the health, safety and welfare of the residents of the City and to preservation of the environment. - 10 - 10821.014-Project Narrative.docx Response: The project will not change the existing use of the site as a fuel facility and will comply with all local, state, and federal permitting requirements required to protect the health, safety, and welfare of the residents of the City. 10) Preservation of Heritage Preservations Sites as designated by the Council pursuant to Section 11.05 and adherence to, and consistency with, the City's policies and objectives as reflected in the Heritage Preservation Site Program. Response: This is not applicable. The project site is not a designated Heritage Preservation Site. Planned Unit Development Amendment Pursuant to Eden Prairie Municipal Code Section 11.40.11, a Planned Unit Development Amendment shall be approved if the following findings are made: 1) The proposed development is not in conflict with the goals of the Guide Plan of the City. Response: The project will not change the existing use of the site as a fuel facility and is consistent with the following goals of the City's Comprehensive Guide Plan: - Land Use Goal One: Continue to develop the City in accordance with the Comprehensive Plan. The site is designated as Transit Oriented Development (TOD) under the City's Comprehensive Guide Plan and encourages a rich mix of uses, including retail. The fuel facility is an accessory use to the main Costco Warehouse and is consistent with the City’s Comprehensive Plan to encourage retail development within TOD areas. The site will continue to operate as a Costco Warehouse and fuel facility after the expansion. - Economic Competitiveness Goal One: Maintain and Grow Eden Prairie’s Diverse Economy by Retaining and Attracting Businesses. The expansion will improve overall on-site and off-site circulation and provide a more efficient fuel-purchasing experience for Costco members, thereby, maintaining and growing the community's economic health benefit. 2) The proposed development is designed in such a manner to form a desirable and unified environment within its own boundaries. Response: The canopy expansion is designed to match the existing structure. The existing canopy design was previously approved under PUD 2003-0012 and includes a metal-wrapped canopy fascia with brick-wrapped canopy columns in two (2) orientations and three (3) colors. The canopy design is consistent with the design and general appearance of the main Costco warehouse to form a desirable and unified environment within its own boundaries. The fuel facility is also compatible with existing, surrounding development. 3) Any exceptions to the standard requirements of this Chapter and Chapter 12 of this code are justified by the design of the development. Response: The project will widen the existing eastern driveway off of Technology Drive to approximately 46 feet. In addition, diagonal striping and a median will be installed to provide a buffer between the entrance lane and the two (2) exit lanes. City driveway standards require parking lot driveways to be a maximum of 30 feet wide and an approved waiver for the site allows a maximum driveway width of 37 feet for the site’s eastern driveway and a maximum width of 38 feet for the site’s western driveway. The widened driveway will allow the site to - 11 - 10821.014-Project Narrative.docx maintain a 2-lane exit onto Technology Drive and improve site circulation. Please see the Trip Generation and Queueing Summary prepared by Kittelson & Associates, Inc. dated April 19, 2023 for further information. 4) The PUD is of composition, and arrangement that its construction, marketing, and operation are feasible as a complete unit without dependence upon any subsequent unit, and the PUD shall be consistent with an approved PUD concept. Response: The expansion of the fuel facility does not change the current use of the site and the existing fuel facility was found to be composed and arranged such that its construction, marketing, and operation are feasible as a complete unit without dependence upon any subsequent unit under the previous PUD approval (PUD No. 2003-0012). Conclusion: The responses above and application materials demonstrate that the expansion meets the approval criteria for a Minor Site Plan and Architectural Design Review and Planned Unit Development Amendment. The City's approval of this application is respectfully requested. STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER VAN VAN VAN NOPARKING NOPARKING NO PAR K I N G NO PARKING NOPARKING NO PAR K I N G NO PAR K I N G NO PA R K I N G NO PAR K I N G NO PAR K I N G NO PAR K I N G STOP STOP STOP EVEV X X X X X X X X X LT HH Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 11 LOT 1, BLOCK 1, EMERSON PROCESS MANAGEMENT ADDITION, ACCORDING TO THE RECODED PLAT THEREOF, HENNEPIN COUNTY MINNESOTA; EXCEPT THAT PART WHICH LIES SOUTHERLY OF LINE 1 BELOW; LINE 1: BEGINNING AT A POINT ON THE WEST LINE OF SAID LOT 1, BLOCK 1, EMERSON PROCESS MANAGEMENT ADDITION DISTANT 68,00 FEET NORTHERLY OF THE SOUTHWEST CORNER OF SAID LOT 1, THENCE EASTERLY TO A 67.00 FEET NORTHERLY OF THE SOUTHEAST CORNER OF SAID LOT 1 AND THERE TERMINATING. LEGAL DESCRIPTION EDEN PRAIRIE SHOPPING CENTER P R A I R I E C E N T E R D R . TECHNOLOGY DR. 494 494 VALLEY VIEW RD. TECHNOLOGY DR. PR A I R I E CE N T E R D R . PROJECT SITE SINGLETREE LN. CITY OF EDEN PRAIRIE CITY ZONING CODE 2003 (C-REG-SER) (788,608 S.F.) 18.104 ACRES SIDE/REAR: COSTCO WHOLESALE 999 LAKE DRIVE ISSAQUAH, WA 98027 BOUNDARIES INFORMATION: TIRE CENTER BUILDING AREA BUILDING DATA: TOTAL BUILDING CLIENT: PROJECT ADDRESS: JURISDICTION: SITE AREA: ZONING: SETBACKS: 12011 TECHNOLOGY DRIVE EDEN PRAIRIE, MN 55344 5,200 S.F. 144,626 S.F. 139,426 S.F. FRONT: 20 FT. 35 FT. PARKING DATA: 10' WIDE STALLS EXISTING PARKING: TOTAL EXISTING PARKING ACCESSIBLE STALLS 9' WIDE STALLS 774 STALLS 106 STALLS 16 STALLS 652 STALLS NO. OF STALLS PER 1000 SF OF BUILDING AREA:5.35 STALLS PROJECT DATA NOTES: EXISTING CONDITIONS TO BE FIELD VERIFIED. 10' WIDE STALLS PROPOSED PARKING: TOTAL PROPOSED PARKING ACCESSIBLE STALLS 9' WIDE STALLS 758 STALLS 106 STALLS 16 STALLS 636 STALLS NO. OF STALLS PER 1000 SF OF BUILDING AREA:5.25 STALLS OFFICE IDUSTRIAL PARK REGIONAL SERVICE COMMERCIAL 74.5% EX. IMPERVIOUS LOT COVERAGE: 74.6% (75% MINIMUM) PROPOSED IMPERVIOUS LOT COVERAGE: EX. CANOPY BASE AREA RATIO PROPOSED CANOPY AREA EX. CANOPY AREA PROPOSED CANOPY BASE AREA RATIO 9,203 S.F. .012 .005 3,842 S.F. OV E R A L L S I T E P L A N 2 OVERALL SITE PLAN SCALE: 1"=60' FLY I N G C L O U D R D . TECHNOLOGY DRIVE 35,360 SF TOTAL DISTURBED AREA (ON-SITE): 33,166 SF IMPERVIOUS AREA: EXISTING 33,980 SF PROPOSED 2,194 SF PERVIOUS AREA: EXISTING 1,380 SF PROPOSED STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER STOP STOP STOP EV HH Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 10 DE T A I L E D S I T E P L A N 3 DETAILED SITE PLAN SCALE: 1"=20' CITY OF EDEN PRAIRIE CITY ZONING CODE 2003 (C-REG-SER) (788,608 S.F.) 18.104 ACRES SIDE/REAR: COSTCO WHOLESALE 999 LAKE DRIVE ISSAQUAH, WA 98027 BOUNDARIES INFORMATION: TIRE CENTER BUILDING AREA BUILDING DATA: TOTAL BUILDING CLIENT: PROJECT ADDRESS: JURISDICTION: SITE AREA: ZONING: SETBACKS: 12011 TECHNOLOGY DRIVE EDEN PRAIRIE, MN 55344 5,200 S.F. 144,626 S.F. 139,426 S.F. FRONT: 20 FT. 35 FT. PARKING DATA: 10' WIDE STALLS EXISTING PARKING: TOTAL EXISTING PARKING ACCESSIBLE STALLS 9' WIDE STALLS 774 STALLS 106 STALLS 16 STALLS 652 STALLS NO. OF STALLS PER 1000 SF OF BUILDING AREA:5.35 STALLS PROJECT DATA NOTES: EXISTING CONDITIONS TO BE FIELD VERIFIED. 10' WIDE STALLS PROPOSED PARKING: TOTAL PROPOSED PARKING ACCESSIBLE STALLS 9' WIDE STALLS 758 STALLS 106 STALLS 16 STALLS 636 STALLS NO. OF STALLS PER 1000 SF OF BUILDING AREA:5.25 STALLS 74.5% EX. IMPERVIOUS LOT COVERAGE: 74.6% (75% MINIMUM) PROPOSED IMPERVIOUS LOT COVERAGE: EX. CANOPY BASE AREA RATIO PROPOSED CANOPY AREA EX. CANOPY AREA PROPOSED CANOPY BASE AREA RATIO 9,203 S.F. .012 .005 3,842 S.F. TECHNOLOGY DRIVE 35,360 SF TOTAL DISTURBED AREA (ON-SITE): 33,166 SF IMPERVIOUS AREA: EXISTING 33,980 SF PROPOSED 2,194 SF PERVIOUS AREA: EXISTING 1,380 SF PROPOSED 11.21.2022PROJECT# 03-0730-09EDEN PRAIRIE, MN DD31-01CONCEPT FUEL ELEVATIONS KEY PLAN SCALE: NTS ST O P ST O P SP_FF_ADDITIVE TANK_US_1011 STOP PM NOTES:20' MIN BETWEEN THIS EDGE OFARID PERMEATOR TO UST FILL PORT PM NOTES:10' MIN FROM THIS EDGE OF ARID PERMEATORTO CONTROLLER ENCLOSURE STOP STOP STOP STOP 11.21.2022PROJECT# 03-0730-09EDEN PRAIRIE, MN DD31-02CONCEPT CONTROLLER ENCLOSURE ELEVATIONS A B C KEY PLAN SCALE: NTS STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER VAN VAN VAN NOPARKING NOPARKING NO PAR K I N G NO PARKING NOPARKING NO PAR K I N G NO PAR K I N G NO PAR K I N G NO PAR K I N G NO PAR K I N G NO PAR K I N G STOP STOP STOP EVEV X X X X X X X X X LT CB RE=883.5 HH CITY OF EDEN PRAIRIE CITY ZONING CODE 2003 (C-REG-SER) (788,608 S.F.) 18.104 ACRES THIS PLAN HAS BEEN PREPARED BY USING A SITE PLAN PROVIDED BY MULVANNY G2 ARCHITECTURE DATED 9.21.15. SIDE/REAR: COSTCO WHOLESALE 999 LAKE DRIVE ISSAQUAH, WA 98027 BOUNDARIES INFORMATION: TIRE CENTER BUILDING AREA BUILDING DATA: TOTAL BUILDING CLIENT: PROJECT ADDRESS: JURISDICTION: SITE AREA: ZONING: SETBACKS: 12011 TECHNOLOGY DRIVE EDEN PRAIRIE, MN 55344 5,200 S.F. 144,626 S.F. 139,426 S.F. FRONT: 20 FT. 35 FT. PARKING DATA: 10' WIDE STALLS EXISTING PARKING: TOTAL EXISTING PARKING ACCESSIBLE STALLS 9' WIDE STALLS 774 STALLS 106 STALLS 16 STALLS 652 STALLS NO. OF STALLS PER 1000 SF OF BUILDING AREA:5.35 STALLS PROJECT DATA NOTES: EXISTING CONDITIONS TO BE FIELD VERIFIED. 10' WIDE STALLS PROPOSED PARKING: TOTAL PROPOSED PARKING ACCESSIBLE STALLS 9' WIDE STALLS 758 STALLS 106 STALLS 16 STALLS 636 STALLS NO. OF STALLS PER 1000 SF OF BUILDING AREA:5.25 STALLS 74.5% EX. IMPERVIOUS LOT COVERAGE: 74.5% PROPOSED IMPERVIOUS LOT COVERAGE: EX. CANOPY BASE AREA RATIO PROPOSED CANOPY AREA EX. CANOPY AREA PROPOSED CANOPY BASE AREA RATIO 9,203 S.F. .012 .005 3,842 S.F. MAY 9, 2023 LOT 1, BLOCK 1, EMERSON PROCESS MANAGEMENT ADDITION, ACCORDING TO THE RECODED PLAT THEREOF, HENNEPIN COUNTY MINNESOTA; EXCEPT THAT PART WHICH LIES SOUTHERLY OF LINE 1 BELOW; LINE 1: BEGINNING AT A POINT ON THE WEST LINE OF SAID LOT 1, BLOCK 1, EMERSON PROCESS MANAGEMENT ADDITION DISTANT 68,00 FEET NORTHERLY OF THE SOUTHWEST CORNER OF SAID LOT 1, THENCE EASTERLY TO A 67.00 FEET NORTHERLY OF THE SOUTHEAST CORNER OF SAID LOT 1 AND THERE TERMINATING. LEGAL DESCRIPTION OVERALL SITE PLAN WITH DEMO SCALE: 1"=60' Snow Storage Area SNOW S T O R AG E E XH IB I T SNOW STORAGE EXHIBIT 74.6% STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER VAN VAN VAN NOPARKING NOPARKING NO PAR K I N G NO PARKING NOPARKING NO PAR K I N G NO PAR K I N G NO PA R K I N G NO PAR K I N G NO PAR K I N G NO PAR K I N G STOP STOP STOP EVEV X X X X X X X X X LT HH Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 11 EDEN PRAIRIE SHOPPING CENTER P R A I R I E C E N T E R D R . TECHNOLOGY DR. 494 494 VALLEY VIEW RD. TECHNOLOGY DR. PR A I R I E CE N T E R D R . PROJECT SITE SINGLETREE LN. OFFICE IDUSTRIAL PARK REGIONAL SERVICE COMMERCIAL TR U C K T U R N E X H I B I T 4 TRUCK TURN EXHIBIT SCALE: 1"=60' FLY I N G C L O U D R D . TECHNOLOGY DRIVE LT STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER UE UE CBMH RE=885.9 IE=880.9(E) IE=880.5(W) IE=877.9(NW/S) STOP STOP STOP CB RE=880.47 INV=877.85 (SE) ST STMH RE=881.99 INV=876.19 (E) INV=875.74 (NW) INV=870.78 (N) INV=870.72 (W)HH SS SSMH RE=884.32 INV=869.09 (S) INV=869.05 (W) T N H C SS SSMH RE=878.83 INV=868.71 (E) INV=867.95 (W) G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UTV UTV UTV UTV UTV UTV UTV UTV UT V UTV UTV UTV UTV UT V UT V UTV UTV UTV UTV OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE FO FO FO >>>>>>>> >> >> >>>>>>>>>>>>>> > > >>>>>>>>> UE UE UE UE I I I IIIIIIII I I I I I I I I I I I I I I I I I I HH FF=886.90 Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 UTILITY CONFLICT NOTE: Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 10 GR A D I N G P L A N 4 GRADING PLAN SCALE: 1"=20' LEGEND EX. FUEL CANOPY TO REMAIN TECHNOLOGY DRIVE DISTURBED AREA SUMMARY:GRADING QUANTITIES: TREE INVENTORY LT LT EM STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER STOP STOP STOP UE UE CBMH RE=885.9 IE=880.9(E) IE=880.5(W) IE=877.9(NW/S) LT EM STOP STOP STOP CB RE=880.47 INV=877.85 (SE) ST STMH RE=881.99 INV=876.19 (E) INV=875.74 (NW) INV=870.78 (N) INV=870.72 (W)HH SS SSMH RE=884.32 INV=869.09 (S) INV=869.05 (W) CBMH RE=885.25 INV=880.45 (E) INV=880.45 (W) CBMH RE=885.37 CB RE=883.53 SS SSMH RE=878.83 INV=868.71 (E) INV=867.95 (W) G G G G G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UTV UTV UTV UTV UTV UTV UTV UTV UT V UTV UTV UTV UTV UT V UT V UTV UTV UTV OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE >>>>>>>> >> >> >>>>>>>>>>>>>>>> > > >>>>>>>>> UE UE UE UE I I I IIIIIIII I I I I I I I I I I I I I I I I I HH Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 UTILITY CONFLICT NOTE: Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 10 DE M O L I T I O N A N D E R O S I O N C O N T R O L P L A N 7 DEMOLITION AND EROSION CONTROL PLAN SCALE: 1"=20' LEGEND TECHNOLOGY DRIVE EX. FUEL CANOPY TO REMAIN EX. USTs TO REMAIN LT STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER UE UE CBMH RE=885.9 IE=880.9(E) IE=880.5(W) IE=877.9(NW/S) STOP STOP STOP CB RE=880.47 INV=877.85 (SE) ST STMH RE=881.99 INV=876.19 (E) INV=875.74 (NW) INV=870.78 (N) INV=870.72 (W)HH SS SSMH RE=884.32 INV=869.09 (S) INV=869.05 (W) SS SSMH RE=878.83 INV=868.71 (E) INV=867.95 (W) G G G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UTV UTV UTV UTV UTV UTV UTV UTV UT V UTV UTV UTV UTV UT V UT V OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE >>>>>>>> >> >> >>>>>>>>>>>>>> > > >>>>>>>>> UE UE UE UE I I I IIIIIIII I I I I I I I I I I I I I I I I I HH FF=886.90 SSMH #3 SSCO #5 SSMH #4 SSCO #4 SSCO #3 SSCO #2 SSMH #2 SSMH #1 SSCO #1 Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 UTILITY CONFLICT NOTE: Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 10 UT I L I T Y P L A N 9 UTILITY PLAN SCALE: 1"=20' LEGEND EX. FUEL CANOPY TO REMAIN TECHNOLOGY DRIVE SITE UTILITY SCHEDULE LT STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER UE UE CBMH RE=885.9 IE=880.9(E) IE=880.5(W) IE=877.9(NW/S) STOP STOP STOP CB RE=880.47 INV=877.85 (SE) ST STMH RE=881.99 INV=876.19 (E) INV=875.74 (NW) INV=870.78 (N) INV=870.72 (W)HH SS SSMH RE=884.32 INV=869.09 (S) INV=869.05 (W) CBMH RE=885.25 INV=880.45 (E) INV=880.45 (W) T N H C CBMH RE=885.37 CB RE=883.53 SS SSMH RE=878.83 INV=868.71 (E) INV=867.95 (W) G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UTV UTV UTV UTV UTV UTV UTV UTV UT V UTV UTV UTV UTV UT V UT V UTV UTV UTV UTV OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE FO FO FO >>>>>>>> >> >> >>>>>>>>>>>>>>>> > > >>>>>>>>> UE UE UE UE I I I IIIIIIII I I I I I I I I I I I I I I I I I I HH ROW-CB#2 ROW-CB#1 CB# 1 CB# 2 SDCO# 6 SDCO# 2 SDCO# 3 SDCO# 4 SDCO# 5 SDCO# 7 OWS FF=886.90 STORMFILTER #1 CDS CB# 3 Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 UTILITY CONFLICT NOTE: Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 10 DR A I N A G E P L A N 5 DRAINAGE PLAN SCALE: 1"=20' LEGEND EX. FUEL CANOPY TO REMAIN TECHNOLOGY DRIVE SITE DRAINAGE SCHEDULE LT STOP STOP STOP STOP STOP DO NOT ENTER DO NOT ENTER DO NOT ENTER DO NOT ENTER UE UE > >> >> >> >> >> > > > > >> >> >> >> IIIIIII STOP STOP STOP CB RE=880.47 INV=877.85 (SE) ST STMH RE=881.99 INV=876.19 (E) INV=875.74 (NW) INV=870.78 (N) INV=870.72 (W)HH INV=860.62 (BTM S) SS SSMH RE=884.32 INV=869.09 (S) INV=869.05 (W) G G G G G G G G G G G G G G G G G G UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UTV UTV UTV UTV UTV UTV UT V UTV UTV UTV UTV UT V UT V UTV UTV OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE >>>> >> >> >>>>>>>>>>>>>>>> > > >>>>>>> I I I IIIIIIII HH AW AWAW AW AWAW AWAW KF AW AW AW AW AW AW AW AW AW AW KFKF KF KFKF KF AW AW AW AW AW AW AW AW AW AW AW AW AW AW AW AW KF KF KF KFKF KF KF KF KF KF KFKF KF KFKF KF AW EDEN PRAIRIE SHOPPING CENTER FL Y I N G C L O U D R D . P R A I R I E C E N T E R D R . TECHNOLOGY DR. 5 494 494 VALLEY VIEW RD. TECHNOLOGY DR. PR A I R I E CE N T E R D R . PROJECT SITE SINGLETREE LN. 212 REMOVE AND CAP PORTIONS OF EXISTING IRRIGATION NO LONGER NECESSARY FOR NEW BED LAYOUT. RE-ROUTE ANY PORTIONS OF EXISTING IRRIGATION THROUGH EXISTING BEDS CONTRACTOR TO ADJUST EXISTING IRRIGATION SYSTEM AS NECESSARY TO ACCOMMODATE NEW PLANTINGS AND TO PROVIDE ADEQUATE WATER TO ENSURE GROWTH. NOTIFY OWNER IF EXISTING LATERAL LINE AND VALVE ARE INSUFFICIENT TO PROVIDE ADEQUATE WATER TO NEW PLANTINGS 6" MAPLE 8" MAPLE 6" HONEYLOCUST 6" HONEYLOCUST 6" HONEYLOCUST 6" HONEYLOCUST 6" HONEYLOCUST 6" HONEYLOCUST RETURN ANY ADDITIONAL AREAS AFFECTED BY CONSTRUCTION TO PRE-CONSTRUCTION CONDITION. FOR THIS AREA, INSTALL NEW SOD LAWN EXISTING EVERGREEN TREES TO REMAIN 2" MAPLE 7" MAPLE 6" MAPLE 6" MAPLE 8/6/2024 Fo r : Ti t l e : 12 0 1 1 T E C H N O L O G Y D R I V E ED E N P R A I R I E , M N 5 5 3 4 4 CO S T C O G A S O L I N E F A C I L I T Y # 7 8 3 UTILITY CONFLICT NOTE: Dial 811 Callbefore you dig. below.Know what's PRE L I M I N A R Y CO S T C O W H O L E S A L E 99 9 L A K E D R I V E IS S A Q U A H , W A 9 8 0 2 7 10 8 2 1 10 2" MAPLE 2" MAPLE 2" MAPLE MULCH ONLY WITHIN BOLLARDS SURROUNDING EQUIPMEMT EXISTING TREES. NO NEW TREES PROPOSED TO BE INSTALLED IN EASEMENT Costco Fuel Facility Expansion Costco Wholesale 12011 Technology Drive PLANNED UNIT DEVELOPMENT AMENDMENT, MINOR SITE PLAN AND ARCHITECTURAL DESIGN REVIEW 1 •Expansion of Costco Fuel Facility •Project area includes the queue and eastern portion of the existing fuel facility area •Improve member fueling experience •Reduce vehicle queues and improve overall site circulation PROJECT OVERVIEW: 2 PROJECT LOCATION: •Northern area of the Costco site •Queue area and eastern portion of existing fuel facility 3 PROJECT DESCRIPTION - EXISTING: EXISTING: •8 dispensers •3 - 20,000-gallon gasoline USTs; 1 – 1,500-gallon fuel additive UST •3,842-square-foot canopy •Inside fuel drop lane 4 PROJECT DESCRIPTION - NEW: NEW: •7 new dispensers •1 new 30,000-gallon UST •5,361-square-foot canopy expansion (9,203 square feet total) •Outside fuel drop lane •New controller enclosure •Widening of eastern driveway 5 CANOPY DESIGN/SIGNAGE: 6 •Brick veneer columns •Metal canopy fascia •Design consistent with existing fuel canopy, overall Costco site and surrounding area •Signage consistent with existing canopy signage CONTROLLER ENCLOSURE DESIGN: 7 •3-toned brick walls •Design consistent with existing fuel canopy, overall Costco site and surrounding area TRANSPORTATION: 8 •Minor increase in traffic demand •Majority latent demand induced by more efficient operation •Expected net 50% decrease in queues/wait times •Increased processing capacity •Site driveways projected to continue to operate acceptably •Recent transportation improvements: •New traffic signal at west driveway •Technology Drive restriping & new turn lanes •Restriped west driveway (separate turn lanes) EXAMPLE: Saturday Peak Hour Queues (Existing vs. Future) OPERATION: •Operations consistent with existing fuel facility •Attendant on-site •Costco membership only •Red light/green light system for dispenser availability 9 THANK YOU Questions? 10