Loading...
HomeMy WebLinkAboutPlanning Commission - 05/22/2023ANNOTATED AGENDA TO: Planning Commission Members FROM: Jeremy Barnhart, City Planner RE: Planning Commission Meeting for Monday, May 22, 2023 _______________________________________________________________________________ Monday, May 22, 2023 7:00 PM, COUNCIL CHAMBERS I. CALL THE MEETING TO ORDER II. PLEDGE OF ALLEGIANCE- ROLL CALL III. APPROVAL OF AGENDA MOTION: Move to approve the agenda. IV. APPROVAL OF MINUTES A. PLANNING COMMISSION MEETING HELD MONDAY, MARCH 13, 2023. MOTION: Move to approve the Planning Commission minutes dated May 8, 2023. V. PUBLIC HEARINGS A. BAKER ROAD ASSISTED LIVING (2023-02) Request for approval on: • Guide Plan Change from Office to Medium High Density Residential on 3.79 acres • PUD Concept Plan Review on 3.79 acres • PUD District Review with waivers on 3.79 acres • Zoning Change from Office to RM-2.5 on 3.79 acres • Site Plan Review on 3.79acres The applicant is requesting approval to construct an assisted living facility at 6216 Baker Road, south of Highway 62 and west of Baker Road. The project improvements are proposed in two phases. Phase I includes a renovation of the existing 2-story 16,309 square foot office building into 24 assisted living units with a total of 31 beds. The majority of the improvements in this phase will be interior to the building, though there are minor exterior improvements. Phase II is proposed to include a 52,938 square foot 4-story addition to the building, which would add 81 units with a total of 81 beds. At full build out, the facility will have a total of 105 units and 112 beds. Phase II would include significant site work. MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for a Guide Plan change from Office to Medium High Density Residential on 3.79 acres, a Planned Unit Development Concept Plan Review on 3.79 acres, a Planned Unit Development District review with waivers on 3.79 acres, a Zone ANNOTATED AGENDA May 22, 2023 Page 2 Change from Office to RM-2.5 on 3.79 acres, and a Site Plan Review on 3.79 acres as represented in the May 22, 2023 staff report and based on plans last dated April 28, 2023. B. BUSH LAKE PET HOSPITAL (2023-04) Request for: • Zoning Change from Office (OFC) to Neighborhood Commercial (N-COM) on 1.19 acres • PUD Concept Review on 1.19 acres • PUD Review with waivers on 1.19 acres • Site Plan Review on 1.19 acres MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for a zone change from Office to Neighborhood Commercial on 1.19 acres, Planned Unit Development Concept Review on 1.19 acres, Planned Unit Development District Review with waivers on 1.19 acres, and site plan review on 1.19 acres as represented in the staff report dated May 22, 2023 and based on the plans last dated May 19, 2023. C. KIWATCHI (2022-11) Request for: • Zoning Change from Rural to R1-9.5 on 2.11 acres • Preliminary Plat of 4 lots and 3 outlots on 2.11acres. The applicant is requesting approval to divide one parcel into 4 single family lots and 3 outlots. The 2.11-acre property is located at 6285 Duck Lake Road located at the corner of Duck Lake Road and Claycross Way. The land is generally flat with some trees and a small piece of wetland along the east property line. The property is guided Low Density Residential and the proposed density at 1.9 units per acre is consistent with the guiding. Current zoning is Rural and the applicant is requesting a zone change to R1-9.5. The lots conform to the R1-9.5 zoning standards. The wetland, wetland buffer and stormwater management will be encompassed by Outlot A, which will be deeded to the City. Outlots B and C will be transferred to the property owners to the north to add square footage to their lots. MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for a zone change from Rural to R1-9.5 on 2.11 acres and a Preliminary Plat of one parcel into 4 lots and 3 outlots on 2.11 acres as represented in the staff report dated May 22, 2023 and based on plans last dated May 5, 2023. VI. PLANNERS’ REPORT VII. MEMBERS’ REPORT ANNOTATED AGENDA May 22, 2023 Page 3 VIII. ADJOURNMENT MOTION: Move to adjourn the Planning Commission meeting. AGENDA EDEN PRAIRIE PLANNING COMMISSION Monday, May 22, 2023 - 7:00 P.M. PLANNING COMMISSION MEMBERS: John Kirk, Andrew Pieper, Ed Farr, Carole Mette, Robert Taylor, Daniel Grote, Frank Sherwood, Charles Weber, Phou Sivilay STAFF MEMBERS: Jeremy Barnhart, City Planner; Rod Rue, City Engineer; Matt Bourne, Manager of Parks and Natural Resources I. CALL THE MEETING TO ORDER II. PLEDGE OF ALLEGIANCE -- ROLL CALL III. APPROVAL OF AGENDA IV. MINUTES A. Approval of the Planning Commission Meeting minutes dated May 8, 2023. V. PUBLIC HEARINGS A. BAKER ROAD ASSISTED LIVING (2023-02) Request for: • Guide Plan Change from Office to Medium High Density Residential on 3.79 acres • PUD Concept Plan Review on 3.79 acres • PUD District Review with waivers on 3.79 acre • Zoning Change from Office to RM-2.5 on 3.79 acres • Site Plan Review on 3.79 acres B. BUSH LAKE PET HOSPITAL (2023-04) Request for: • Zoning Change from Office (OFC) to Neighborhood Commercial (N-COM) on 1.19 acres • Planned Unit Development Concept Review on 1.19 acres • Planned Unit Development Review with waivers on 1.19 acres • Site Plan Review on 1.19 acres C. KIWATCHI DEVELOPMENT (2022-11) Request for: • Zoning Change from Rural to R1-9.5 on 2.11 acres • Preliminary Plat of one parcel into 4 lots and 3 outlots on 2.11 acres VI. PLANNERS’ REPORT VII. MEMBERS’ REPORTS VIII. ADJOURNMENT UNAPPROVED MINUTES EDEN PRAIRIE PLANNING COMMISSION MONDAY, MAY 8, 2023 7:00 PM—CITY CENTER Council Chambers 8080 Mitchell Road COMMISSION MEMBERS: John Kirk, Frank Sherwood, Andrew Pieper, Ed Farr, Carole Mette, Robert Taylor, Dan Grote, Charles Weber; Phou Sivilay CITY STAFF: Jeremy Barnhart, City Planner; Carter Schulze, Assistant City Engineer; Matt Bourne, Parks & Natural Resources Manager; Kristin Harley, Recording Secretary I. CALL THE MEETING TO ORDER Chair Pieper called the meeting to order at 7:00 p.m. II. PLEDGE OF ALLEGIANCE – ROLL CALL Absent was commission member Taylor. III. APPROVAL OF AGENDA MOTION: Grote moved, seconded by Kirk to approve the agenda. MOTION CARRIED 8-0. IV. MINUTES MOTION: Farr moved, seconded by Weber to approve the minutes of March 13, 2022. MOTION CARRIED 8-0. V. PUBLIC HEARINGS A. COMPREHENSIVE PLAN AMENDMENT – TRANSPORTATION AND TRAILS (2023-01CA) Request for: • Approval of an amendment to Chapter 6 (Transportation and Accessibility) of the Eden Prairie Comprehensive Plan, ASPIRE 2040. These changes relate to reclassification of certain trails and roadways required by the Metropolitan Council, in addition to other housekeeping changes. PLANNING COMMISSION MINUTES May 8, 2023 Page 2 Barnhart displayed a PowerPoint and stated this was an amendment to the Comprehensive Plan. The Met Council established policies for regional transportation systems, parks, and water resources. It recently updated its Transportation Plan and Parks policy plans, and updated the roadway classification map. The reclassifications were as follows: Bryant Lake Road changed from a Planned Minor Collector to a Planned Major Collector. Washington Avenue South changed from a Minor Reliever to a Major Collector. Eden Prairie Road changed from Planned Minor Collector to a Minor Collector. Scenic Heights Road changed from a Major Collector to a Minor Collector. Staff had identified roads in the regional network that needed to be updated on the maps. There were no projects on these roads currently underway or planned in the near future. Regarding the Bike and Pedestrian Trail network there were two segments which changed: the trail along Pioneer Trail was now classified as a Tier Two regional trail. The trail along Baker Road north of Valley View Road was now classified as a Tier Two trail. Both classifications related to funding priorities due to their regional importance. Barnhart explained these changes could result in additional funding opportunities. Housekeeping changes included changing the name of the MnPass Program to its current name, E-ZPass. There were no policy changes. MOTION: Grote moved, seconded by Sivilay to close the public hearing. Motion carried 8-0. Farr asked if some of these road designations impacted right-of way or setbacks to right-of-way. Barnhart the changes would not affect setbacks, which were driven by the zoning district, but there could be additional right of way which would be indirectly affected. Grote asked if improvements would be needed in response to these changes. Schulze stated there would not be any improvements required at this time, but Bryant Lake Road could require them in the future. Mette asked for a clarification of the difference between major and minor connectors. Schulze replied a major connector referred to connection to a larger area with different signal systems, density, volume of traffic and speeds. Minor connectors involved lower speeds. Both areas were similar. Metter also asked since there were trails on both sides of Pioneer Trail, were both sides affected, and Schulze replied only one side would be designated. Farr stated he recalled the previous application and supported this move. PLANNING COMMISSION MINUTES May 8, 2023 Page 3 MOTION: Grote moved, seconded by Farr to approve the amendment to Chapter 6 (Transportation and Accessibility) of the Eden Prairie Comprehensive Plan, ASPIRE 2040 involving changes related to reclassification of certain trails and roadways required by the Metropolitan Council, in addition to other housekeeping changes. Motion carried 8-0. PLANNERS’ REPORT MEMBERS’ REPORTS Barnhart stated there would be three separate public hearings at the next Planning Commission meeting. VI. ADJOURNMENT MOTION: Kirk moved, seconded by Weber to adjourn. Motion carried 8-0. The meeting was adjourned at 7:11 p.m. Project Site TO: Planning Commission FROM: Beth Novak-Krebs DATE: May 22, 2023 SUBJECT: Baker Road Assisted Living LOCATION: 6216 Baker Road REQUEST: • Guide Plan Change from Office to Medium High Density Residential on 3.79 acres • PUD Concept Plan Review on 3.79 acres • PUD District Review with waivers on 3.79 acre • Zoning Change from Office to RM-2.5 on 3.79 acres • Site Plan Review on 3.79 acres BACKGROUND The applicant is requesting approval to construct an assisted living facility at 6216 Baker Road. The 3.79-acre property is located south of Highway 62 and west of Baker Road. There are industrial uses to the west, residential uses to the south, an office building to the east and Highway 62 to the north. There is a 16,309 square foot 2-story office building on the site. The project improvements are proposed in two phases. The first phase of the project includes a renovation of the existing office building into 24 assisted living units with a total of 31 beds. The majority of the improvements in this phase will be interior to the building, though there are minor exterior improvements. The second phase of the project is proposed to include a 52,938 square foot 4-story addition to the building, which would add 81 units with a total of 81 beds. At full build out, the facility will have a total of 105 units and 112 beds. Phase II would include significant site work. COMPREHENSIVE PLAN AMENDMENT The property is currently guided Office in Aspire 2040. The proposal requires an amendment of the Comprehensive Plan. The applicant is requesting to reguide the property to Medium High Density Residential, which allows a density of 14 to 40 units per acre. When both phases are completed, the density would be 27.7 units per acre. Staff Report – Baker Road Assisted Living Page 2 2 Phase II Site Plan The property is currently zoned Office. The applicant is requesting a rezone to RM-2.5. Provided the reguiding is approved by the Metropolitan Council, the zoning will be consistent with the Medium High Density Residential guiding of the property. The assisted living facility is permitted in the RM-2.5 zoning district. SITE PLAN Phase I of the proposed project utilizes the existing building, which is located on the easterly ½ of the site. Access to the site and the existing parking lot which is south of the building will remain the same. The applicant is proposing to modify the main entrance into the building by repaving the sidewalk and adding a canopy over the sidewalk. A new patio will be located behind the building, a new monument sign will be located near the drive lane onto the property and the existing parking lot will be repaved and restriped. Phase I is expected to begin in quarter 3 of 2023. Phase II of the project involves the construction of a 52,938 square foot addition to the west side of the existing building. The parking would be reconfigured with a circular drive and parking near the main entrance to the Phase I building with additional parking on the west side of the new addition. The improvements will also include a second patio in the back of the building with a sidewalk system around the south, west, and north sides of the building, a new drop off area, reconfiguring the entire parking area, and adding retaining walls. Ultimately, the project will provide assisted living and treatment for patients suffering from dementia. The construction schedule of Phase II has not yet been determined. ACCESS Access to the site comes from Baker Road and Phase I Site Plan Staff Report – Baker Road Assisted Living Page 3 3 across the office property to the east. The two office buildings were planned together in 1996 with shared access drive from Baker Road. The office building on the east side will remain. Anyone driving to the assisted living facility will enter from Baker Road, cross the office property on the east and enter the subject property. There is a shared access agreement in place. Since the owner of this property and the property to the east also share sanitary sewer and water lines, staff recommends that both owners enter into a cross access easement, utility and maintenance agreement. This agreement can then cover both access and utilities and replace the current access only easement. PLANNED UNIT DEVELOPMENT WAIVERS The purpose of a Planned Unit Development (PUD) as stated in the City Code is to provide for a more creative and efficient approach to the use of land within the City; to allow variety in the types of environment available to people and distribution of overall density of population and intensity of land use where desirable and feasible; and provide for greater creativity and flexibility in environmental design. The applicant is requesting the following waivers: • Maximum Gross Density- City Code allows a maximum density of 17.4 units per acre in the RM-2.5 zoning district. The applicant is requesting a waiver to allow a density of 27.7 units per acre. At the completion of Phase II, there will be a total of 105 units on the property. The proposed density is consistent with the Medium High Density Residential guiding. • Covered Parking – City Code requires 1 parking stall for every 4 beds plus 1 stall for each employee on the largest work shift with ½ of the required parking stalls to be enclosed. Phase I of the project requires 13 parking stalls. Phase I will utilize the existing parking lot with 81 stalls. Phase I and II together requires 38 parking stalls. The Plan includes 38 parking stalls. The Phase I and II plans comply with the parking requirements except for the enclosed parking. The proposed project does not include any enclosed parking for Phase I or II. The applicant is requesting a waiver from this standard. In these types of facilities, the residents don’t drive a car. The operator of the facility provides on-call mobility services for transportation. The parking for staff, visitors, vendors, and personnel is short term and there is no need for covered parking. • Building Height – City Code allows a maximum building height in the RM-2.5 zoning district of 45 feet. The proposed 4-story addition is 47’- 4 ¼”. The applicant is proposing bump out features on the addition that have a curved parapet to mimic the barrel roofs on the existing building. This feature increases the proposed building height by that 2’- 4 ¼”. The waiver would allow the taller parapet. • Parking Lot Island Size – City Code requires parking lot islands to be a minimum of 160 square feet. The landscaped portion of the island at the south end of the first parking row on the west side of the addition is only 53 square feet. The waiver allows the sidewalk and pedestrian ramp to serve those who park in the parking lot on the west side of the building. Staff Report – Baker Road Assisted Living Page 4 4 BUILDING ARCITECTURE AND MATERIALS The applicant is utilizing the existing building for Phase I. The building material is brick and glass with a minimal amount of metal. The building complies with the building material requirements. The Phase II building addition blends with the existing building. The architectural plans incorporate similar building material as the existing building, façade articulation to visually reduce the perceived height of the addition, similar window repetition as the existing building, a curved form at the top of the bump outs to mimic the barrel roof form and incorporate similar site features around the entire site to create a unified project. The Phase II building addition complies with City Code. The building materials include brick, glass and fiber cement panels and each façade complies with the building material requirements. The fiber cement panels are allowed as a Class I material in the RM-2.5 zoning district, but it should not be the primary building material. Brick and glass are the primary building materials on the building addition. Staff Report – Baker Road Assisted Living Page 5 5 City Code requires buildings that are 4 stories or taller to be designed so that the first two floors are visually distinct from the upper floors. The color change and the use of a soldier course of brick sets the first two stories apart from the rest of the building. The dark red brick at the bottom and the darker cornice along the top of the addition helps create a strong visual bottom, middle, and top to the building. The cornice color is very similar in tone with the upper brick and fiber cement. Staff recommends using a darker tone or a different color for the cornice accent. The south façade closest to the residential uses to the south includes a variety of building materials and color changes, façade articulation and windows. This provides visual variety and lowers the perceived height of the building. TREE REPLACEMENT AND LANDSCAPING The Phase I improvements will require the loss of one canopy tree near the main entrance to the building. The applicant is proposing to replace the canopy tree with 3 Black Hills Spruce trees on the east side of the new sidewalk to the main entrance to the building. These 3 trees must be added during Phase I. The Phase II building addition requires 165 caliper inches of landscaping. The plan includes 165 caliper inches of landscaping. In addition to trees, the landscaping includes many shrubs, ornamentals grasses and flowering perennials to create a complete landscape treatment. The Phase II improvements will require the loss of more trees than Phase I because the area to the west of the existing building is heavily wooded. Phase II requires 48 caliper inches of tree replacement. The plan includes 73 caliper inches of tree replacement and complies with the requirements. Given the grade changes between the industrial property to the west and the subject property and the wooded nature of the slopes, the industrial uses are not likely to see much of the proposed development. Although there is existing vegetation between the residential uses to the south and the subject property, the project will be visible because the building addition comes much closer to the south property line than the existing building and it is 4 stories tall. The applicant is proposing additional landscape screening along the south property line where there are gaps in the existing vegetation. The plan includes a mix of evergreen trees, deciduous trees and shrubs. Most of the existing vegetation along the south and west property lines will be retained. TRAFFIC The applicant provided the City with a traffic memorandum. The consultant’s review of trip generation numbers indicates that the Phase I assisted living facility and Phase I and II build-out with assisted living and dementia care will generate fewer peak hour vehicle trips than the existing office use. Upon the completion of Phase I and II build out, the use (assisted living and memory care) will generate 56 more daily trips than the office use. Staff Report – Baker Road Assisted Living Page 6 6 Trip Generation Information Use AM Peak Hour PM Peak hour Daily Trips Existing Office Use 27 26 194 Phase I (Assisted Living Facility) 6 8 83 Phase I and II Build Out (Congregate Care Facility) 9 20 250 Based on the trip generation information and their analysis, the consultant concluded that the traffic generated by the proposed use will not adversely impact the operation of the site access or the roadway network serving the proposed development. USABLE OPEN SPACE City Code requires 150 square feet of usable open space per unit. The plan as proposed exceeds the requirement for Phase I and for the ultimate build out of Phase I and II. For Phase I, the plan requires 3,600 and provides 5,850 square feet of usable open space or 244 square feet per unit. The usable open spaces are programmed consistent with the intended users of the space. This includes the entry plaza, the deck, a new patio and sidewalk plus indoor gathering spaces such as activity areas, the dining room, and lobby area. Phase I and II requires 15,750 square feet of usable open space. The plan provides 20,011 square feet of usable open space or 190 square feet per unit. This includes the outdoor spaces provided in Phase I plus a second patio, a rooftop deck, and a sidewalk around the south and west sides of the building. The indoor gathering spaces include additional activity areas and lobby area. STORMWATER MANAGEMENT Stormwater is managed through an underground infiltration BMP. The BMP, which consists of underground chambers that will retain stormwater runoff for treatment, will be installed with Phase II of construction. The stormwater management system will be privately maintained. The City’s NPDES Phase II stormwater permit requires a legal mechanism between the City and the owners of structural stormwater best management practices (BMPs) that are not owned or operated by the City. The legal agreement must allow the City to inspect, maintain and assess costs for any maintenance (as necessary) if the BMPs are not functioning properly. Because this development proposes BMPs that will not be owned or operated by the City, the City requires that an “Inspection and Maintenance Agreement for Private Stormwater Facilities” be executed as part of the development agreement. This agreement includes the required provisions of the stormwater permit, identifies any privately owned and operated BMPs and areas requiring street sweeping, as well as provide inspection and maintenance checklists for private stormwater BMPs. AFFORDABILITY The applicant will provide more than 15% of the affordable dwelling units in Phase I and II to households at Staff Report – Baker Road Assisted Living Page 7 7 or below 60% AMI. Staff has had preliminary discussions with developer about its high rate of clients using the Elderly Waiver and about counting the acceptance of Elderly Waivers toward the city's Inclusionary Housing Ordinance. The ordinance requires, as one developer option, having at least 10% of units affordable to households earning 50% or less of the Area Median Income. As the elderly waiver program uses a percent of poverty income threshold rather than an AMI, staff will work with developer to ensure that the poverty threshold is lower than 50% of AMI. Staff will also work with developer to ensure that an appropriate rent level is set, most likely 60% of AMI, to suit the tenant contributions which include both rent and certain services. These will be established in more detail in the development agreement. LIGHTING Phase I of the project will utilize the existing parking lot lighting. The existing lighting complies with the lighting requirements. Phase II includes new parking lot lighting and wall packs on the buildings. The Phase II lighting plan complies with City Code. NATURAL FEATURES There is a wetland on the far east edge of the property. The wetland has been delineated and the applicant is providing the wetland buffer as required by the Watershed District. STEEP SLOPES The property has rolling terrain with significant grade changes on the west ½ of the site. The slopes meet the definition of steep slopes in City Code. The Phase II development will impact some of these steep slope areas. Development in these areas requires a permit from the City Council. Approval of the project by the City Council will constitute approval of a Steep Slope Permit. PARKING LOT ISLAND REQUIREMENTS Phase I of the project will utilize the existing parking lot. The parking lot is compliant with respect to the percentage of the parking lot in islands, but it does not comply with the number of parking lot islands required. City Code requires 1 parking lot island every 20 parking stalls. For Phase I, this would result in the addition of 2 parking lot islands. Since the parking lot will be removed when Phase II is started, installing the islands now is not practical. Instead, staff recommends the City collect and hold a security for the installation of the islands should Phase II not happen. This will be addressed in the Development Agreement. SIGNS The applicant is proposing an on-premise monument sign near the entrance to the parking lot along the shared drive on the project site. The sign conforms to City Code, but the sign does need approval of a separate permit. There is an existing monument sign at the shared entrance to both properties from Baker Road. The sign includes tenant names for both 6200 and 6216 Baker Road. The applicant is proposing to update the sign with the name of the assisted living facility. This sign may not be expanded in size with that information included. Staff Report – Baker Road Assisted Living Page 8 8 UTILITIES There are private sanitary sewer and water lines that extend into the site from Baker Road and serve the existing office building. Phase I will utilize the existing services. The Phase II improvements will include a relocation of these private lines to accommodate the underground stormwater management chambers and serve the Phase I building and the new addition. SUSTAINABILITY The applicant is proposing a number of sustainable features as listed below: Phase I Adaptive reuse of an office building structure Specify energy efficient WaterSense fixtures Specify low VOC paints, adhesives, sealants, and flooring Phase II Utilize Xcel Energy’s Design Assistance Program to identify energy and cost savings strategies Include electric vehicle charging for two vehicles (5%) with infrastructure provided for an additional 11 vehicles (30%) Specify energy efficient WaterSense fixtures Specify low VOC paints, adhesives, sealants, and flooring NEIGHBORHOOD MEETING The applicant held a neighborhood meeting on Wednesday, April 26, 2023 from 7:00 pm to 9:00 pm at the existing office building. The meeting was attended by the development team including the Midwest Residential applicant and their operations director, building owner, principal architect, project management architect. Site plans were displayed for both Phase I and Phase II developments, along with building elevations and exterior renderings. Two neighbors from the townhome properties to the south attended the open house, including a representative of the homeowner’s association and a longtime resident who has recently retired from healthcare services. Discussion items included the expected resident-to-staff ratio, operations in transitioning from the Owner’s current residential-based care model to a centralized community model, expected amount of site activity once the development is stabilized, and aspects of the site in general regarding lot coverage and wildlife known to roam the site. STAFF RECOMMENDATION Recommend approval of the following requests: • Guide Plan Change from Office to Medium High Density Residential on 3.79 acres • PUD Concept Plan Review on 3.79 acres • PUD District Review with waivers on 3.79 acres Staff Report – Baker Road Assisted Living Page 9 9 • Zoning Change from Office to RM-2.5 on 3.79 acres • Site Plan Review on 3.79 acres This is based on plans submitted on April 28, 2023, staff report dated May 22, 2023 and the following conditions: 1. Prior to the 1st reading before the City Council, the applicant shall: A. Revise the Overall Tree Schedule to include the ornamental trees. Somehow the ornamental trees are missing from the schedule. B. It appears that the Dakota Pinnacle Birch are counted as having a caliper inch size of 2.5, yet the Overall Tree Schedule lists it as 1.75 caliper inches. If it is counted as a canopy tree, the minimum size must be 2.5 caliper inches in the table. Please revise the Overall Tree Schedule accordingly. C. Revise the Landscape Plan to show the wetland buffer. D. The Phase I improvements include adding a new generator and an enclosure. The Removal Plan should be revised to show the generator and enclosure and its removal. E. For Phase I, verify proper separations between potential occupancies at open stairway. F. Revise the details for the trash and generator enclosure for Phase II to include a roof. G. Revise the plans to include a darker color for the cornice and accent. 2. Prior to land alteration permit issuance, the applicant shall: A. Include connection of existing roof drainage to underground system. B. Submit detailed storm water runoff, wetland, utility, street and erosion control plans for review and approval by the City Engineer. C. Submit a landscaping letter of credit or escrow surety equivalent to 150% of the cost of the landscaping. D. Obtain and provide documentation of Watershed District approval. E. Notify the City and Watershed District 48 hours in advance of grading. F. Install erosion control at the grading limits of the property for review and approval by the City. G. Submit a land alteration bond, letter of credit, or escrow surety equivalent to 125% of the cost of the land alteration. H. Submit a wetland protection bond, letter of credit, or escrow surety equivalent to 150% of the wetland plan requirements included in the Development Agreement. 3. Prior to building permit issuance for the property, the applicant shall: A. Provide a conservation easement over the wetland and wetland buffer prior to issuance of the building permit for Phase I. B. Submit a Wetland Buffer Strip Evaluation Report (City Code Section 11.51, Subd. 6C) prior to the issuance of a building permit for Phase I. C. Pay the appropriate cash park fees. Cash park fees shall be paid for 24 units prior to the issuance of the building permit for Phase I. The applicant shall pay cash park fees for 81 Staff Report – Baker Road Assisted Living Page 10 10 units prior to the issuance of a building permit for Phase II. The developer will get credit for the cash park fees paid in 1996. D. Provide recorded copies of any Home Owner Association documents or private covenants and agreements to the City following recording of the final plat. E. Submit a Cross Access, Utility and Maintenance Agreement for review and approval by the City Engineer. Once the agreement is filed with the County, provide a copy to the City. 5. The following waivers have been granted through the PUD District Review for the project as indicated in the plans stamp dated April 28, 2023. A. Maximum Gross Density- City Code allows a maximum density of 17.4 units per acre in the RM-2.5 zoning district. The applicant is requesting a waiver to allow a density of 27.7 units per acre. At the completion of Phase II, there will be a total of 105 units on the property. The proposed density is consistent with the Medium High Density Residential guiding. B. Covered Parking – City Code requires 1 parking stall for every 4 beds plus 1 stall for each employee on the largest work shift with ½ of the required parking stalls to be enclosed. Phase I of the project will include 25 parking stalls on the site but cannot accommodate covered parking on the site. Phase I and II together requires 38 parking stalls. The plan complies with the parking requirements except for the enclosed parking. The proposed project does not include any enclosed parking for Phase I or II. The applicant is requesting a waiver from this standard. In these types of facilities, the residents don’t drive a car. The operator of the facility provides on-call mobility services for transportation. The parking for staff, visitors, vendors, and personnel is short term and there is no need for covered parking. C. Building Height – City Code allows a maximum building height in the RM-2.5 zoning district of 45 feet. The proposed 4-story addition is 47’- 4 ¼”. The applicant is proposing bump out features on the addition that have a curved parapet to mimic the barrel roofs on the existing building. This feature increases the building height by 2’- 4 ¼”. The waiver would allow a taller parapet. D. Parking Lot Island Size – City Code requires parking lot islands to be a minimum of 160 square feet. The landscaped portion of the island at the south end of the first parking row on the west side of the addition is only 53 square feet. The waiver allows the sidewalk and pedestrian ramp to serve those who park in the parking lot on the west side of the building. Memorandum Project: Baker Road Assisted Living 6216 Baker Road, Eden Prairie, Minnesota Project No.: 22.60.06 Date: March 29, 2023 To: Department of Community Development City of Eden Prairie By: Michael D. Knisely Subject: Project Narrative General Midwest Residential currently operates multiple residential properties in Minnesota to provide care for aging adults with general assistance needs and for those with physical and mental challenges. It is their intention to consolidate these sites and expand services and help manage staffing for their various communities. A centralized assisted living community will enable Midwest Residential to offer their residents a choice between communal living and more private assisted care. Midwest is seeking a more efficient means of caring for aging residents in a beautiful, natural setting in Eden Prairie. The existing 2-story office building and the buildable land on Baker Road and County Road 62 provides this opportunity. The existing office building was permitted for construction in 1996, with current ownership recorded in 2007. Over the past several years, the building owner has experienced difficulty in leasing office space. It is believed that the combination of office market conditions and the secluded location of the building has contributed to this slowing of lease activity. For the Applicant, this shift in the office market and the quiet character of the building and site, offers an opportunity to meet their goal of centralizing care operations. Additionally, because of the Applicant's position in the home care market, they have seen a need for assisted living based on their model of care. They expect many of their current residents will be the initial occupants of this new community. Comprehensive Plan and Zoning The applicant is proposing an amendment to the Comprehensive Plan (Office to Medium Density Residential) and rezoning from Office to Multi-Family Residential RM-2.5 as the guiding zone for a Planned Unit Development. Adjacent to the Development is office to the east, industrial to the west, and residential (RM-2.5) to the south. County Road 62 forms the north boundary, and access is off Baker Road via a shared drive that connects to the adjacent office at 6200 Baker Road. A recorded easement is in place for this access drive across 6200 Baker. Project Narrative Baker Road Assisted Living - 6216 Baker Road, Eden Prairie, Minnesota March 29, 2023 Page 2 of 4 Requested Waivers The Applicant seeks approval for the proposed Development through the PUD process in order to waive density and parking limits under the guide zoning of RM-2.5. Density Density under RM-2.5 zoning is limited to 17.4 units per acre, whereas the application seeks to increase this to 27.7 units per acre. (Phase I - 24 units, 31 beds. Phase II - 81 units, 81 beds.) While this level of density would be considered high for general housing, it is consistent with densities for assisted living developments. In assisted living communities, units are intended to serve as sleeping rooms and are easily a third the size of typical apartments that can house several people. In the proposed assisted living model, kitchen and living rooms are congregate spaces, and amenities are limited to dining and activity rooms that serve general living needs for all residents. Because of the need for security, even outdoor common spaces and walking areas are limited in scope, unlike what is desired for general housing. Despite an increase in density, the Applicant believes the proposed development will provide a reasonable transition between the industrial and office uses, and be compatible with the residential development to the south by virtue of its low impact and the amount of land that will remain in a natural state. Parking In RM-2.5 multifamily housing, residents are active and normally drive private vehicles - the population is permanent in nature with frequent guests and virtually no staff. While the Residential Multifamily District lists both active senior/independent housing and less active (assisted living and memory care) communities as an approved use, the characteristics of care communities are quite different from those of other listed residential uses. In the care communities of assisted living and memory care occupancies, the typical entry age of residents is over 80; and unlike residents in more active senior and independent housing, with very few exceptions, none of the residents drive vehicles. Staff and part time vendors and personnel represent the bulk of parking needs. Additionally, residents are provided transportation by way of on-call mobility services and by management and through their caregivers. Unlike what is needed for longer term residents, staff and visitor parking is short term used more frequently. Discussing the operations with the owner and management, enclosed parking is something that would not be used. Development Phases Phase I will consist of remodeling the existing 17,151 square foot, two-story office building to provide up to 31 beds for elderly residents in need of assisted living services. Construction is expected to begin by Q3 of 2023. No building additions are planned to reposition the office building for this new use, although a new window, entrance canopy and common area patios are proposed. Rooftop mechanical units will be used for space heating and cooling, with existing ribbed metal rooftop equipment screens to remain. Phase II will consist of a 4-story, 53,233 square foot addition that will provide up to 81 beds of assisted living. A construction schedule for Phase II has not yet been determined. When built, it is expected that the original Phase I building will then be licensed to provide care for residents in need of dementia care. An improved resident drop off area is proposed that will serve both building Project Narrative Baker Road Assisted Living - 6216 Baker Road, Eden Prairie, Minnesota March 29, 2023 Page 3 of 4 entrances once fully constructed. As proposed for Phase I, rooftop mechanical equipment will be used for space heating and cooling, with equipment screens matching those on the existing office building. Each phase of the development will include dining and activity areas, controlled outdoor open spaces, resident sitting areas, central kitchen, and support offices. Phase II is planned with a bonus roof deck area above the entry doors that will connect to the second floor indoor activity space. Food will be prepared in a central kitchen and delivered to dining/activity areas in the buildings. Snack areas will be provided at each of these common areas as well. Core staff is expected to be five, with an additional five once Phase II is occupied. The number of other non-staff personnel for food preparation and outside medical and other services will vary throughout the day, with no more than six expected at any time. Given the building's natural setting and homestyle care model, it is hoped that the number of visitors will exceed the Applicant's expectation that fewer than a half dozen visitors will be on site at any given time. The exterior character of the new Phase II building is intended to be compatible with the original office building, using the same size, color, and texture of the original brick (which is still available) supplemented with prefinished fiber cement panels and complimentary brick to provide a 3-part façade. Aluminum windows and common area storefront glazing for much of the building will match that of the office building, providing ample natural light for resident's quarters and other interior spaces. A canopy is planned for each building for shaded waiting area and weather cover up to the main entrance doors. Green Infrastructure Analysis: See the Civil Documents and the stormwater report. Stormwater Management and Wetland: Phase II stormwater management will be facilitated by a new underground infiltration structure that flows to the adjacent wetland. It is proposed that the office building maintain current rainwater discharge at grade, with the exception that one leader be relocated so as to allow it to be easily connected to the underground stormwater system constructed under Phase II as shown on the Drawings. A wetland has been delineated within a platted easement that occupies a portion of the Development site. The wetland buffer is variable, but subject to certain minimum requirements, so as to not be encroached by site improvements. The buffer is indicated on the Drawings submitted for this Application. It is understood that snow storage will be on any available area on site and removed as needed to prevent reduction of parking and/or storage in the wetland buffer. Endangered, Threatened, or Special Concern Species A search of the DNR Conservation Planning database indicates a strong likelihood the Rusty Patched Bumble Bee (RPBB) is in the overall vicinity and is presumed to be present on the site. See the attached DNR Conservation Planning Report for this site. Project Narrative Baker Road Assisted Living - 6216 Baker Road, Eden Prairie, Minnesota March 29, 2023 Page 4 of 4 Voluntary measures are proposed to improve local habitat in an effort to mitigate bee population stressors when they complete wintering and begin active nesting. Bee nesting commences April 10; wintering begins October 10. Phase I: Construction activity largely contained inside the building with refuse and construction traffic contained on paved areas of the site. Phase II: Create habitat and limit disturbance of the site in several ways:  The proposed new building is rotated to minimize disturbance of unimproved land,  Construction will be generally contained within the retaining walls with construction limits well defined by marking and erosion control fencing,  Woodland flowering plants that are favored by the bumble bees are proposed on land disturbed at the perimeter of the retaining walls,  Cleared brush and removed plant materials are proposed to be placed in defined areas on site to create additional habitat for bees during nesting activities. Snow & Salt Management Plans Snow storage will be provided where indicated on the Drawings. Salt storage, if any, will be provided for walk areas around the buildings and be kept in an enclosed and roofed storage/receiving area accessed by the service drive on the West side of the proposed Phase I building. Affordability Plan The developer will provide more than 15% of affordable dwelling units to households at or below 60% of Area Median Income (AMI) for both Phase I and Phase II developments. We understand that the Z-Sustainable Features Sustainable features will be incorporated into the proposed Development as follows: Phase I: Adaptive reuse of office building structure  Energy efficient WaterSense fixtures will be specified  Low VOC paints, adhesives, sealants, and flooring will be specified Phase II: New construction based on Multi-Family Residential  Xcel Energy's Energy Design Assistance Program to identify energy and cost savings strategies  Electric Vehicle Charging for 2 vehicles (5%) with infrastructure provided for an additional 11 vehicles (30%)  Energy efficient WaterSense fixtures will be specified  Low VOC paints, adhesives, sealants, and flooring will be specified End of Narrative P ET A E G S Eden Prairie - Ladder Custom(c) 2023 Transoft Solutions, Inc. All rights reserved. Eden Prairi e - L a d d e r Custom (c) 2023 Transoft Solutions, Inc. All rights reserved. 1385 26 . 0 ' 36.0' Ed g e o f C a t t a i l s Pond Ed g e o f W a t e r Guard Rail De c k FFE=963.09 2 Story Brick Building Foundation Area = 8,735 Sq. Ft. +/- 62ND ST W E S T (COUNTY R O A D N O . 6 2 ) (A Public R/ W ) (Width Varies ) 10 10 10 5 10 10 10 10 5 5 5 125.79 Δ=3°52'30" R=1859.86 N87°57'16"W 211.48 S0 0 ° 2 0 ' 5 5 " W 4 0 5 . 4 8 S87°57'16"E 407.01 N0 2 ° 0 6 ' 1 0 " E 3 7 8 . 1 4 N79°20'56" W 8 3 . 9 5 BLOCK 1 BL O C K 1 BL O C K 1 PID: 0311622120446 Address: 6216 Baker Road PID: 0311622120447 Address: 6200 Baker Road Owner: Leonard/Havir LLC PI D : 0 3 1 1 6 2 2 2 1 0 0 1 2 Ad d r e s s : U n a s s i g n e d Ow n e r : C i t y o f E d i n a PI D : 0 3 1 1 6 2 2 2 1 0 0 1 9 Ad d r e s s : 6 2 0 1 B u r y D r i v e Ow n e r : R o o s e v e l t 3 0 1 L L C PID: 0311622210021 Address: 6251 Bury Drive Owner: Westwood Eden Prairie LLC 1014 1015 1047 1048 1049 1050 1062 1063 1078 1110 1123 1124 12531254 1260 1261 1262 1263 1264 1265 1266 1267 12681269 1270 1271 1273 1274 127512761277 1279 1280 1281 1282 1283 1284 1285 1286 1288 1289 1290 1291 1292 1293 1296 1298 1299 1300 1301 1303 1304 1305 1307 13081309 1311 1313 1314 1315 1316 1317 1319 1334 1335 1336 1337 1338 1341 1342 1343 1365 1373 1374 1375 1376 1377 1378 1379 1380 13811382 1383 1384 1386 1387 1388 13901391 1393 1394 1395 1396 1402 1403 1404 1405 1406 1407 1408 1409 1411 1412 1413 1414 1415 1416 1417 1418 14191420 1421 1422 1423 1426 1360 1427 1429 1430 1431 1433 1434 1435 1436 1437 1438 1439 1440 1441 1442 1443 1444 1446 1447 1448 14491450 1451 14521453 1454 1455 1463 1464 1465 1467 14681469 1470 1471 1472 1473 1474 1476 1477 14781479 1504 1505 1506 1507 1508 1509 1510 15111512 1513 1514 1515 1516 1517 1518 1520 1521 1522 1523 1524 1525 1526 1527 1528 1529 Ga s L i n e (A p p r o x . P e r M a p ) LOT 1 OU T L O T A LO T 1 LO T 1 5 4 5 2 7 3 6 8 9 10 11 12 14 14 17 18 19 5 5 5 20 NEW 10 40 4 21 12 EDGE OF WETLAND PER DELINEATION REPORT PERFORMED BY WENK ASSOCIATES,OCT 2019 PROPOSED WETLAND BUFFER ZONE 13 NEW NEW 22 22 19 ISLAND AREA: 355SF ISLAND AREA: 361SF 19 5 5 18 18 12 15 1 6126 BAKER ROAD ADULT COMMUNITY BLACK ANODIZED ALUMINUM METAL PANEL LASER CUT W/ INTERNALLY ILLUMINATED COPY ON 1 SIDE BOX PROVIDED BY SIGN CONTRACTOR SIGN RECEIVER CHANNEL BRICK TO MATCH BLDG1' - 6 " 7' - 0" 5' - 8 " A B V G R A D E 24 SF SIGNAGE AREA, APPROX 6'-0"x4'-0" PROJECT NO:PROJECT NO: 64 4 2 C I T Y W E S T P A R K W A Y 64 4 2 C I T Y W E S T P A R K W A Y SU I T E 3 0 0 S U I T E 3 0 0 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 PH : 9 5 2 - 9 9 6 - 9 6 6 2 PH : 9 5 2 - 9 9 6 - 9 6 6 2 WW W . S R A - M N . C O M WW W . S R A - M N . C O M CO P Y R I G H T 2 0 2 0 CO P Y R I G H T 2 0 2 0 SP E R I D E S R E I N E R S A R C H I T E C T S , I N C SP E R I D E S R E I N E R S A R C H I T E C T S , I N C CC DRAWN BY:DRAWN BY:CHECKED BY:CHECKED BY: PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N SR a AR C H I T E C T U R E + I N T E R I O R S 4/28/2023 2:33:00 PM DLK,SWK MDK, DLK 22-098 A0 BA K E R R O A D AS S I S T E D L I V I N G SITE PLAN 62 1 6 B A K E R R O A D ED E N P R A I R I E , M N 5 5 3 4 6 SCALE: 1" = 20'-0"A0 1 SITE PLAN SCALE: 1/2" = 1'-0"A02 MONUMENT SIGN 0 10'20'40' SCALE: 1" = 20'-0" IS S U E R E C O R D IS S U E # DA T E DE S C R I P T I O N NORTH APPROX LOCATION OF EXISTING OFF SITE MONUMENT SIGN EXISTING OFF SITE MONUMENT SIGN PLAN - NTS NORTH 1. 2. 3. 4. 5. 6.7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21.22. NEW ENTRANCE CANOPY AND BRICK SUPPORT COLUMN REMOVE ENTRY WALK AND PROVIDE NEW WALK AS SHOWN NEW CONC PATIO. REMOVE PORTION OF EXISTING WALK AND TIE TO REMAINING CHIP AND SEAL ENTIRE DRIVE AND PARKING LOT. RESTRIPE AREA LIGHT POLE TO REMAIN. PROPOSED NEW LIGHT HEAD. SEE PHOTOMETRIC PLAN NEW MONUMENT SIGN. SEE DETAIL THIS DRAWINGNEW TREES TO REPLACE REMOVED 12" Ø OAK TREE #1385. NEW TREES: (3) BLACK HILLS SPRUCE/PICEA GLAUCA 'DENSATA' (6' B&B ) EXISTING CONC WALK EXISTING REFUSE/RECYCLE ENCLOSURE SERVICE DRIVE EXISTING ELEVATED DECK ELECTRICAL TRANSFORMER EXISTING GARDEN COURT - IMPROVED WITH NEW CONCRETE PATIO EXISTING BOULDER RETAINING WALLS PROVIDE EROSION CONTROL MEASURES AT STORM PIPE DISTURBANCE THIS AREA - not used - NEW MASONRY ENCLOSURE FOR NEW GENERATOR. NO PARKING CLEARANCE FOR FIRE TRUCK TURNING REMOVED LIGHT POLE & BASE & NEW LIGHT POLE AND BASE NEW 48" HIGH ALUMINUM FENCERAIN WATER LEADER TO SPLASHBLOCK ON GRADE SITE PLAN KEYNOTES 1.EXISTING LANDSCAPED AREAS WITHIN 12 FEET OF THE BUILDING SHALL BE PRUNED, TRIMMED, CLEANED, AND CLEARED OF DEAD PLANTS, WEDS, AND DEBRIS. 2.SOIL, MULCHED AREAS, OR SOD THAT IS DISTURBED DURING CONSTRUCTION SHALL BE REPLACED IN KIND. 3.TREAT PLANT MATERIALS FOR PEST AND DISEASES AS NEEDED. 4.PLANTINGS THAT ARE PRUNED SHALL BE TRIMMED SUFFICIENTLY TO MAINTAIN APPEARANCE. LANDSCAPE NOTES 0 1'-0"2'-0"4'-0" SCALE: 1/2" = 1'-0" 1.PROVIDE EROSION CONTROL DEVICES AS REQUIRED AT DESURBED AREAS. 2.PROTECT SLOPES AND STORM SYSTEMS FROM EROSION SEDIMENT WITH FABRIC SYSTEMS. EROSION CONTROL NOTES UP UP DN DN STORAGE RECEIVING MACINEROOM LOBBY VESTIBULE SPRINKLER VALVE DUMPSTER 10' - 0"53' - 4"30' - 0" 93' - 4" 26 ' - 0 " 60 ' - 0 " 24 ' - 0 " 34 ' - 0 " 35' - 4"29' - 4"13' - 4" ELEVATOR RECEPTION ACTIVITY SUPPORT COMM.KITCHEN SINGLE SINGLE SINGLE DOUBLE. DINING SINGLE SINGLE SINGLE DOUBLE D0UBLE BATH BATH BATH BATH BATH NORTH 14 4 ' - 0 " SUPPORT DECK 22 ' - 0 " 62 ' - 0 " 60 ' - 0 " WALL ABOVE WALL ABOVE WALL ABOVE WALL ABOVE WALL ABOVE 93' - 4" 34 ' - 0 " 24 ' - 0 " 60 ' - 0 " 26 ' - 0 " 35' - 4"29' - 4"13' - 4" ELEVATOR NORTH 14 4 ' - 0 " SINGLE SINGLE SINGLE SINGLE SINGLE DOUBLE D0UBLE BATH BATH BATH BATH DOUBLE SINGLE DOUBLE SINGLE SINGLE BATH BATH BATH BATH BATH BATH SINGLE SINGLE SINGLE SINGLE BATH BATH BATH 22 ' - 0 " 62 ' - 0 " 60 ' - 0 " 10' - 0"53' - 4"30' - 0" CANOPY BELOW PROJECT NO:PROJECT NO: 64 4 2 C I T Y W E S T P A R K W A Y 64 4 2 C I T Y W E S T P A R K W A Y SU I T E 3 0 0 S U I T E 3 0 0 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 PH : 9 5 2 - 9 9 6 - 9 6 6 2 PH : 9 5 2 - 9 9 6 - 9 6 6 2 WW W . S R A - M N . C O M WW W . S R A - M N . C O M CO P Y R I G H T 2 0 2 0 CO P Y R I G H T 2 0 2 0 SP E R I D E S R E I N E R S A R C H I T E C T S , I N C SP E R I D E S R E I N E R S A R C H I T E C T S , I N C CC DRAWN BY:DRAWN BY:CHECKED BY:CHECKED BY: PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N SR a AR C H I T E C T U R E + I N T E R I O R S 4/28/2023 8:43:36 AM DLK, SWK MDK, DLK 22-098 A1 BA K E R R O A D AS S I S T E D L I V I N G PHASE 1 FIRST/SECOND FLOOR PLAN 62 1 6 B A K E R R O A D ED E N P R A I R I E , M N 5 5 3 4 6 SCALE: 1/8" = 1'-0"A11 PHASE 1 GROUND LEVEL FLOOR SCALE: 1/8" = 1'-0"A12 PHASE 1 SECOND LEVEL FLOOR04'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" BUILDING DATA - EXISTING BUILDING CONVERSIONCONDITIONED SF EA FLOOR:1ST FLOOR 8,735 SF2ND FLOOR 8,213 SF16,948 SF OCCUPANCY: I-1, CONDITION 2CONSTRUCTION TYPE:IIB ALLOWABLE AREA (TABULAR):30,000 SF PER FLOORFULLY SPRINKLERED NFPA13 UNITS:24BEDS:31 IS S U E R E C O R D IS S U E # DA T E DE S C R I P T I O N 20 0 ' - 0 " 23 ' - 0 " 9' - 0 " 15 3 ' - 8 " 14 ' - 4 " 56' - 0"8' - 0"22' - 0" 28' - 0"8' - 0"52' - 4" 88' - 4" 60 ' - 4 " 81 ' - 8 " 14 ' - 4 " NORTH SINGLE EXIT STAIR SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE ADMIN LOBBY VESTIBULE MECH EXIT STAIR ELEV ACTIVITY 1 BEDROOM SINGLE 1' - 8" CONNECTION TO PHASE 1 BUILDING INFILL EXISTING WINDOW OPENINGRECEIVING PHASE 1 ASSISTED LIVING BUILDING 23 ' - 0 " 9' - 0 " 43 ' - 6 7 / 8 " 28 ' - 2 1 / 4 " 29 ' - 1 3 / 4 " 28 ' - 2 1 / 4 " 24 ' - 6 7 / 8 " 14 ' - 4 " 20 0 ' - 0 " 1' - 8" 1' - 4"56' - 0"8' - 0"1' - 1 1/8"22' - 6 7/8" NORTH 89' - 0" 14 ' - 4 " 24 ' - 6 7 / 8 " 28 ' - 2 1 / 4 " 29 ' - 1 3 / 4 " 28 ' - 2 1 / 4 " 12 ' - 2 1 / 2 " 64 ' - 4 3 / 8 " 20 1 ' - 0 " 28' - 0"8' - 0"52' - 4" 88' - 4" SINGLE EXIT STAIR SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE EXIT STAIR ELEV ACTIVITY 1 BEDROOM SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE SINGLE ROOF DECK CANOPY BELOW PROJECT NO:PROJECT NO: 64 4 2 C I T Y W E S T P A R K W A Y 64 4 2 C I T Y W E S T P A R K W A Y SU I T E 3 0 0 S U I T E 3 0 0 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 PH : 9 5 2 - 9 9 6 - 9 6 6 2 PH : 9 5 2 - 9 9 6 - 9 6 6 2 WW W . S R A - M N . C O M WW W . S R A - M N . C O M CO P Y R I G H T 2 0 2 0 CO P Y R I G H T 2 0 2 0 SP E R I D E S R E I N E R S A R C H I T E C T S , I N C SP E R I D E S R E I N E R S A R C H I T E C T S , I N C CC DRAWN BY:DRAWN BY:CHECKED BY:CHECKED BY: PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N SR a AR C H I T E C T U R E + I N T E R I O R S 4/28/2023 8:43:37 AM DLK, SWK MDK, DLK 22-098 A2 BA K E R R O A D AS S I S T E D L I V I N G PHASE 2 FIRST/SECOND FLOOR PLAN 62 1 6 B A K E R R O A D ED E N P R A I R I E , M N 5 5 3 4 6 SCALE: 1/8" = 1'-0"A2 1 PHASE 2 GROUND FLOOR SCALE: 1/8" = 1'-0"A2 2 PHASE 2 SECOND, THIRD & FOURTH FLOOR04'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" BUILDING DATA - EXISTING BUILDING CONVERSIONSF EA FLOOR:1ST FLOOR 13,850 SF2ND FLOOR 13,689 SF3RD FLOOR 12,889 SF4TH FLOOR 12,889 SF53,317 SF OCCUPANCY: I-1, CONDITION 2CONSTRUCTION TYPE:IIB ALLWOABLE AREA (TABULAR):30,000 SF PER FLOORFULLY SPRINKLERED NFPA13 UNITS:81BEDS:81 IS S U E R E C O R D IS S U E # DA T E DE S C R I P T I O N GROUND FLOOR100' - 0" UPPER LEVEL FLOOR111' - 9" T.O. LOW PARAPET126' - 4" T.O. ROOF133' - 7 11/16" T.O. HIGH PARAPET127' - 4" 3 6 5 4 TYP. 1 TYP. 2 A3 5 8 GROUND FLOOR100' - 0" T.O. LOW PARAPET126' - 4" SECOND FLOOR 111' - 9" T.O. ROOF 133' - 7 11/16" T.O. HIGH PARAPET127' - 4" 3 4 TYP.3 2 1 TYP. NEW 9 GROUND FLOOR100' - 0" T.O. LOW PARAPET 126' - 4" SECOND FLOOR111' - 9" T.O. ROOF133' - 7 11/16" T.O. HIGH PARAPET127' - 4" 3 4 TYP. 7 2 1 TYP. BEYOND 69 GROUND FLOOR100' - 0" T.O. LOW PARAPET126' - 4" SECOND FLOOR 111' - 9" T.O. ROOF 133' - 7 11/16" T.O. HIGH PARAPET127' - 4" 3 4 TYP. 2 1 TYP. 1 TYP8 10 GROUND FLOOR100' - 0" SECOND FLOOR111' - 9" NEW STRUCTURAL COLUMN WITH BRICK VENEER (BRICK 1) FINISH, CONCEALED RAIN WATER LEADERS EXISTING BRCK BLDG BEYOND EXISTING WDW ENTRY BEYOND GRADE NEW ENTRANCE CANOPY STRUCTURE, PAINTED STEEL AND PREFINISHED SOFFITS 2' - 0" PROJECT NO:PROJECT NO: 64 4 2 C I T Y W E S T P A R K W A Y 64 4 2 C I T Y W E S T P A R K W A Y SU I T E 3 0 0 S U I T E 3 0 0 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 PH : 9 5 2 - 9 9 6 - 9 6 6 2 PH : 9 5 2 - 9 9 6 - 9 6 6 2 WW W . S R A - M N . C O M WW W . S R A - M N . C O M CO P Y R I G H T 2 0 2 0 CO P Y R I G H T 2 0 2 0 SP E R I D E S R E I N E R S A R C H I T E C T S , I N C SP E R I D E S R E I N E R S A R C H I T E C T S , I N C CC DRAWN BY:DRAWN BY:CHECKED BY:CHECKED BY: PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N SR a AR C H I T E C T U R E + I N T E R I O R S 5/3/2023 12:29:53 PM DLK, SWK MDK, DLK 22-098 A3 BA K E R R O A D AS S I S T E D L I V I N G PHASE 1 EXTERIOR ELEVATIONS 62 1 6 B A K E R R O A D ED E N P R A I R I E , M N 5 5 3 4 6 SCALE: 1/8" = 1'-0"A3 1 PHASE 1 SOUTH SCALE: 1/8" = 1'-0"A3 2 PHASE 1 WEST SCALE: 1/8" = 1'-0"A3 3 PHASE 1 NORTH SCALE: 1/8" = 1'-0"A34 PHASE 1 EAST 1.2.3.4.5.6.7.8.9.10. UTILITY SIZE STRUCTURAL BRICKSTANDING SEAM METAL ROOFINGPREFINISHED METAL FASCIA, COPING, AND ROOF EDGECLEAR ANODIZED ALUMINUM STOREFRONT AND ENTRANCE DOORSPAINTED STEEL OVERHEAD DOORPAINTED STEEL REFUSE ENCLOSURE GATESPRECAST CONC WALL CAPNEW PAINTED STEEL ENTRANCE CANOPYNEW AL FRAME AND DOOR W/ GLAZING @ REMOVED HM DOOR & FRAMEEXISTING DECK PHASE I ELEVATION KEY NOTES 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" IS S U E R E C O R D IS S U E # DA T E DE S C R I P T I O N SCALE: 1/2" = 1'-0"A3 5 DETAIL 0 1'-0"2'-0"4'-0" SCALE: 1/2" = 1'-0" GROUND FLOOR100' - 0" T.O, LOW PARAPET143' - 4" FOURTH FLOOR 131' - 9" THIRD FLOOR 121' - 9" SECOND FLOOR 111' - 9" T.O, HIGH PARAPET 144' - 6" PHASE 1 ASSISTED LIVING BUILDING 7 4 4 4 4 TYP. 2 TYP. 7 TYP. 5 TYP. 4 83 1 3 3 2 1 3 A35 SIM 1010 10 10 TY P I C A L BR I C K 2 TY P I C A L BR I C K 1 3' - 8 " 2' - 6 " 147' - 0"147' - 0" 1112 11125 BU I L D I N G H E I G H T 47 ' - 4 1 / 4 " 99' - 7 3/4" AVERAGE GRADE PLANE GROUND FLOOR100' - 0" T.O, LOW PARAPET143' - 4" FOURTH FLOOR131' - 9" THIRD FLOOR121' - 9" SECOND FLOOR111' - 9" PHASE 1 ASSISTED LIVING BUILDING 7 TYP. 4 4 2 3 1 3 3 2 1 3 TYP.TYP. 5 10 10 TY P I C A L BR I C K 1 TY P I C A L BR I C K 2 10 10 147' - 0"147' - 0" 47 ' - 4 1 / 4 " 99' - 7 3/4" AVERAGE GRADE PLANE GROUND FLOOR100' - 0" T.O, LOW PARAPET143' - 4" FOURTH FLOOR131' - 9" THIRD FLOOR121' - 9" SECOND FLOOR111' - 9" T.O, HIGH PARAPET144' - 6" PHASE 1 ASSISTED LIVING BUILDING 7 TYP. 1 7 TYP. 5 TYP.5 TYP. 4 2 2 3 1 3 3 2 1 3 4 TY P I C A L BR I C K 2 10 10 10 10 11125TYP.1112 147' - 0"147' - 0" 99' - 7 3/4" AVERAGE GRADE PLANE4 BU I L D I N G H E I G H T 47 ' - 4 1 / 4 " GROUND FLOOR100' - 0" T.O, LOW PARAPET143' - 4" FOURTH FLOOR131' - 9" THIRD FLOOR121' - 9" SECOND FLOOR111' - 9" PHASE 1 ASSISTED LIVING BUILDING 7 TYP.5 TYP. 4 8 2 3 1 3 3 2 1 3 7 1 6 9 10 10 10 TY P I C A L BR I C K 2 TY P I C A L BR C I K 1 12 12 147' - 0"147' - 0" 99' - 7 3/4" AVERAGE GRADE PLANE BU I L D I N G H E I G H T 47 ' - 4 1 / 4 " PROJECT NO:PROJECT NO: 64 4 2 C I T Y W E S T P A R K W A Y 64 4 2 C I T Y W E S T P A R K W A Y SU I T E 3 0 0 S U I T E 3 0 0 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 ED E N P R A I R I E , M I N N E S O T A 5 5 3 4 4 PH : 9 5 2 - 9 9 6 - 9 6 6 2 PH : 9 5 2 - 9 9 6 - 9 6 6 2 WW W . S R A - M N . C O M WW W . S R A - M N . C O M CO P Y R I G H T 2 0 2 0 CO P Y R I G H T 2 0 2 0 SP E R I D E S R E I N E R S A R C H I T E C T S , I N C SP E R I D E S R E I N E R S A R C H I T E C T S , I N C CC DRAWN BY:DRAWN BY:CHECKED BY:CHECKED BY: PR E L I M I N A R Y NO T F O R CO N S T R U C T I O N SR a AR C H I T E C T U R E + I N T E R I O R S 5/3/2023 12:29:56 PM DLK, SWK MDK, DLK 22-098 A4 BA K E R R O A D AS S I S T E D L I V I N G PHASE 2 EXTERIOR ELEVATIONS 62 1 6 B A K E R R O A D ED E N P R A I R I E , M N 5 5 3 4 6 SCALE: 1/8" = 1'-0"A4 1 PHASE 2 EAST SCALE: 1/8" = 1'-0"A4 4 PHASE 2 NORTH SCALE: 1/8" = 1'-0"A4 2 PHASE 2 WEST SCALE: 1/8" = 1'-0"A4 3 PHASE 2 SOUTH PHASE II ELEVATION KEY NOTES 1.2. 3.4.5.6.7.8.9.10.11.12. BRICK-1: UTILITY SIZE BRICK VENEER - MATCH EXISTING BUILDINGBRICK-2: UTILITY SIZE BRICK VENEER - COMPLIMENTARY COLOR TO EXISTING OFFICE BUILDINGBRICK-3: UTILITY SIZE BRICK VENEER SOLDIER COURSE - MATCH BRICK-2CLEAR ANODIZED ALUMINUM WINDOWS/ENTRANCE DOORSPREFINISHED FIBER CEMENT PANEL WITH JOINT REVEALSPAINTED OVERHEAD DOOR - MATCH ALLURA NATURAL CLAYPREFINISHED METAL FASCIA, COPING, AND ROOF EDGEPAINTED METAL RAILING ABOVE ROOF DECK PARAPETPAINTED STEEL CANOPYFIBER CEMENT ACCENTTRIM COMPONENT - MATCH FIBER CEMENT ACCENTSTANDING SEAM MTL ROOF - MATCH EXISTING BUILDING 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" 0 4'-0"8'-0"16'-0" SCALE: 1/8" = 1'-0" IS S U E R E C O R D IS S U E # DA T E DE S C R I P T I O N EXTERIOR FINISHESBRICK 1 (LOWER BRICK):MATCH EXISTING BUILDING - SUMMIT 450A BONFIREBRICK 2 (UPPER BRICK):BELDEN 8530 VELOUR (3-COLOR BLEND)BRICK 2 SOLDER COURSE DARKEST OF 3-COLOR BLENDFIBER CEMENT PANELSFIELD:ALLURA - SMOOTH - SAVANNAH WICKERACCENT:ALLURA - SMOOTH - NATURAL CLAYWINDOWS & ENTRANCES:CLEAR ANODIZED ALUMINUMMTL COPING/WALL CAPS:MATCH ALLURA NATURAL CLAY BUILDING HEIGHT DATAFINISHED FLOOR ELEVATION:962.91'REF ELEVATION: 100'-0"AVERAGE GRADE PLANE:962.56’REF ELEVATION: 99'-7 3/4"BUILDING HEIGHT:1009.91'REF ELEVATION: 147'-0"BUILDING HEIGHT ABOVE AVERAGE GRADE PLANE:47'-4 1/4" Baker Road Assisted Living Community Eden Prairie, Minnesota 4/28/2023 Baker Road Assisted Living Community Eden Prairie, Minnesota 4/28/2023 North Elevation Baker Road Assisted Living Community Eden Prairie, Minnesota 4/28/2023 West Elevation Baker Road Assisted Living Community Eden Prairie, Minnesota 4/28/2023 South Elevation Baker Road Assisted Living Community Eden Prairie, Minnesota 4/28/2023 East Elevation Baker Road Assisted Living Community Eden Prairie, Minnesota 4/28/2023 [13] Drainage and Utility Easement Per Plat [13] Drainage and Utility Easement Per Plat [13] Drainage and Utility Easement Per Plat 125.79 Δ=3°52'30" R=1859.86 N87°57'16"W 211.48 S0 0 ° 2 0 ' 5 5 " W 4 0 5 . 4 8 S87°57'16"E 407.01 N0 2 ° 0 6 ' 1 0 " E 3 7 8 . 1 4 N79°20'5 6 " W 8 3 . 9 5 Chain Link Fence Stone Retaining Wall 2 Story Brick Building Foundation Area = 8,966 Sq. Ft. +/- PID: 0311622120446 Address: 6216 Baker Road De c k Bituminous 12" R C P (COUNTY R O A D N O . 6 2 ) (A Public R / W ) PID: 0311622120447 Address: 6200 Baker Road Owner: Leonard/Havir LLC Ow n e r : C i t y o f E d i n a Pond (Width Vari e s ) Ed g e o f W a t e r Ed g e o f C a t t a i l s Ga s L i n e (A p p r o x . P e r M a p ) Ed g e o f W e t l a n d p e r De l i n e a t i o n R e p o r t P e r f o r m e d by W e n k A s s o c i a t e s , I n c . , Da t e d O c t o b e r , 2 0 1 9 HWL 951.50 HWL 933.99 WETLAND BUFFER WETLAND BUFFER WETLAND BUFFER 196 SF 396 SF 192 SF 177 SF 53 SF 255 SF 329 SF NO PA R K I N G N O P A R K I N G 10 7 5 88 BOT. OF WALL BOT. O F W A L L BOT . O F W A L L TOP OF WA L L BOT. OF W A L L 18.0'24.0'18.0'4.0' 10.8'TO P O F W A L L TO P O F W A L L TOP OF WALL 10 . 4 ' 11 . 0 ' CONSTRUCTION LIMITS CONSTRUCTION LIMITS EXISTING BUILDING CONSTRUCTION LIMITS CONSTRUCTION LIMITS TOP OF WALL EV EV INSTALL MNDOT CATEGORY 74 TURF REINFORCEMENT MAT AND MNDOT CATEGORY 30 EROSION CONTROL BLANKET FROM OUTLET TO TOE OF SLOPE. TURF REINFORCEMENT MAT SHALL BE SOIL FILLED SNOW STORAGE SNOW STORAGE SNOW STORAGE SNOW STORAGE SNOW STORAGE R10.0 ' R10. 0 ' R113.0 ' R 2 0 . 0 ' R1 5 . 0 ' R 2 0 . 0 ' R3 0 . 0 ' R 2 4 . 5 ' R5 . 0 'R5 . 0 ' R10. 0 ' R5.0 ' R 5 . 0 ' R 5 . 0 ' R5. 0 ' R5.0' R36. 7 ' R30.0' R3 . 0 ' R 3 . 0 ' R30 . 0 ' R38.0' R71.0 ' R3.0' R9 7 . 0 ' R3.0' R 2 0 . 0 ' R 4 8 . 0 ' R2 4 . 0 ' R 2 9 . 0 ' R5.0' R21.3' R 1 0 0 . 0 ' R 1 5 . 0 ' R15 . 0 ' R 1 5 . 0 ' R15.0 ' R3.0' R1 0 . 0 ' R3. 0 ' R10 . 0 ' R 3 . 0 ' R1 2 . 0 ' R 5 . 0 ' MATCH EXISTING C&G, TYP. MATCH EXISTING C&G, TYP. B612 C&G, TYP. RIBBON CURB, TYP. B612 C&G, TYP. 10.5 LF CURB TAPER, TYP. 19 LF CURB TAPER, TYP. B612 C&G, TYP. 4 LF CURB TAPER, TYP. PEDESTRIAN RAMP PER ADA STANDARDS, TYP. HEAVY DUTY BIT PVMT, TYP. 6'X8' CONCRETE TRANSFORMER PAD,TYP. OVERHEAD CANOPY, TYP. SEE ARCH. PLANS FOR DETAILS (PHASE I) B612 C&G, TYP. ACCESSIBLE PARKING SPACE, INCL. SIGNAGE, STRIPING AND RAMPS ACCESSIBLE PARKING SPACE, INCL. SIGNAGE, STRIPING AND RAMPS 9 LF CURB TAPER, TYP. 8 LF CURB TAPER, TYP. CONCRETE BOLLARDS, TYP. OVERHEAD BUILDING CANOPY, TYP. SEE ARCH. PLAN FOR DETAILS 6 LF CURB TAPER, TYP. 6 LF CURB TAPER, TYP. BOULDER RETAINING WALL, TYP. PROVIDE SAMPLES TO MATCH EXISTING BOULDER RETAINING WALL. OWNER TO APPROVE BOULDER SAMPLES PRIOR TO CONSTRUCTION. HEIGHT VARIES, SEE GRADING PLAN FOR DETAILS. HD CONCRETE TRASH & GENERATOR ENCLOSURE, TYP. SEE ARCH. PLANS FOR DETAILS HEAVY DUTY BIT PVMT, TYP. B612 C&G, TYP. B612 C&G, TYP. B612 C&G, TYP. B612 C&G, TYP. CONCRETE SIDEWALK, TYP. CONCRETE SIDEWALK, TYP. STAMPED CONCRETE PATIO, TYP. STAMPED CONCRETE PATIO, TYP. (PHASE I) CONCRETE SIDEWALK, TYP. CONCRETE SIDEWALK ENTRANCE, TYP. (PHASE I) HEAVY DUTY CONCRETE SIDEWALK, TYP. HEAVY DUTY CONCRETE SIDEWALK, TYP. PAVEMENT STRIPING, TYP. PAVEMENT STRIPING, TYP. PAVEMENT STRIPING, TYP. PAVEMENT STRIPING, TYP. HEAVY DUTY BIT PVMT, TYP. PEDESTRIAN RAMP PER ADA STANDARDS, TYP. CONCRETE SIDEWALK, TYP. 2 LF CURB TAPER, TYP. BOULDER RETAINING WALL, TYP. PROVIDE SAMPLES TO MATCH EXISITNG BOULDER RETAINING WALL. OWNER TO APPROVE BOUDER SAMPLES PRIOR TO CONSTRUCTION. HEIGHT VARIES, SEE GRADING PLAN FOR DETAILS. BOULDER RETAINING WALL, TYP. PROVIDE SAMPLES TO MATCH EXISTING BOULDER RETAINING WALL. OWNER TO APPROVE BOULDER SAMPLES PRIOR TO CONSTRUCTION. HEIGHT VARIES, SEE GRADING PLAN FOR DETAILS. MATCH EXISTING BOULDER RETAINING WALL, TYP. SEE GRADING PLAN FOR DETAILS PAVEMENT STRIPING, TYP. 4' HT. ALUMINUM FENCE AT TOP OF RETAINING WALL, TYP. 4' HT. ALUMINUM FENCE AT TOP OF RETAINING WALL, TYP. 5 LF CURB TAPER, TYP. SURMOUNTABLE C&G, TYP. 4' HT. ALUMINUM FENCE AT TOP OF RETAINING WALL, TYP. BOULDER RETAINING WALL, TYP. PROVIDE SAMPLES TO MATCH EXISTING BOULDER RETAINING WALL. OWNER TO APPROVE BOULDER SAMPLES PRIOR TO CONSTRUCTION. HEIGHT VARIES, SEE GRADING PLAN FOR DETAILS. WETLAND BUFFER SIGN (4 TOTAL), TYP. SIGNS TO BE PURCHASES FROM NMCWD. OVERHEAD DOOR ELECTRIC VEHICLE PARKING SPACES (2) WITH CHARGING EQUIPMENT & CONC. CURB STOPS. MONUMENT SIGN (PHASE I) R21.0' 24.0' 24 . 0 ' 2 4 . 0 ' 24 . 0 ' 26.0' 26 . 0 ' 10.0' 5.0' 12 . 7 ' 36.0' 5. 0 ' 5.0' 4. 0 ' 36.0' 24.0' 23 . 8 ' 14.7' 20.0' 39 . 8 ' 24.0' 18.0' 9.0' 9.0 ' 9.5'9.7' 18 . 0 ' 24 . 0 ' 7.0'18.0'24.0' 9. 6 ' 9. 0 ' TY P . 9. 0 ' 7.0 ' 5. 9 ' 7.0' 5. 9 ' 26 . 0 ' Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 COPYRIGHT CIVIL SITE GROUP INC.c BA K E R R O A D S E N I O R L I V I N G PH A S E I I 62 1 6 B A K E R R O A D , E D E N P R A I R I E , M N 5 5 3 4 6 10 9 1 7 H U M B O L D T A V E N U E S , B L O O M I N G T O N , M N 5 5 4 3 1 MI D W E S T R E S I D E N T I A L , I N C . PR O J E C T PRE L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22413 03/29/23 CITY RESUBMITTAL 04/28/23 CITY RESUBMITTAL .. .. .. .. 01/09/23 CITY SUBMITTAL DRAWN BY:REVIEWED BY:AM,KB,NH DK .. .. .. .. .. .. .. 2022 58960 ANDERS S. MELBY LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 04/28/23 SEE ARCHITECTURAL PLANS FOR PROJECT PHASING DETAILS REVISION SUMMARY DATE DESCRIPTION C2.0 SITE PLAN .. .. .. .. .. .. SITE AREA TABLES: SITE LAYOUT NOTES: SITE PLAN LEGEND: TRAFFIC DIRECTIONAL ARROWS FOR REFERENCE ONLY, DO NOT PAINT. SIGN AND POST ASSEMBLY. SHOP DRAWINGS REQUIRED. HC = ACCESSIBLE SIGN NP = NO PARKING FIRE LANE ST = STOP CP = COMPACT CAR PARKING ONLY 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R PROPERTY LINE CURB AND GUTTER-SEE NOTES (T.O.) TIP OUT GUTTER WHERE APPLICABLE-SEE PLAN LIGHT DUTY BITUMINOUS PAVEMENT (IF APPLICABLE). SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & WEAR COURSE DEPTH, SEE DETAIL. HEAVY DUTY BITUMINOUS PAVEMENT (IF APPLICABLE). SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & WEAR COURSE DEPTH, SEE DETAIL. CONSTRUCTION LIMITS TO CITY OF EDEN PRAIRIE SITE SPECIFIC NOTES: 1.RESERVED FOR CITY SPECIFIC SITE NOTES. ACCESSIBILITY ARROW (IF APPLICABLE) DO NOT PAINT. 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.CONTRACTOR SHALL VERIFY LOCATIONS AND LAYOUT OF ALL SITE ELEMENTS PRIOR TO BEGINNING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, LOCATIONS OF EXISTING AND PROPOSED PROPERTY LINES, EASEMENTS, SETBACKS, UTILITIES, BUILDINGS AND PAVEMENTS. CONTRACTOR IS RESPONSIBLE FOR FINAL LOCATIONS OF ALL ELEMENTS FOR THE SITE. ANY REVISIONS REQUIRED AFTER COMMENCEMENT OF CONSTRUCTION, DUE TO LOCATIONAL ADJUSTMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO OWNER. ADJUSTMENTS TO THE LAYOUT SHALL BE APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF MATERIALS. STAKE LAYOUT FOR APPROVAL. 3.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, INCLUDING A RIGHT-OF-WAY AND STREET OPENING PERMIT. 4.THE CONTRACTOR SHALL VERIFY RECOMMENDATIONS NOTED IN THE GEOTECHNICAL REPORT PRIOR TO INSTALLATION OF SITE IMPROVEMENT MATERIALS. 5.CONTRACTOR SHALL FIELD VERIFY COORDINATES AND LOCATION DIMENSIONS & ELEVATIONS OF THE BUILDING AND STAKE FOR REVIEW AND APPROVAL BY THE OWNERS REPRESENTATIVE PRIOR TO INSTALLATION OF FOOTING MATERIALS. 6.LOCATIONS OF STRUCTURES, ROADWAY PAVEMENTS, CURBS AND GUTTERS, BOLLARDS, AND WALKS ARE APPROXIMATE AND SHALL BE STAKED IN THE FIELD, PRIOR TO INSTALLATION, FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT. 7.CURB DIMENSIONS SHOWN ARE TO FACE OF CURB. BUILDING DIMENSIONS ARE TO FACE OF CONCRETE FOUNDATION. LOCATION OF BUILDING IS TO BUILDING FOUNDATION AND SHALL BE AS SHOWN ON THE DRAWINGS. 8.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OR SAMPLES AS SPECIFIED FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO FABRICATION FOR ALL PREFABRICATED SITE IMPROVEMENT MATERIALS SUCH AS, BUT NOT LIMITED TO THE FOLLOWING, FURNISHINGS, PAVEMENTS, WALLS, RAILINGS, BENCHES, FLAGPOLES, LANDING PADS FOR CURB RAMPS, AND LIGHT AND POLES. THE OWNER RESERVES THE RIGHT TO REJECT INSTALLED MATERIALS NOT PREVIOUSLY APPROVED. 9.PEDESTRIAN CURB RAMPS SHALL BE CONSTRUCTED WITH TRUNCATED DOME LANDING AREAS IN ACCORDANCE WITH A.D.A. REQUIREMENTS-SEE DETAIL. 10.CROSSWALK STRIPING SHALL BE 24" WIDE WHITE PAINTED LINE, SPACED 48" ON CENTER PERPENDICULAR TO THE FLOW OF TRAFFIC. WIDTH OF CROSSWALK SHALL BE 5' WIDE. ALL OTHER PAVEMENT MARKINGS SHALL BE WHITE IN COLOR UNLESS OTHERWISE NOTED OR REQUIRED BY ADA OR LOCAL GOVERNING BODIES. 11.SEE SITE PLAN FOR CURB AND GUTTER TYPE. TAPER BETWEEN CURB TYPES-SEE DETAIL. 12.ALL CURB RADII ARE MINIMUM 3' UNLESS OTHERWISE NOTED. 13.CONTRACTOR SHALL REFER TO FINAL PLAT FOR LOT BOUNDARIES, NUMBERS, AREAS AND DIMENSIONS PRIOR TO SITE IMPROVEMENTS. 14.FIELD VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS. 15.PARKING IS TO BE SET PARALLEL OR PERPENDICULAR TO EXISTING BUILDING UNLESS NOTED OTHERWISE. 16.ALL PARKING LOT PAINT STRIPPING TO BE WHITE, 4" WIDE TYP. 17.BITUMINOUS PAVING TO BE "LIGHT DUTY" UNLESS OTHERWISE NOTED. SEE DETAIL SHEETS FOR PAVEMENT SECTIONS. 18.ALL TREES THAT ARE TO REMAIN ARE TO BE PROTECTED FROM DAMAGE WITH A CONSTRUCTION FENCE AT THE DRIP LINE. SEE LANDSCAPE DOCUMENTS. CONCRETE PAVEMENT (IF APPLICABLE) AS SPECIFIED (PAD OR WALK) SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & CONCRETE DEPTHS, WITHIN ROW SEE CITY DETAIL, WITHIN PRIVATE PROPERTY SEE CSG DETAIL BOULDER WALL DETAIL STONE. SHOP DRAWINGS REQUIRED 43 . 0 [13] Drainage and Utility Easement Per Plat [13] Drainage and Utility Easement Per Plat [13] Drainage and Utility Easement Per Plat 125.79 Δ=3°52'30" R=1859.86 N87°57'16"W 211.48 S0 0 ° 2 0 ' 5 5 " W 4 0 5 . 4 8 S87°57'16"E 407.01 N0 2 ° 0 6 ' 1 0 " E 3 7 8 . 1 4 N79°20'5 6 " W 8 3 . 9 5 Chain Link Fence Stone Retaining Wall De c k Bituminous 12" R C P (COUNTY R O A D N O . 6 2 ) (A Public R / W ) Pond (Width Vari e s ) Ed g e o f W a t e r Ed g e o f C a t t a i l s San. (Ap p r o x . P e r M a p ) 8" WM (Approx. P e r M a p ) 6" W a t . S e r v . (A p p r o x . P e r M a p ) Ga s L i n e (A p p r o x . P e r M a p ) 10.0 Ed g e o f W e t l a n d p e r De l i n e a t i o n R e p o r t P e r f o r m e d by W e n k A s s o c i a t e s , I n c . , Da t e d O c t o b e r , 2 0 1 9 HWL 951.50 HWL 933.99 NO PA R K I N G N O P A R K I N G CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS EV EV INSTALL MNDOT CATEGORY 74 TURF REINFORCEMENT MAT AND MNDOT CATEGORY 30 EROSION CONTROL BLANKET FROM OUTLET TO TOE OF SLOPE. TURF REINFORCEMENT MAT SHALL BE SOIL FILLEDUPLAND/SLOPE POLLINATOR MIX / SHOOTING STAR POLLINATOR MIX SEE MANUFACTURE FOR INSTALL . PROPOSED PATIO SEE ARCH. PLANS EDGER TYP. WOOD MULCH TYP. SEE PLANT SCHEDULE EDGER TYP. PROPOSED PATIO SEE ARCH. PLANS RECLAIMED TREE AREA: ROOT BALL TO BE REMOVED AND REST OF TREE SHOULD BE CUT INTO LOGS IN ORDER TO CREATE HABITAT FOR POLLINATORS TREES BEING REMOVED FROM SITE SHOULD BE RELOCATED AND BROKEN DOWN IN ORDER TO CREATE A HABITAT FOR THE RUSTY PATCHED BUMBLE BEE ONCE CONSTRUCTION IS COMPLETED RESEED/RESOD PERVIOUS SPACES CONTRACTOR SHOULD NOTIFY LANDSCAPE ARCHITECT AND OWNER TO REVIEW EXISTING LANDSCAPE BRUSH IN ORDER TO BE REMOVED RM SEE PLANTING SCHEDULE RM SEE PLANTING SCHEDULE BG SEE PLANTING SCHEDULE BG TYP. SEE PLANT SCHEDULE SM4 TYP. SEE PLANT SCHEDULE SM4 TYP. SEE PLANT SCHEDULE SM4 TYP. SEE PLANT SCHEDULE EDGER TYP. RM SEE PLANTING SCHEDULE BOULDER WALL SEE GRADING PLAN BOULDER WALL SEE GRADING PLAN BOULDER WALL SEE GRADING PLAN BOULDER WALL SEE GRADING PLAN RM SEE PLANTING SCHEDULE (3) THREE TREES TO BE ADDED DURING PHASE 1. L1.2 1 L1.2 1 RM SEE PLANTING SCHEDULE RM SEE PLANTING SCHEDULE RM SEE PLANTING SCHEDULE RM SEE PLANTING SCHEDULE EDGER TYP. RM SEE PLANTING SCHEDULE EDGER TYP. RM SEE PLANTING SCHEDULE EDGER TYP. RM SEE PLANTING SCHEDULE L1.2 2 L1.2 2 1 - GD 2 - GD 2 - QS 2 - BF 2 - SI 2 - SI 3 - QB 3 - CS 3 - QB 4 - SI 4 - QS 1 - BF 1 - BF 3 - PA2 3 - BF 3 - BF 2 - CS 1 - BF 3 - BF 2 - CS 2 - BF 2 - QB 1 - SI 1 - SI 4 - QS 1 - GD 2 - CS 3 - PK2 3 - PD 24 - LDN 1 - QB 2 - QB 2 - GD 8 - PP3 8 - RG 12 - LG 16 - SGJ 6 - AA3 2 - LG 3 - SH2 2 - LG 4 - JM 4 - EP3 5 - GB 4 - MB 5 - EP3 7 - GB 5 - MB 7 - EP3 10 - GB 8 - EP3 11 - GB 8 - MB 14 - EP3 20 - GB 10 - MB 11 - MB 8 - MB 7 - MB 3 - HA 6 - SH2 6 - ZA 4 - SH2 4 - HA 4 - SH2 8 - BAJ2 3 - SH2 3 - BAJ2 3 - SH2 2 - BAJ2 4 - RG 6 - ZA 11 - ZA 4 - CK2 6 - ZA 6 - ZA 4 - CK2 4 - NK 5 - PH 4 - NK 3 - PH 4 - NK 23 - SH2 5 - RG 17 - CK2 3 - FB 5 - ZA 3 - FB 5 - ZA 3 - FB 56 - HS 95 - CK2 5 - HS 5 - HS 3 - CC 6 - CC 2 - RB 1 - QB 1 - RB 2 - QB 1 - RB 2 - AA4 2 - RB REVISION SUMMARY DATE DESCRIPTION L1.0 LANDSCAPE PLAN .. .. .. .. .. .. Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 COPYRIGHT CIVIL SITE GROUP INC.c BA K E R R O A D S E N I O R L I V I N G PH A S E I I 62 1 6 B A K E R R O A D , E D E N P R A I R I E , M N 5 5 3 4 6 10 9 1 7 H U M B O L D T A V E N U E S , B L O O M I N G T O N , M N 5 5 4 3 1 MI D W E S T R E S I D E N T I A L , I N C . PR O J E C T PRE L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22413 03/29/23 CITY RESUBMITTAL 04/28/23 CITY RESUBMITTAL .. .. .. .. 01/09/23 CITY SUBMITTAL DRAWN BY:REVIEWED BY:AM,KB,NH DK .. .. .. .. .. .. .. 2022 SEE ARCHITECTURAL PLANS FOR PROJECT PHASING DETAILS LANDSCAPE NOTES: LEGEND EDGING - SHALL BE COMMERCIAL GRADE, 4" DEPTH ALUMINUM, BLACK OR DARK GREEN IN COLOR, INCLUDE ALL CONNECTORS, STAKES, & ALL APPURTENANCES PER MANUF. INSTALL PER MANUF. INSTRUC./SPECS. SEE SHEET L1.1 FOR PLANTING SCHEDULE 0 1" = 20'-0" 20'-0"10'-0" N Know what's below. before you dig.Call R 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.REFERENCE MULCH SCHEDULE ON SHEET L1.1 FOR MULCHING SELECTIONS. 3.ALL TREES SHALL BE MULCHED WITH SHREDDED CEDAR MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ALL MULCH SHALL BE KEPT WITHIN A MINIMUM OF 2" FROM TREE TRUNK. 4.IF SHOWN ON PLAN, RANDOM SIZED LIMESTONE BOULDERS COLOR AND SIZE TO COMPLIMENT NEW LANDSCAPING. OWNER TO APPROVE BOULDER SAMPLES PRIOR TO INSTALLATION. 5.PLANT MATERIALS SHALL CONFORM WITH THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS AND SHALL BE OF HARDY STOCK, FREE FROM DISEASE, DAMAGE AND DISFIGURATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PLUMPNESS OF PLANT MATERIAL FOR DURATION OF ACCEPTANCE PERIOD. 6.UPON DISCOVERY OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE SCHEDULE AND THE QUANTITY SHOWN ON THE PLAN, THE PLAN SHALL GOVERN. 7.CONDITION OF VEGETATION SHALL BE MONITORED BY THE LANDSCAPE ARCHITECT THROUGHOUT THE DURATION OF THE CONTRACT. LANDSCAPE MATERIALS PART OF THE CONTRACT SHALL BE WARRANTED FOR ONE (1) FULL GROWING SEASONS FROM SUBSTANTIAL COMPLETION DATE. 8.ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL RECEIVE 6" LAYER TOPSOIL AND SOD AS SPECIFIED UNLESS OTHERWISE NOTED ON THE DRAWINGS. 9.COORDINATE LOCATION OF VEGETATION WITH UNDERGROUND AND OVERHEAD UTILITIES, LIGHTING FIXTURES, DOORS AND WINDOWS. CONTRACTOR SHALL STAKE IN THE FIELD FINAL LOCATION OF TREES AND SHRUBS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 10.ALL PLANT MATERIALS SHALL BE WATERED AND MAINTAINED UNTIL ACCEPTANCE. 11.REPAIR AT NO COST TO OWNER ALL DAMAGE RESULTING FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. 12.SWEEP AND MAINTAIN ALL PAVED SURFACES FREE OF DEBRIS GENERATED FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. 13.PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLY PROGRAMMABLE AND CAPABLE OF ALTERNATE DATE WATERING. THE SYSTEM SHALL PROVIDE HEAD TO HEAD OR DRIP COVERAGE AND BE CAPABLE OF DELIVERING ONE INCH OF PRECIPITATION PER WEEK. SYSTEM SHALL EXTEND INTO THE PUBLIC RIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB. 14.CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INLCUDING PRICING FROM OWNER, PRIOR TO INSTALLATION. REQUIRED DEVELOPMENT TREES:(52,938 SF / 320) =165" CALIPER INCHES ·REQUIRED TREE REPLACEMENT:40.2" OR (40.2/ 2.5) = 16 ·REQUIRED OVERALL TREES NEEDED:165"+40.2"= 205.2 ·HERITAGE TREES PRESERVED:2 TREES / 74" CAL.) ·SIGNIFICANT TREES PRESERVED:91 TREES / 1469 CAL. IN. ·TOTAL TREES REQUIRED 18 (@ 2.5" CAL.) OR 43 CAL. IN. ·TOTAL TREES PROVIDED 55 (@ 2.5" CAL.) OR 137.5 CAL. IN. DECIDUOUS TREES 18 (@ 2.5" CAL.) OR 45 CAL. IN. EVERGREEN TREES 10 (@ 1.5" CAL.) OR 15 CAL. IN. ORNAMENTAL TREES ·TOTAL SHRUBS PROVIDED 118 OR 20 CAL. IN. ·TOTAL CALIPERS NEEDED FOR 47.6 TREE REMOVAL ·TOTAL CALIPERS FOR LANDSCAPE REQ.165 ·TOTAL TREE REPLACEMENTS ·W/ LANDSCAPE REQUIREMENTS 212.6 ·TOTAL PROVIDED 217.5 LANDSCAPE CALCULATIONS SUMMARY: LANDSCAPE REQUIREMENTS : · IN ORDER TO ACHIEVE LANDSCAPING WHICH IS APPROPRIATE IN SCALE WITH THE SIZE OF A BUILDING AND SITE, THE MINIMUM NUMBER OF CALIPER INCHES OF TREES REQUIRED SHALL BE DETERMINED BY DIVIDING THE TOTAL GROSS SQUARE FOOTAGE OF ALL FLOORS OF A BUILDING BY THREE HUNDRED TWENTY (320). A SINGLE STORY BUILDING IN EXCESS OF TWENTY (20) FEET IN HEIGHT SHALL BE CONSIDERED A TWO STORY BUILDING FOR THE PURPOSES OF DETERMINING ITS TOTAL GROSS SQUARE FOOTAGE NO MORE THAN EIGHTY PERCENT (80%) OF TREES MAY BE OF THE MINIMUM SIZE REQUIREMENT. ·FOR THE PURPOSES OF SATISFYING THE TOTAL CALIPER INCH REQUIREMENT, CONIFEROUS TREES MAY BE CONSIDERED EQUIVALENT TO OVERSTORY TREES BY DIVIDING THE HEIGHT OF A CONIFEROUS TREE SIX (6) FEET HEIGHT MINIMUM BY 2.4 TO DETERMINE EQUIVALENT CALIPER INCHES. ·UNDERSTORY TREES MAY MAKE UP NO MORE THAN TWENTY PERCENT (20%) OF THE TOTAL TREE CALIPER INCHES REQUIRED. ·SHRUBS, PERENNIALS, OR PLANTING BEDS MAY BE SUBSTITUTED FOR TREES ACCORDING TO THE FOLLOWING LIMIT: NOT LESS THAN TEN PERCENT (10%) AND NO MORE THAN TWENTY-FIVE PERCENT (25%) OF THE TOTAL TREE CALIPER INCHES REQUIRED SHALL BE REPLACED WITH SHRUBS AND PERENNIALS, OR PLANTING BEDS. ADDITIONAL SHRUBS, PERENNIALS OR PLANTING BEDS BEYOND THE TWENTY-FIVE (25%) SUBSTITUTION RATE ARE ALLOWED. TREE REPLACEMENT CALCULATION: LANDSCAPE REQUIREMENTS SUMMARY : GROUND COVERS CODE COMMON / BOTANICAL NAME RM 1.5" Dia. River Rock Mulch / Rock Mulch 1.5" Screened Rocks/ Stone/ Rock Mulch 1.5" Screened Decorative Rock/ Stone Mulch 3" Deep Over Geotextile Fabric, Provide Samples. Install W/ Edging As Shown On Landscape Plan SSNS Upland/Slope Pollinator Mix / Shooting Star Pollinator Mix 8 lbs/ac, Install per supplier. Provide Annual Rye cover Crop SM4 Shredded Cedar Mulch / Shredded Hardwood Mulch BG Blue Grass Based / Sod Commercial grade, locally grown, "Big Roll" preferred GROUNDCOVER SCHEDULE SHRUBS QTY COMMON / BOTANICAL NAME SIZE NATIVE PLANTS POLLINATOR FRIENDLY AA3 6 Regent Serviceberry / Amelanchier alnifolia `Regent`#5 CONT NATIVE CULTIVAR Y HA 10 Annabelle Hydrangea / Hydrangea arborescens `Annabelle`#5 CONT NOT NATIVE Y JM 4 Mint Julep Juniper / Juniperus chinensis `Mint Julep`#5 CONT NOT NATIVE N SGJ 16 Sea Green Juniper / Juniperus chinensis `Sea Green`#5 CONT NOT NATIVE N BAJ2 13 Blue Arrow Juniper / Juniperus Scopulorum `Blue Arrow`3` Ht.NOT NATIVE N LDN 24 Little Devil Ninebark / Physocarpus opulifolius `Donna May` TM #5 CONT NATIVE CULTIVAR Y PP3 8 Mugo Pine / Pinus mugo `Pumilio`#5 CONT NOT NATIVE N RG 17 Gro-Low Fragrant Sumac / Rhus aromatica `Gro-Low`#5 CONT NATIVE Y RA 20 Alpine Currant / Ribes alpinum #5 CONT NOT NATIVE N GRASSES QTY COMMON / BOTANICAL NAME SIZE NATIVE PLANTS POLLINATOR FRIENDLY CK2 120 Feather Reed Grass / Calamagrostis x acutiflora `Karl Foerster`#1 CONT NOT NATIVE N CC 9 Blue Zinger Sedge / Carex glauca `Blue Zinger`#1 CONT NOT NATIVE N FB 9 Beyond Blue Fescue / Festuca glauca 'Casca11' TM #1 CONT NOT NATIVE N PH 8 Heavy Metal Switch Grass / Panicum virgatum `Heavy Metal`#1 CONT NATIVE CULTIVAR Y SH2 46 Prairie Dropseed / Sporobolus heterolepis #1 CONT NATIVE Y PERENNIALS QTY COMMON / BOTANICAL NAME SIZE NATIVE PLANTS POLLINATOR FRIENDLY EP3 38 Dwarf Joe Pye Weed / Eupatorium purpureum `Baby Joe`#1 CONT NATIVE Y GB 53 Beven`s Variety Geranium / Geranium macrorrhizum `Beven`s Variety`#1 CONT NOT NATIVE Y HS 66 Stella Supreme Daylily / Hemerocallis x `Stella Supreme`#1 CONT NOT NATIVE Y LG 16 Prairie Blazingstar / Liatris pycnostachya #1 CONT NATIVE Y MB 53 Bergamot / Monarda fistulosa 1 GAL.NATIVE Y NK 12 Kit Kat Nepeta / Nepeta x faassenii `Kit Kat`#1 CONT NOT NATIVE Y ZA 45 Golden Alexander / Zizia aurea #1 CONT NATIVE Y OVERALL SHRUB & PERENNIAL SCHEDULE TREES QTY COMMON / BOTANICAL NAME CONT NATIVE PLANTS POLLINATOR FRIENDLY AA4 2 Armstrong Gold Red Maple / Acer rubrum 'JFS-KW78' TM 2.5" Cal. B&B NATIVE CULTIVAR RB 6 River Birch / Betula nigra 2.5" Cal. B&B NATIVE N BF 17 Dakota Pinnacle Birch / Betula platyphylla `Fargo` TM 1.75" Cal B&B NOT NATIVE N GD 6 Street Keeper Honey Locust / Gleditsia triacanthos `Draves` TM 2.5" Cal. B&B NATIVE CULTIVAR N QB 14 Swamp White Oak / Quercus bicolor 2.5" Cal. B&B NATIVE Y QS 10 Crimson Spire Oak / Quercus robur x alba `Crimschmidt` TM 2.5" Cal. B&B NOT NATIVE Y EVERGREEN TREES QTY COMMON / BOTANICAL NAME CONT NATIVE PLANTS POLLINATOR FRIENDLY PK2 3 Eastern Larch / Larix laricina 6` B&B NATIVE PA2 3 Norway Spruce / Picea abies `Acrocona`6` B&B NOT NATIVE N PD 3 Black Hills Spruce / Picea glauca `Densata`6` B&B NATIVE CULTIVAR N CS 9 Colorado Spruce / Picea pungens 6` B&B NOT NATIVE ORNAMENTAL TREES QTY COMMON / BOTANICAL NAME CONT NATIVE PLANTS POLLINATOR FRIENDLY OVERALL TREE SCHEDULE 6 - CC 5 - HS 5 - HS 3 - CC RM-SEE PLANT SCHEDULE REVISION SUMMARY DATE DESCRIPTION L1.1 LANDSCAPE PLAN NOTES & DETAILS .. .. .. .. .. .. Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 COPYRIGHT CIVIL SITE GROUP INC.c BA K E R R O A D S E N I O R L I V I N G PH A S E I I 62 1 6 B A K E R R O A D , E D E N P R A I R I E , M N 5 5 3 4 6 10 9 1 7 H U M B O L D T A V E N U E S , B L O O M I N G T O N , M N 5 5 4 3 1 MI D W E S T R E S I D E N T I A L , I N C . PR O J E C T PRE L I M I N A R Y  NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER22413 03/29/23 CITY RESUBMITTAL 04/28/23 CITY RESUBMITTAL .. .. .. .. 01/09/23 CITY SUBMITTAL DRAWN BYREVIEWED BYAM,KB,NH DK .. .. .. .. .. .. .. 2022 SEE ARCHITECTURAL PLANS FOR PROJECT PHASING DETAILS 1.ENTIRE SITE SHALL BE FULLY IRRIGATED AND CONNECTED TO E;ISTING IRRIGATION SYSTEM. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 2.SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR IRRIGATION WATER, METER, AND POWER CONNECTIONS. 3.CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND/ABOVE GROUND FACILITIES PRIOR TO ANY E;CAVATION/INSTALLATION. ANY DAMAGE TO UNDERGROUND/ABOVE GROUND FACILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COSTS ASSOCIATED WITH CORRECTING DAMAGES SHALL BE BORNE ENTIRELY BY THE CONTRACTOR. 4.SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTILITY COMPANY STANDARDS AND SHALL BE PER NATIONAL AND LOCAL CODES. E;ACT LOCATION OF SERVICE EQUIPMENT SHALL BE COORDINATED WITH THE LANDSCAPE ARCHITECT OR EQUIVALENT AT THE JOB SITE. 5.CONTRACTOR SHALL COORDINATE WITH LOCAL UTILITY COMPANY FOR THE PROPOSED ELECTRICAL SERVICE AND METERING FACILITIES. 6.IRRIGATION WATER LINE CONNECTION SIZE IS 1-12" AT BUILDING. VERIFY WITH MECHANICAL PLANS.COVAGE. 7.ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE. 8.ALL LATERAL LINES SHALL BE 12" BELLOW FINISHED GRADE. 9.ALL E;POSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR. 10.CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2'-0" BELOW THE FINISHED GRADE OF THE TOP OF PAVEMENT. E;TEND SLEEVES TO 2'-0" BEYOND PAVEMENT. 11.CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT WITH THE SLEEVING MATERIAL "ELLED" TO 2'-0" ABOVE FINISHED GRADE AND CAPPED. 12.FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND SQUARE CUT JOINTS. USE QUALITY GRADE PRIMER AND SOLVENT CEMENT FORMULATED FOR INTENDED TYPE OF CONNECTION. 13.BACKFILL ALL TRENCHES WITH SOIL FREE OF SHARP OBJECTS AND DEBRIS. 14.ALL VALVE BO;ES AND COVERS SHALL BE BLACK IN COLOR. 15.GROUP VALVE BO;ES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. LOCATE IN PLANT BED AREAS WHENEVER POSSIBLE. 16.IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON-SITE WITH OWNER'S REPRESENTATIVE. 17.CONTROL WIRES 14 GAUGE DIRECT BURIAL, SOLID COPPER IRRIGATION WIRE. RUN UNDER MAIN LINE. USE MOISTURE-PROOF SPLICES AND SPLICE ONLY AT VALVES OR PULL BO;ES. RUN SEPARATE HOT AND COMMON WIRE TO EACH VALVE AND ONE 1 SPARE WIRE AND GROUND TO FURTHEST VALVE FROM CONTROLLER. LABEL OR COLOR CODE ALL WIRES. 18.AVOID OVER SPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY INDIVIDUALLY ADJUSTING RADIUS OR ARC ON SPRINKLER HEADS AND FLOW CONTROL ON AUTOMATIC VALVE. 19.ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE. 20.USE SCREENS ON ALL HEADS. 21.A SET OF AS-BUILT DRAWINGS SHALL BE MAINTAINED ON-SITE AT ALL TIMES IN AN UPDATED CONDITION. 22.ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN. 23.ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL UNDERNEATH VALVE AND VALVE BO;. GRAVEL SHALL E;TENT 3" BEYOND PERIMETER OF VALVE BO;. 24.THERE SHALL BE 3" MINIMUM SPACE BETWEEN BOTTOM OF VALVE BO; COVER AND TOP OF VALVE STRUCTURE. IRRIGATION NOTES: FACE OF BUILDING, WALL, OR STRUCTURE MIN. 3" LAYER OF ROCK MULCH AS SPECIFIED. PROVIDE SAMPLE TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION FINISHED GRADE COMPACTED SUBGRADE WATER PERMEABLE GEOTE;TILE FABRIC AS SPECIFIED 18" - VERIFY W/ PLAN AGGREGATE MAINTANENCE STRIP N T S STAKED LANDSCAPE EDGER AS SPECIFIED, SEE MANUFACTURER'S INSTRUCTIONS AND SPECS. FOR INSTALLATION AND PLACEMENT SLOPE - MIN. 2, MA;. 51 VERIFY W/ GRADING PLAN 1 Know what'sbelow. before you dig.Call R PERENNIAL BED PLANTING N T S PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVE SURROUNDING GRADE ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TO ENSURE PROPER BACKFILL-TO-ROOT CONTACT SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED E;ISTING GRADE ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT STEM BACKFILL AS PER SPECIFICATION DO NOT E;CAVATE BELOW ROOTBALL. SIZE VARIES SEE LANDSCAPE PLAN MODIFY E;CAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 4 DECIDUOUS & CONIFEROUS SHRUB PLANTING N T S PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE RETAIN NORMAL SHAPE FOR SPECIES PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVE SURROUNDING GRADE ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TO ENSURE PROPER BACKFILL-TO-ROOT CONTACT SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED E;ISTING GRADE ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK BACKFILL AS PER SPECIFICATION DO NOT E;CAVATE BELOW ROOTBALL. THREE TIMES WIDTH OF ROOTBALL RULE OF THUMB - MODIFY E;CAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 3 THREE TIMES WIDTH OF ROOTBALL DECIDUOUS & CONIFEROUS TREE PLANTING N T S PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE RETAIN NORMAL TREE SHAPE THREE 2";4";8' WOODEN STAKES, STAINED BROWN WITH TWO STRANDS OF WIRE TWISTED TOGETHER. STAKES SHALL BE PLACED AT 120ƒ TO ONE ANOTHER. WIRE SHALL BE THREADED THROUGH NYLON STRAPPING WITH GROMMETS. ALTERNATE STABILIZING METHODS MAY BE PROPOSED BY CONTRACTOR. TRUNK FLARE JUNCTION PLANT TREE 1"-2" ABOVE E;ISTING GRADE MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK E;ISTING GRADE CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. IF NON-BIODEGRADABLE, REMOVE COMPLETELY SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED BACKFILL AS SPECIFIED COMPACT BOTTOM OF PIT, TYP. RULE OF THUMB - MODIFY E;CAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 2 1.THE CONTRACTOR SHALL PROVIDE ONLY PLANT MATERIAL FREE OF NEONICOTINOID BASED INSECTICIDES AND/OR TREATMENTS OF ANY KIND, INCLUDING BY NOT LIMITED TO IMIDACLOPRID CONFIDOR, ADMIRE, GAUCHO, ADVOCATE , THIAMETHO;AM ACTARA, PLATINUM, CRUISER , CLOTHIANIDIN PONCHO, DANTOSU, DANTOP , ACETAMIPRID MOSPILAN, ASSAIL, CHIPCOTRISTAR , THIACLOPRID CALYPSO , DINOTEFURAN STARKLE, SAFARI, VENOM , AND NITENPYRAM CAPSTAR, GUARDIAN . 2.CONTRACTOR SHALL CERTIFY, THROUGH SUPPLIERS POLICY STATEMENT OR AFFIDAVIT, THAT NO NEONICOTINOID BASED INSECTICIDES HAVE BEEN USED ON SITE OR DIRECTLY ADJACENT TO THE GROWING OR STORAGE PLOTS OF THE SUPPLIED PLANT MATERIAL, INCLUDING THE PLANTING OF AGRICULTURAL OR OTHER SEED TREATED WITH NEONICS.. POLLINATOR SAFE PLANT MATERIAL: BOULDER WALL N T S UNDISTURBED SOIL BASE BOLDERS WALL EMBEDMENT AS NOTED MID-LEVEL BOULDERS, TYP. SCHEDULE OF REQUIRED BOULDER SIZES E;POSED WALL HIEGHT BOULDER DEPTH, MIN. 4'24" 5'30" 6'36" 7'38" 8'42" SEE BOULDER SIZE SCHEDULE FOR MORE INFORMATION LOOSELY COMPACTED GRANULATED FILL MIN. 12" DEEP 12" THICK SELECT GRANULAR SAND OR DRAINAGE AGGREGATE WALL BACKFILL COMPACTED 95 OF MA;IMUM STANDARD DENSITY 4" DIA. PERFORATED DRAIN TILE OUTLET # END OF WALL OR # 40' CENTERS MA; HEAVY WOVEN PERMEABLE GEOTE;TILE FILTER FABRIC BEHIND BOULDERS NUMBER OF BOULDER COURSES WILL VARY AS NEEDED HEIGHT MAY VARY SEE GRADING PLAN 5 MULCH SCHEDULE AREA MULCH TYPE EDGING FABRIC REMARKS TREE RINGS 4" DEPTH, SHREDDED CEDAR NO NO PLANTING BEDS 4" DEPTH, SHREDDED CEDAR YES NO MAINT. STRIP AT BUILDING FOUNDATION 1 12 RIVER ROCK YES YES NATIVE SEED AREAS STRAW MULCH NO NO TEMPORARY INSTALLATION FOR SEED ESTABLISHMENT SEE SUPPLIERS INSTALL INSTRUCTION NOTE COORDINATE ALL MULCH AND PLANTING BED MATERIAL PRIOR TO INSTALLATION, PROVIDE SAMPLES AND SHOP DRAWINGS/PHOTOS/DATA SHEETS OF ALL MATERIALS MONUMENT SIGN ENLARGMENT: DECIDUOUS & CONIFEROUS TREE PLANTING ON SLOPE N T S6 PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE RETAIN NORMAL TREE SHAPE STAKING REQUIRED - TWO 2";4";8' WOODEN STAKES, STAINED BROWN WITH TWO STRANDS OF WIRE TWISTED TOGETHER. STAKES SHALL BE PLACED AT OPPOSITE EACH OTHER - ONE UP HILL ONE DOWN HILL. WIRE SHALL BE THREADED THROUGH NYLON STRAPPING WITH GROMMETS. ALTERNATE STABILIZING METHODS MAY BE PROPOSED BY CONTRACTOR. TRUNK FLARE JUNCTION PLANT TREE 1"-2" ABOVE E;ISTING GRADE, ENSURE ROOT CROWN IS AT FINISH ELEV. MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK FINISH GRADE - 31 SLOPE SHOWN FOR REFERENCE, SEE GRADING & LANDSCAPE PLANS FOR PROPOSED SITE CONDITIONS. TREES SHALL NOT BE PLANTED ON SLOPES GREATER THAN 31. REMOVE WIRE BASKET IF PRESENT. CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. IF NON-BIODEGRADABLE, REMOVE COMPLETELY VERTICAL SIDES OF PLANTING HOLE REQUIRED TO MINIMIZE SLOPE DISRUPTION BACKFILL AS SPECIFIED COMPACT BOTTOM OF PIT, TYP. RULE OF THUMB - MODIFY E;CAVATION BASED ON LOCATION OF PLANT MATERIAL, DESIGN OF BEDS OR OVERALL PLANT PLACEMENT, AND SLOPE. CONSTRUCT SOIL WATERING RING AROUND TREE ENSURE ROOT BALL "SHOULDER" IS COMPLETELY BURIED IN GROUND AND/OR NEW WATERING RING SOIL ROOT BALL  12" PER SIDE SNOW STORAGE 2 - GD 95 - CK2 56 - HS 24 - LDN L1.2 1 L1.2 1 OVERSTORY PARKING LOT SHADE TREE LOW TO HIGH HARDY PARKING LOT PLANTS ROCK MULCH GROUNDCOVER 24.0'24.0'1.7'1.7' NATIVE GRASS EDGE PERENNIAL EDGE 80' 4.0' 4.0' 30' 3-4' SNOW STORAGE 3-4' SNOW STORAGE 4' CLEARANCE FOR SNOW STORAGE 4.0'14'4.0' 4. 0 ' 18.0'1.7' PARKING 4' PERENNIAL EDGE AT BOTTOM OF WALL POLLINATOR SEEDING UNDISTURBED SOIL 4' BOULDER WALL E;ISTING TREE 42' SNOW STORAGE L1.2 2 L1.2 2 REVISION SUMMARY DATE DESCRIPTION L1.2 LANDSCAPE PLAN ENLARGEMENTS .. .. .. .. .. .. Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 COPYRIGHT CIVIL SITE GROUP INC.c BA K E R R O A D S E N I O R L I V I N G PH A S E I I 62 1 6 B A K E R R O A D , E D E N P R A I R I E , M N 5 5 3 4 6 10 9 1 7 H U M B O L D T A V E N U E S , B L O O M I N G T O N , M N 5 5 4 3 1 MI D W E S T R E S I D E N T I A L , I N C . PR O J E C T PRE L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22413 03/29/23 CITY RESUBMITTAL 04/28/23 CITY RESUBMITTAL .. .. .. .. 01/09/23 CITY SUBMITTAL DRAWN BY:REVIEWED BY:AM,KB,NH DK .. .. .. .. .. .. .. 2022 SEE ARCHITECTURAL PLANS FOR PROJECT PHASING DETAILS Know what'sbelow. before you dig.Call R 0 1" = 5'-0" 5'-0"2'-6" 1 PARKING LOT SNOW STORAGE SECTION 0 1" = 5'-0" 5'-0"2'-6" 2 WALL SNOW STORAGE SECTION STAFF REPORT TO: Planning Commission FROM: Ben Schneider, Planner I DATE: May 22, 2023 SUBJECT: Bush Lake Pet Hospital LOCATION: PID: 25-116-22-44-0130 (north of 10160 Hennepin Town Road) APPLICANT: Highland Ventures, LTD. 120 DAY REVIEW: August 15, 2023 REQUEST: • Zoning Change from Office (OFC) to Neighborhood Commercial (N-COM) on 1.19 acres • Planned Unit Development Concept Review on 1.19 acres • Planned Unit Development District Review with waivers on 1.19 acres • Site Plan Review on 1.19 acres BACKGROUND The applicant is proposing to construct an approximately 5,074 square foot, single-level commercial building. About 3,958 square feet would be occupied by Bush Lake Pet Hospital, while the other 1,015 square feet would be for an additional commercial or office tenant (TBD). This vet is planning to relocate from Bloomington to this new proposed building in Eden Prairie in order to have more tenant space. Operating hours are planned to be 8:00am-5:00pm Monday through Friday, 8:00am-12:00pm Saturday, and closed on Sunday. There will be no overnight boarding with the exception of surgery patients. The 1.19 acre site is currently vacant and is directly north of the Kinderberry Hill Child Development Center along Hennepin Town Road and across the street from the Bluff Country Village townhome development. The subject parcel also borders US Highway 169 to the east, Project Site Staff Report – Bush Lake Pet Hospital May 22, 2023 Page 2 which is physically separated by a sound wall. REZONING The subject property was rezoned from Neighborhood Commercial to Office in 2007 in conjunction with the Kinderberry Hill PUD development. The City approval included conceptual plans for an office building on the subject parcel, which was never constructed. While the site has maintained its Office zoning, it is now guided Commercial in the Comprehensive Plan. The applicant is requesting to rezone the parcel back to Neighborhood Commercial, consistent with this guided land use. SITE PLAN The applicant is proposing to construct an approximately 5,074 square foot, single-level commercial building. About 3,958 square feet would be occupied by Bush Lake Pet Hospital, while the other 1,015 square feet would be for an additional commercial or office tenant (TBD). The building is proposed to be located on the northeast part of the site and meets all required building setbacks. The site plan also shows an outdoor fenced enclosure for pets on the rear side of the building. The parcel has two street frontages, meaning the site is permitted to have one frontage with a 17.5-foot parking setback. The proposed parking areas comply with all setback requirements. Using the ratio of five (5) parking stalls for every 1,000 square feet of gross floor area, as required in City Code, 26 parking spaces are required. In addition, the development agreement associated with the Staff Report – Bush Lake Pet Hospital May 22, 2023 Page 3 adjacent daycare requires that the subject site to “provide 4 parking spaces for the use of [the daycare parcel]”. This means the site is required to have 30 stalls in total. The site plan shows 34 parking stalls. The site plan includes two (2) access points. The first would utilize the existing curb cut along Hennepin Town Road. The second is a proposed connection between the subject property and the Kinderberry Hill property to the south as suggested by the original development plans. An easement agreement already exists between these two parcels for the construction and use of this parking lot connection. TRAFFIC The applicant has submitted a traffic memo as a part of this project. The memo utilizes the ITE Trip Generation Manual and estimates that the vet clinic would yield 89 daily trips and that the second tenant would yield 17 daily trips, which adds up to 106 total daily trips. This report also analyzes the sight lines for drivers exiting the site onto Hennepin Town Road. They conclude that the intersection sight distances are acceptable. ARCHITECHTURAL STANDARDS The proposed building has a combination of flat and pitched roofs, adding visual interest. The two sections of the building with pitched roofs are located above the entrances of each tenant space, Staff Report – Bush Lake Pet Hospital May 22, 2023 Page 4 which clearly defines the entrances. The building meets City Code standards for color variation and number of Class I materials, which include brick, stone, and glass. The structure also incorporates Class II materials, including EIFS, porcelain tile, and metal. Each façade complies with having at least 75% Class I materials. The proposed trash enclosure, shown on the right, uses complimentary materials to the principal structure. PLANNED UNIT DEVELOPMENT WAIVERS The purpose of a Planned Unit Development (PUD) as stated in the City Code is to provide for a more creative and efficient approach to the use of land within the City; to allow variety in the types of environment available to people and distribution of overall density of population and intensity of land use where desirable and feasible; and provide for greater creativity and flexibility in environmental design. As a part of the PUD process, the applicant is seeking waivers to City Code requirements as outlined below. A. Lot Size City Code requires a minimum lot size of two (2) acres for Neighborhood Commercial (N-COM) lots. The applicant is requesting a waiver to allow a lot size of 1.19 acres. The current guiding of the parcel is Commercial, and the only two commercial districts that would not require a lot size waiver for the subject parcel are Regional Service (C-REG-SER) and Highway Commercial (C-HWY). Compared to those alternatives, Neighborhood Commercial zoning is more compatible with the proposed use and the zoning of the surrounding area, which includes other lots that are zoned Neighborhood Commercial. B. Lot Depth City Code requires a minimum average lot depth of 200 feet for Neighborhood Commercial (N-COM) lots. The applicant is requesting a waiver to instead have an average lot depth of 129 feet. The rationale for this waiver is similar to the lot size waiver request above. Staff supports the waivers, as the lot size and depth are not adjusted by the applicant, and the zoning district proposed, though requiring waivers, is more compatible with the surrounding land uses. Staff Report – Bush Lake Pet Hospital May 22, 2023 Page 5 LANDSCAPE AND TREE REPLACEMENT PLAN The subject parcel, in addition to other nearby lots, was cleared and graded as part of the Bluff Country Village project. As part of that project, a number of significant and heritage trees were identified as needing to be saved, but all other trees were removed and a replacement requirement of 904 caliper inches was deferred until the remaining parcels were developed. In 2007, the Kinderberry Hill project agreed to plant 29 of these caliper inches, bringing the new outstanding total to 875 caliper inches between the remaining vacant lots. When dividing this number based on the areas of these lots, this left 193 caliper inches of replacement requirement for the subject parcel. The landscape and tree plan includes 95 caliper inches of new trees that go towards the tree replacement requirement. Since it would be reasonably difficult to plant additional trees on the site, the applicant has agreed to pay a cash in lieu fee for the remaining caliper inches. Also, the applicant is not proposing to remove any additional significant nor heritage trees on the site. This project also requires 22 caliper inches of landscaping. The plan meets this requirement and also includes additional shrubs that are not counted towards the landscaping requirements. STORMWATER MANAGEMENT An underground detention system is proposed to be installed beneath the parking lot. The underground detention system treats stormwater pollution from the site’s runoff and reduces discharge rates to the downstream storm sewer system. This system will tie into the existing stormwater piping on the daycare lot to the south, which flows to the stormwater pond to the south of the daycare. This connection is permitted due to an existing easement agreement between the subject parcel, daycare lot, and the outlot with the stormwater pond. This property is not in the shoreland overlay district. LIGHTING Three (3) new light poles are proposed as a part of this project. There will also be lighting on the building to illuminate the sidewalk in front of the building entrances. A photometric plan was submitted and shows that the lighting would meet the City Code requirements, as the plan shows light levels to be at or below 0.5 footcandles at the property lines. SIGNS Sign areas are shown on the exterior elevations for illustrative purposes only. All proposed signs will require review and approval through the sign permit process and compliance with City Code Section 11.70. SUSTAINABILITY The applicant notes the following sustainable features in their project narrative: • Energy efficient appliances will be used in the facility. • Conduit will be installed to accommodate future EV charging in the parking lot. • Low VOC materials shall be reviewed and incorporated into the final building design where appropriate. • Roughly 25 percent of the site will remain undisturbed, which will lessen potential soil Staff Report – Bush Lake Pet Hospital May 22, 2023 Page 6 erosion. • While the trees are required, the approximately 95 caliper inches of new trees would help absorb rainfall and stormwater runoff from the site. NEIGHBORHOOD MEETING AND RESIDENT INPUT The applicant held a neighborhood meeting on March 2nd, 2023. A total of 15 residents attended the meeting. Attached to this report is a written summary by the applicant of the neighborhood meeting. As of this writing, City staff has not received any written nor verbal comments from the public related to this project. STAFF RECOMMENDATION Staff recommends approval of the following request: • Zoning Change from Office (OFC) to Neighborhood Commercial (N-COM) on 1.19 acres • Planned Unit Development Concept Review on 1.19 acres • Planned Unit Development Review with waivers on 1.19 acres • Site Plan Review on 1.19 acres This is based on plans stamp dated May 22, 2023, staff report dated May 22, 2023 and the following conditions: 1. Prior to land alteration permit issuance, the applicant shall: a. Submit detailed utility and erosion control plans for review and approval by the City Engineer. b. Obtain and provide documentation of Watershed District approval. c. Notify the City and Watershed District 48 hours in advance of grading. d. Install erosion control at the grading limits of the property for review and approval by the City. e. Submit a landscaping letter of credit or escrow surety equivalent to 150% of the cost of the landscaping. f. Developer shall make a cash payment for Tree Replacement as provided by City Code. 2. The following waivers are granted through the PUD for the project as indicated in the plans stamp dated May 22, 2023. A. Lot Size City Code requires a minimum lot size of two (2) acres for Neighborhood Commercial (N- COM) lots. This waiver allows a lot size of 1.19 acres. B. Lot Depth Staff Report – Bush Lake Pet Hospital May 22, 2023 Page 7 City Code requires a minimum average lot depth of 200 feet for Neighborhood Commercial (N-COM) lots. This waiver allows an average lot depth of 129 feet. Project Narrative Bush Lake Veterinary Clinic Eden Prairie, MN March 2023 Revised April 2023 Revised May 2023 GENERAL OVERVIEW Highland Ventures LTD proposes to develop a 5,074 square feet commercial building. The proposed building will be divided into an approximate 3,958 square feet veterinary clinic and an approximate 1,015 square feet additional tenant space (use to be determined). The development will include required stormwater detention and water quality structures, storm inlets and piping, water and sewer services, parking and drive aisles, and lawn and landscape areas. No kennels are included in the proposal. Normal hours of operation for the veterinary clinic are to be as follows: M-F 8am-5pm, Sat 8am-12pm, Sun Closed. The veterinary clinic will not have overnight boarding with the exception of surgery patients. CITY GUIDE PLAN FRAMEWORK The Highland Ventures, LTD project does not propose any change to the Eden Prairie Guide Plan 2040. Per the Eden Prairie Guide Plan Map 2040 on the City website, the proposed site is identified as a commercial land use. The current site is zoned as OFC. The proposed rezoning for the parcel is PUD Commercial (PUD Neighborhood Commercial). The proposed zoning for the 1.19-acre parcel follows the Eden Prairie 2040 Guide Plan and is compatible with the adjacent uses. ZONING CLASSIFICATION The existing lot is zoned as OFC – Office. As discussed with City Staff, the OFC classification is not compatible with the proposed use. Therefore, Highland Ventures, LTD is proposing to rezone the site to a PUD commercial classification (PUD Neighborhood Commercial). The requested PUD N-COM commercial classification and the proposed development plans will allow the flexibility needed by Highland Ventures, LTD to develop the site for the proposed use. The unusual shape of the lot that is bounded by Hennepin Road and the off ramp from US 169 has resulted in some design challenges that the PUD zoning will help the developer overcome. VARIANCES/PUD WAIVERS The following PUD waivers are being requested for the project: 1. Lot size requirement is 2.0 acres. The existing platted lot is 1.19 acres. Requesting a waiver on the minimum lot size requirement of 2.0 acres. 2. Lot Depth – The required lot depth is 200’. However, the existing lot is trapezoidal in shape with a mean depth of 129.38’. Requesting a waiver on the minimum lot depth requirement. EXISTING AND PROPOSED LAND USES The proposed development parcel is currently vacant and undeveloped. The parcel was originally platted as Lot 2, Block 1 of the Bluff Country Village 3rd Addition. The existing uses to the north are Hennepin Town Road and US 169. The existing use to the east is US 169 off ramp. The existing use to the south is an existing day care facility zoned Office. The existing use to the west is Bluff Country Village multi-family development, and property that is zoned Regional Commercial south of the multifamily development. A small strip center, zoned commercial per the City Zoning Map, has been constructed immediately south of the Bluff Country Village multi- family development. Highland Ventures LTD proposes to develop the parcel for a veterinary clinic and small tenant space (use to be determined). The development will be for a single building with two tenants. LANDSCAPING The landscape material proposed for the project meets the requirements outlined in the Eden Prairie Zoning Ordinance. Landscape material is proposed to be placed within the parking lot islands and to provide the required buffering/screening of the parking areas from Hennepin Road. The existing site has six large trees that will be preserved. Four (4) of the existing heritage trees are located along the US 169 right of way, and two heritage trees are located along the Hennepin Town Road right of way. These trees sizes range in size from 9” to 25” diameter. These trees will not be removed as part of the site development. In addition, the original PUD zoning for the development which this proposed project will now be part of was required to plant an additional 199 caliper inches of landscape trees on the lot. Per a meeting with City Staff, the required tree replacement amount was calculated based upon the proposed tree removal from the lot with the original site development plan from 2008. The proposed Highland Ventures project shall include the installation of 95 caliper inches of the required 193 caliper inches of trees. The developer will pay a cash fee for the remaining 98 caliper inches of tree installation as the site cannot accommodate the additional required trees. SUSTAINABLE COMPONENTS INCORPORATED INTO THE PROJECT Low VOC materials shall be reviewed and incorporated into the final building design where appropriate. As required by Hennepin County, recycling bins will be incorporated into the dumpster enclosure. Energy efficient appliances (Energy Star) will be used in the facility. The developer is providing one conduit with pull wire for a potential future EV charging station in the parking area at the site. The northern portion of the project, approximately 0.28 acres, shall not be disturbed. No new utilities or impervious area will be installed in this area. By not including this area in the project limits, the developer is able to reduce the overall lot grading and potential soil erosion from the site. Although required from the previous PUD rezoning of the property, the developer shall install approximately 96 caliper inches of trees more than what is required for the project per the current zoning code. The additional trees shall help absorb rainfall and storm runoff from the site. PHASING AND CONSTRUCTION SCHEDULE The project will be constructed as one phase upon approval of the site development plans. The anticipated construction is currently anticipated to start July 1, 2023 (or earlier if permitting completed) and to be completed by January 1, 2024. DEVELOPMENT METHOD The proposed project will be developed by Highland Ventures LTD. At this time, Bush Lake Veterinary Clinic shall be leasing the 4,140 square foot space. No tenant has been identified at this time for the 1,193 square foot tenant space. LEGAL INSTRUMENTS, EASEMENTS, COVENANTS and RESTRICTIONS Per the recorded Declaration of Easements and Covenants for the Bluff Country Village 3rd Addition document no. 9115304 recorded on March 31, 2008, the following affect the development lot: 1. An easement for reasonable access, ingress and egress, over paved driveways, roadways and drive aisles within the parking areas located on Parcels A and B, as hereafter constructed, so as to provide for the passage of motor vehicles and pedestrians between Parcels and to and from all street or rights of way furnishing access to the parcels. The easement shall include the right for reasonable access to maintain and repair the improvements. 2. An easement has been established for the benefit of Parcel B to drain stormwater runoff across Parcel A and to the detention basin located in Outlot A. The easement includes the right of reasonable ingress and egress as may be required to maintain, repair and operate the storm sewer. 3. An easement has been established over and across the Common Areas of the Parcels for the installation of distribution lines, conduits, wires, cables and other apparatus for the installation of all water, sanitary sewer electric, gas, telephone cable, and other utility service lines. The easement includes the right for reasonable access to maintain, repair and operate the utility lines. The utility lines can not be modified, changed or altered without prior written consent of all Owners of the Parcels. 4. Indemnification of each owner shall be as outlined in the recorded document. 5. Maintenance of the driveways and access ways shall be the responsibility and cost of the owner of the Parcel on which the improvement is located. 6. Maintenance of the storm sewer system shall be the responsibility and cost of the owner of the Parcel on which the utility is located. However, the owner of Parcel A shall have the right to periodically bill the owner of Parcel B for the reasonable cost of maintenance and repair of the storm sewer located on parcel A. The ratio of the costs billed to Parcel B shall not exceed 1/4th of the maintenance and repair costs of the storm sewer. 7. Maintenance of the sanitary sewer system shall be the responsibility and cost of the owner of the Parcel on which the utility is located. However, the owner of Parcel A shall have the right to periodically bill the owner of Parcel B for the reasonable cost of maintenance and repair of the storm sewer located on parcel A. The ratio of the costs billed to Parcel B shall not exceed 1/4th of the maintenance and repair costs of the storm sewer. For the above recorded Declaration of Easements and Covenants for the Bluff Country Village 3rd Addition, Parcel A is the existing daycare facility lot, Parcel B is the proposed development lot, and the Out Lot A is the existing retention basin south of Parcel A. HOUSING OR LAND USE PROFILE The proposed project will not include any housing units. The project development summary is as follows: Lot Area = 1.19 acres Building Area = 5,367 square feet Floor Area Ratio = 0.1035 Base Area Ratio = 0.1035 Building Setbacks Front = 35 feet Side = 20 feet Rear = Not Applicable Building height = 24’ feet to mid-point of roof Parking Setback = ½ front setback (17.5 feet) (Only along Hennepin Road) Parking ratio = 5 spaces per 1,000 square feet Parking Required = 27 Standard Spaces = 33 ADA Spaces = 2 Total Provided = 35 SIGNAGE The proposed signage for the project will consist of wall signs for the veterinary clinic and the future retail. The signs shall be located above the entry doors as shown on the PUD elevations plans. The veterinary clinic sign will be approximately 85 square feet and the sign for the additional tenant space is approximately 25 square feet. At this time, a monument sign is not proposed for the development. A separate sign application will be required and approved prior to any signage installation taking place on site. DUMPSTER ENCLOSURE The proposed location of the dumpster enclosure was chosen due to the existing site conditions for the project; the two front yards limit the site due to the setback requirements for front yards, and the unusual shape of the lot (triangular) has limited the developable area. It has been the lot shape that has been the most difficult to deal as the shape has reduced the number of parking spaces that can be placed close the building entrances. If the dumpster enclosure were to be moved closer to the building, the customer parking would have to be further away from the building; the developer prefers to have the customers closer to the building instead of the dumpster enclosure. As required by code, the dumpster enclosure will match the proposed building materials. The enclosure will also have a roof over the dumpster to prevent any trash from blowing out of the container. LIGHTING Energy efficient LED lighting is proposed for the project. The proposed mounting height for the fixtures as shown on the site and photometric plans shall not exceed 25’. Two bronze pole mounts are proposed for the project. The parking light fixtures will be bronze in color and Talon Area lights manufactured by Unite Lighting. In addition to the parking lot lights, wall pack units and canopy are to be mounted on the building and canopies to illuminate the sidewalk and entry ways into the building. The canopy lighting is manufactured by XtraLight. The site photometric plan shows the light levels to be at or below the required 0.5 foot-candle limit at the property lines. TRANSPORTATION CAPACITY A separate transportation memo has been submitted to the City of Eden Prairie outlining the anticipated traffic generation for the project. The trip generations have been based upon the ITE Trip Generation Manual, 11th Edition. For the project, the total daily trips expected to be generated by the project are 53 trips in and 53 trips out of the site. In addition, a preliminary analysis of the departure sight distance was performed for the project site. For the sight distance analyses the southbound left turn lane from the site onto Hennepin Town Road was analyzed as it requires the largest gap in the traffic flow to complete the movement. Using the MN DOT Roadway Design Manual to determine the required sight distance for the drive location, it appears from available information and aerials that the required site distance will be provided for the project. PHASE 1 ENVIRONMENTAL ASSESSMENT A separate Environmental Phase 1 Assessment was prepared for the project by Partner Engineering and Science, Inc. and is dated January 31, 2023. A copy of the report, Phase 1 Environmental Site Assessment Report dated January 31, 2023, is attached to the PUD submittal. ENVIRONMENTAL ASSESSMENT WORKSHEET OR IMPACT STATEMENT Per the rules of the Minnesota Environmental Quality Board, the proposed project does not fall within the threshold requirements for a mandatory EAW. The document reviewed for this requirement is May 2010 Guide to Minnesota Environmental Review Rule as provided by the EQB. SHORELAND ORDINANCE/FLOODPLAIN RESTRICTION The project is not subject to the Shoreline Ordinance as the property does not abut any public waters or wetlands. In addition, the floodplain ordinance does not apply to this project as the site is located in Flood Zone X per FEMA Map Panel 27053C0434F dated November 4, 2016. SNOW AND SALT MANAGEMENT PLANS Snow storage on site shall be located on the north side of the property – next to the dumpster location. The three proposed parking spaces shall be used for the initial snow storage. If this storage area becomes full and additional snow storage is not possible at this location, the snow shall be removed from the site. AIRPORT ZONES Per a discussion with Eric Giles of the Metropolitan Airports Commission (MAC) and a review of the Joint Airport Zoning Board Ordinances, the site is located outside of the Airport Zones A, B and C. A copy of the Zoning Map showing the site location is attached to this document for reference. DISPOSITION OF EXCESS LAND The project will not have any excess land to dispose of. The disposition of excess land does not apply to the project. LIMITS OF DISTURBANCE The limits of disturbance for the project are as outlined on the existing conditions and site grading plans. Approximately 0.74 acres of land will be disturbed to develop the site. At the current time the project is expected to move approximately 2,125 cubic yards of earth. The topsoil shall be reused on site to the extent possible; excess topsoil shall be taken off site. The proposed grading will result in minimal earth import to balance the site. STORMWATER MANAGEMENT REPORT A separate stormwater management report has been prepared for the project. The stormwater requirements have been coordinated with the City of Eden Prairie and the Riley-Purgatory-Bluff Creek Watershed District. Per the report the stormwater quantity control volume is approximately 11,400 cu- ft, The proposed underground detention chamber system is located on the proposed grading and utility plan sheets for the project. WATER AND WETLANDS Per the National Wetlands Inventory Maps available on the US Fish and Wildlife Service Website, no wetlands or riparian areas are present on the site. A copy of the wetlands inventory map is included with this Narrative. WILDLIFE AND THREATENED SPECIES ONSITE No known threatened or endangered species are on the project site. A cultural resource request has been submitted to the Minnesota Department of Natural Resources for an official determination. At this time, they have responded that some additional research is required to make a final determination on the site. SOILS CLASSIFICATIONS A separate geotechnical report was prepared for the project site. A copy of the geotechnical engineering report, Subsurface Exploration and Foundation Evaluation, Proposed Heartland Vet Clinic dated February 10, 2023, is available for the City’s review. Per the report, the existing soils on site consist of about 2-18 inches of sandy clay topsoil. Below the topsoil layer is a mixture imbedded sand and clay and silt and gravel layers throughout the site. Groundwater was encountered between 7 and 14 below ground surface (refer to the boring logs). Groundwater will fluctuate during the seasons and as a result groundwater may need to be controlled during construction of the utility lines and some foundation areas. The approximate groundwater elevations for the soil borings were recorded as follows: Soil Boring Ground Elevation Water Surface Elevation B-1 838.00 830.50 B-2 837.00 None recorded B-3 839.00 825.00 B-4 838.00 None Recorded B-5 842.00 835.00 B-6 840.50 833.50 The soils appear to be conducive for site grading and support of the building slab and proposed pavements. The site grading will follow the geotechnical recommendations to maintain positive drainage over the soils as they are worked. The proposed building may be supported by conventional spread footings. The footings must bear on natural suitable soils or on structural soils as prepared per the report. For frost protection the footings must be at least 4 feet below finished grade adjacent to the building to protect against frost heave. The slab area must be compacted, and proof rolled per the geotechnical report to maintain the proper elevations. The pavement sections have been designed based upon the predominate soil type consisting of sandy material. Due to the soil type, the geotechnical report recommends that the asphaltic pavements in the heavy and light duty areas be constructed in accordance with the Minnesota DOT Specifications Section 2360 and 2211. Connections to the public roadway and the internal roadway networks should consist of concrete pavements. EXISTING STRUCTURES There are no buildings or structures currently on the project site. STEEP SLOPES There are no steep slopes (greater than 3:1) or elevation changes over 30’ on the project site. CURRENT OWNERSHIP The project site is currently owned by: EP Land LLC, 1128 Harmon Place Suite 320. Minneapolis, MN 55403. DEVELOPER The project is being developed by Highland Ventures, LTD, 2500 Lehigh Avenue, Glenview, IL 60026. The point of contact is Travis Norris, Director of Construction, 847.904.9161 (D), 910.352.2052 (C). PROJECT FINANCING There is no public financing for the project. Eden Prairie 2040 Guide Plan for Parcel Guide plan Legend National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AREAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREENArea of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.The basemap shown complies with FEMA's basemapaccuracy standards The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 1/17/2023 at 1:08 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximatepoint selected by the user and does not representan authoritative property location. 1:6,000 93°24'16"W 44°49'29"N 93°23'38"W 44°49'3"N Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 Bush Lake Veterinary Clinic U.S. Fish and Wildlife Service, National Standards and Support Team,wetlands_team@fws.gov Wetlands Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Other Riverine February 28, 2023 0 0.07 0.140.035 mi 0 0.1 0.20.05 km 1:4,375 This page was produced by the NWI mapperNational Wetlands Inventory (NWI) This map is for general reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map. All wetlands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site. T/O PARAPET 18'-8" T/O CANOPY 9'-4"T/O CANOPY 8'-0" B/O EAVE 20'-8" 1 2 3 4 5 T/O BAND 2'-8" T/O BAND 15'-4" 6 777778 9 10 11 61111 14 17 3 11 12 10 13 12 15 16 3 9 A B C 1 A4.1 _____ 1 A4.1 _____ 3 A5.1 _____ C1 0 0 - 3 W1W1W1 W3 FUTURE TENANT SIGNAGE 4 12 2 17'-2" 1'-6" 19 20 CJ CJ CJ 5'-2" 5'-2" 5'-2" 5'-2" 5'-2" 5'-2" REMAIN. 3'-4" T/O PARAPET 18'-8" T/O BAND 2'-8" T/O CANOPY 9'-4" B/O EAVE 20'-8" 4 12 T/O CANOPY 8'-0" 17 16 312 15 12 3 11 10 13 1 4 3 2 14 14 6 9 13 10 A B C 1 A4.1 _____ 1 A4.1 _____ 20 CJCJCJ 5'-3 1/2"5'-3 1/2"5'-3 1/2"5'-3 1/2"5'-3 1/2"5'-3 1/2"5'-3 1/2"5'-3 1/2"5'-3 1/2"5'-3 1/2"REMAIN. 15 T/O BAND 2'-8" T/O PARAPET 18'-8" T/O CANOPY 9'-4"T/O CANOPY 8'-0" T/O BAND 11'-8" ROOF 15'-4" B/O EAVE 20'-8" 18 11 22 3 315 15 15 15 15 15 12 12 12 12 6 6 10 10 10 10 15 16 3 14 14 14 13 13 13 13 314 3 3 5 6 1 23 4 2 A4.1 _____ 2 A4.1 _____ 1 A4.2 _____ 1 A4.2 _____ B1 0 0 - 1 C1 0 0 - 4 17 5 CJCJ BEHIND DOWNSPOUT 3 GAS SUPPLY LINES FOR RTU. SEE PLUMBING. 4'-2 3/4"5'-1 1/2"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-1 1/2"3'-0" 20 4 12 4 12 20 CJ CJ 3 A1 0 0 - 2 6 4 12 11 22 3 3 16 8 9 8 9 77778 9 10 1013 1111 6 6 T/O BAND 2'-8" T/O CANOPY 9'-4" T/O BAND 15'-4" B/O EAVE 20'-8" T/O CANOPY 9'-4" B/O EAVE 20'-8" T/O BAND 2'-8" 3 6 5 4 4 7 5 3 1 2 3 4 2 A4.1 _____ 2 A4.1 _____ 1 A4.2 _____ 1 A4.2 _____ C1 0 0 - 1 A1 0 0 - 1 C1 0 0 - 2 5 W2 3 4 FUTURE TENANT SIGNAGE FUTURE TENANT SIGNAGE 1'-6" 17'-2" 3'-4" 17'-2" 3'-4"3'-4" 1'-6" 17'-2" 20 20 CJ CJCJCJ 4'-5"5'-1"5'-1"5'-1"5'-1"5'-1"5'-1"4'-5" 12 15 17 16 4 12 1 STANDING SEAM PRE-FINISHED METAL PANEL ROOFING 2 PRE-FINISHED METAL FASICA AND SOFFIT TO MATCH ROOF COLOR 3 PRE-FINISHED METAL GUTTER AND DOWNSPOUTS TO MATCH ROOF COLOR - DRAIN TO STORM 4 BRICK VENEER - COORDINATE COLOR SELECTION WITH STONE FINISH 5 SIGNAGE 6 PRE-MANUFACTURED STEEL CANOPY - BOD: MAPES LUMISHADE 7 STOREFRONT GLAZING ASSEMBLY 8 WOOD GRAIN PORCELAIN TILE IN HERRINGBONE PATTERN 9 CAST STONE SILL IN COLOR TO COORDINATE WITH BRICK 10 CAST STONE BAND IN COLOR TO MATCH ACCENT BRICK 11 PRE-MANUFACTURED STEEL CANOPY - BOD: MAPES SUPERSHADE 12 ADHERED STONE MASONRY VENEER 13 FACE BRICK IN ACCENT COLOR TO COORDINATE WITH STONE AND MAIN BRICK SELECTION 14 CAST STONE BAND COURSE IN COLOR TO MATCH STONE 15 STUCCO FINISH EIFS WITH 1/2" REVEALS - BOD DRYVIT OUTSULATION PLUS 16 PRE-FINISHED METAL COPING IN COLOR TO COORDINATE WITH EIFS 17 70" TALL METAL LOUVERED ROOFTOP SCREEN PER CITYSCAPES ENVISOR SERIES SCREENING SYSTEMS AT ROOFTOP HVAC UNIT 18 FULLY ADHERED MEMBRANE ROOF 19 ALUMINUM COLUMN WRAP TO MATCH STOREFRONT ASSEMBLY - PER STOREFRONT MFG 20 PRE-FINISHED METAL SNOW GUARD NOTE: CJ REFERS TO MASONRY CONTROL JOINT. www.f-w.com Engineers | Architects | Surveyors | Scientists INC. DATE: DRAWN: REVIEWED: SHEET TITLE: SHEET NUMBER: PROJECT NO.: PROJECT: DESIGNED: 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com ISSUE: #DATE: DESCRIPTION: 5/ 1 8 / 2 0 2 3 2 : 2 5 : 3 9 P M A3.1 EXTERIOR ELEVATIONS SYH SCB 0221474.00 LANDLORD WARM DARK SHELL HIGHLAND VENTURES LTD. 10160 HENNEPIN TOWN ROAD, EDEN PRAIRIE, MN 55347 05/05/2023 JMA 03/22/2023 PERMIT SETPERMIT SET SCALE: 1/8" = 1'-0"4 NORTH ELEVATION SCALE: 1/8" = 1'-0"3 SOUTH ELEVATION SCALE: 1/8" = 1'-0"2 EAST ELEVATION SCALE: 1/8" = 1'-0"1 WEST ELEVATION ELEVATION MATERIAL KEYNOTES 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 ELEVATION MATERIAL CALCULATIONS NORTH ELEVATION NORTH ELEVATION, TOTAL SQUARE FOOTAGE = 1,218.6 SF CLASS I MATERIAL BREAKDOWN (MINIMUM 75%) A) MAIN BRICK = 276.9 SF B) CAST STONE = 24.9 SF C) GLAZING = 278.2 SF D) ACCENT BRICK = 77.8 SF E) STONE = 313.2 SF TOTAL CLASS I MATERIALS = 971 SF PERCENTAGE OF FAÇADE = 80% CLASS II MATERIAL BREAKDOWN (MAXIMUM 25%) F) EIFS = 104.3 SF G) METAL = 83.9 SF H) WOOD GRAIN PORCELAIN TILE = 59.4 SF TOTAL CLASS II MATERIALS = 247.6 SF PERCENTAGE OF FAÇADE = 20% SOUTH ELEVATION SOUTH ELEVATION, TOTAL SQUARE FOOTAGE = 1,221 SF CLASS I MATERIAL BREAKDOWN (MINIMUM 75%) A) MAIN BRICK = 66.2 SF B) CAST STONE = 38.7 SF C) GLAZING = 0 SF D) ACCENT BRICK = 136.5 SF E) STONE = 720.6 SF TOTAL CLASS I MATERIALS = 962 SF PERCENTAGE OF FAÇADE = 79% CLASS II MATERIAL BREAKDOWN (MAXIMUM 25%) F) EIFS = 216.8 SF G) METAL = 42.2 SF H) WOOD GRAIN PORCELAIN TILE = 0 SF TOTAL CLASS II MATERIALS = 259 SF PERCENTAGE OF FAÇADE = 21% EAST ELEVATION EAST ELEVATION, TOTAL SQUARE FOOTAGE = 1,339.3 SF CLASS I MATERIAL BREAKDOWN (MINIMUM 75%) A) MAIN BRICK = 0 SF B) CAST STONE = 52 SF C) GLAZING = 0 SF D) ACCENT BRICK = 195.4 SF E) STONE = 772.8 SF TOTAL CLASS I MATERIALS = 1020.2 SF PERCENTAGE OF FAÇADE = 76% CLASS II MATERIAL BREAKDOWN (MAXIMUM 25%) F) EIFS = 257.6 SF G) METAL = 61.5 SF H) WOOD GRAIN PORCELAIN TILE = 0 SF TOTAL CLASS II MATERIALS = 319.1 SF PERCENTAGE OF FAÇADE = 24% WEST ELEVATION WEST ELEVATION, TOTAL SQUARE FOOTAGE = 1,819.8 SF CLASS I MATERIAL BREAKDOWN (MINIMUM 75%) A) MAIN BRICK = 539.7 SF B) CAST STONE = 32.1 SF C) GLAZING = 370.2 SF D) ACCENT BRICK = 81.7 SF E) STONE = 389.9 SF TOTAL CLASS I MATERIALS = 1,413.6 SF PERCENTAGE OF FACADE = 78% CLASS II MATERIAL BREAKDOWN (MAXIMUM 25%) F) EIFS = 115.5 SF G) METAL = 112.4 SF H) WOOD GRAIN PORCELAIN TILE = 178.3 SF TOTAL CLASS II MATERIALS = 406.2 SF PERCENTAGE OF FAÇADE = 22 % A B C D E F G H A B C D E F G H A B C D E F G H A B C D E F G H www.f-w.com Engineers | Architects | Surveyors | Scientists INC. DATE: DRAWN: REVIEWED: SHEET TITLE: SHEET NUMBER: PROJECT NO.: PROJECT: DESIGNED: 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com ISSUE: #DATE: DESCRIPTION: 5/ 1 8 / 2 0 2 3 2 : 2 5 : 3 9 P M A3.2 SCHEMATIC RENDERED EXTERIOR ELEVATIONS SYH SCB 0221474.00 LANDLORD WARM DARK SHELL HIGHLAND VENTURES LTD. 10160 HENNEPIN TOWN ROAD, EDEN PRAIRIE, MN 55347 05/05/2023 JMA 03/22/2023 PERMIT SETPERMIT SET SOUTH ELEVATION WEST ELEVATION NORTH ELEVATION EAST ELEVATION www.f-w.com Engineers | Architects | Surveyors | Scientists INC. DATE: DRAWN: REVIEWED: SHEET TITLE: SHEET NUMBER: PROJECT NO.: PROJECT: DESIGNED: 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com ISSUE: #DATE:DESCRIPTION: NOT FOR CONSTRUCTION 4/ 1 7 / 2 0 2 3 1 : 2 8 : 1 5 P M A3.3 EXTERIOR PERSPECTIVE RENDERING SYH SCB 0221474.00 BUSH LAKE VETERINARY CLINIC PUD HIGHLAND VENTURES LTD. 10160 HENNEPIN TOWN ROAD, EDEN PRAIRIE, MN 55347 03/22/2023 JMA PROJECT STATUS PERSPECTIVE RENDERING NOTES 1.POTHOLE ELEVATION OF EXISTING SANITARY SEWER LINE. PER PREVIOUS DESIGN, THE SANITARY SEWER ELEVATION ≈ 826.1'. NOTIFY ENGINEER IF THE SANITARY SEWER IS HIGHER THAN 826.1'. 2.INSTALL TEMPORARY CONSTRUCTION BARRICADE PRIOR TO STARTING ANY DEMO WORK. 3.NOTIFY CHILD CARE CENTER AT LEAST FOUR DAYS PRIOR TO STARTING ANY WORK ON THE DAYCARE PARCEL. REVIEWED: DESIGNED: DRAWN: SHEET TITLE: SHEET NUMBER: FIELD BOOK NO.: EXISTING TOPOGRAPHY & DEMOLITION PLAN C11 IR JWL IR - ---- 1 SCALE: EXISTING TOPOGRAPHY & DEMOLITION PLAN 1"=20'NO R T H 0 U.S. SURVEY FEET 10 20 40 PROJECT: DATE: PROJECT NO.: BUSH LAKE VETERINARY CLINIC 10160 HENNEPIN TOWN RD. EDEN PRAIRIE, MN 03/08/2023 0221474.00 DESCRIPTION:DATE:# ISSUE: NOT FOR CONSTRUCTION Project Status www.f-w.com INC. Engineers | Architects | Surveyors | Scientists 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com NOTES: 1.FIELD VERIFY LOCATION AND INVERT ELEVATION OF EXISTING 8" SANITARY SEWER STUB. NOTIFY ENGINEER OF ANY DISCREPANCY. 2.INSTALL TEMPORARY CONSTRUCTION BARRICADE PRIOR TO STARTING DEMOLITION WORK. 3.NOTIFY ADJACENT PROPERTY OWNER AT 10160 HENNEPIN TOWN ROAD, EDEN PRAIRIE, MN, AT LEAST FOUR (4) DAYS PRIOR TO START OF CONSTRUCTION ON ADJACENT PARCEL. 4.NO CONSTRUCTION THROUGH-ACCESS ON ADJACENT PARCEL AT ANY TIME. 1 04/14/2023 CITY OF EDEN PRAIRIE COMMENTS 1 WATER TABLE ELEVATIONS 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W G G G G G G G G G G PROPOSED 20' DRAINAGE AND UTILITY EASEMENT 12'' ST 12'' ST 12'' ST 8'' S T 8'' S T 12'' ST 12'' S T 6'' S A 6'' S A 6'' S A 6'' S A 6'' S A 12'' S T 12'' S T 8'' S T 8'' S T 1 2 ' ' S T 1 2 ' ' S T 12' ' S T 1 2 ' ' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T E E E 6'' W 6'' W 6'' W 6'' W 6'' W 20' S I D E Y A R D S E T B A C K ( B U I L D I N G ) 1 2 F R O N T Y A R D S E T B A C K ( P A R K I N G ) PROPOSED BUILDING 5,074 SQ FT 35' FRON T Y A R D S E T B A C K ( B U I L D I N G ) 9. 5 ' T Y P 9. 5 ' T Y P 20' 9. 5 ' T Y P 9. 5 ' T Y P 11' 9.5 ' TY P 18 ' 3 9 6 10 4 25.4 ' ISLAND A ISLAND C 9. 3 ' 1 5 . 9 ' ISLAND B R=5' R=5' 10'x10' DUMPSTER ENCLOSURE R=5' R=5' R=10' R=5' R=5' R=5' R=5' R=2' R=2' R=10' R=5' 24' 18' 7' 18' 25' 20' 7' 2 18.5 ' UNDERGROUND STORMWATER DETENTION FACILITY SEE SHEET C4.1 100 SF PET ENCLOSURE 5' 5. 5 ' 3 5 ' S E T B A C K ( B U I L D I N G ) 5' 5' 9' 7' 16' REVIEWED: DESIGNED: DRAWN: SHEET TITLE: SHEET NUMBER: FIELD BOOK NO.: SITE LAYOUT PLAN C1 IR JWL IR - ---- 1 SCALE: SITE LAYOUT PLAN 1"=20'NO R T H 0 U.S. SURVEY FEET 10 20 40 SITE SUMMARY PARKING SUMMARY PARKING RATIO =5 SPACES / 1,000 SQ FT PARKING REQUIRED =26 ADA PARKING REQUIRED =2 PROVIDED SPACES: STANDARD PARKING PROVIDED =32 ADA PARKING PROVIDED =2 TOTAL PROVIDED =34 PARKING SPACE DIMENSIONS =9.5' x 18' MIN BIKE PARKING = PARKING LOT CALCULATIONS: PARKING ISLAND A =173 SQ FT PARKING ISLAND B =297 SQ FT PARKING ISLAND C =430 SQ FT PARKING ISLANDS TOTAL AREA =900 SQ FT TOTAL PARKING LOT AREA =13,474 SQ FT PERCENT PARKING ISLANDS =6.7 % IMPERVIOUS AREA = 22,281 SQ FT (0.512 AC) BUILDING FOOTPRINT = 5,074 SQ FT (0.116 AC) PAVEMENT = 17,207 SQ FT (0.395 AC) PERVIOUS AREA = 29,188 SQ FT (0.670 AC) TOTAL SITE AREA = 51,469 SQ FT (1.182 AC) PERCENT IMPERVIOUS = 43.3% TOTAL DISTURBED AREA = 32,780 SQ FT (0.753 AC) ZONING AND BUILDING LAYOUT LEASING AREAS: (1) VETERINARY CLINIC =3,958 SQ FT (2) RETAIL AND MISC. USE =1,015 SQ FT (3) LANDLORD SPACE =101 SQ FT BASE AREA RATIO =0.103 FLOOR AREA RATIO =0.103 AVERAGE LOT SIZE =51,895 SQ FT (1.191 AC) NOTES: 1.PROJECT WILL BE COMPLETED IN 1 PHASE. 2.PROJECT LIES OUTSIDE JAZB AIRPORT ZONES. 3.PROJECT SITE CONTAINS NO BLUFF AREAS. PROJECT: DATE: PROJECT NO.: BUSH LAKE VETERINARY CLINIC 10160 HENNEPIN TOWN RD. EDEN PRAIRIE, MN 03/08/2023 0221474.00 DESCRIPTION:DATE:# ISSUE: NOT FOR CONSTRUCTION Project Status www.f-w.com INC. Engineers | Architects | Surveyors | Scientists 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com 1 04/14/2023 CITY OF EDEN PRAIRIE COMMENTS 2 05/08/2023 CITY OF EDEN PRAIRIE COMMENTS 3 3 3 05/19/2023 CITY OF EDEN PRAIRIE COMMENTS 3 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W G G G G G G G G G G PROPOSED 20' DRAINAGE AND UTILITY EASEMENT 12'' ST 12'' ST 12'' ST 8'' S T 8'' S T 12'' ST 12'' S T 6'' S A 6'' S A 6'' S A 6'' S A 6'' S A 12'' S T 12'' S T 8'' S T 8'' S T 1 2 ' ' S T 1 2 ' ' S T 12' ' S T 1 2 ' ' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T E E E 6'' W 6'' W 6'' W 6'' W 6'' W PROPOSED BUILDING 5,500 SQ FT FFE = 841.0084 0 838 839 841 842 840.25FL 840.10FL 837.60FL 836.96FL 840.83P 840.83P 840.83 840.83 840.83 L O D LO D LOD LOD LOD L O D LO D L O D L O D L O D L O D L O D LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LOD 840.92 840.92 840.92 2. 5 1 % 4. 9 0 % 84 0 838 8 3 9 840 837 838 839 8 4 0 84 5 84 2 84 3 84 4 840.92 8 4 3 842 844 845 846 8 4 2 8 4 3 8 4 4 4. 3 2 % 839.22FL 838.40 837.15 839.55 840.68TC 840.18FL 840.75TC 840.25FL 839.85P 840.39TC 839.89FL 843.00TC 842.50FL 840.85TC 840.35FL 840.90P 842.04TC 841.54FL 8 4 3 . 4 5 T C 8 4 2 . 9 5 F L 838.72TC 838.22FL 838.34TC 837.84FL 837.20FL 836.75FL 837.66FL 837.29FL 840.19FL 842.31FL 839.95 840.00 836.45FL 840.64FL 842.41FL 842.54FL 840.02FL 839.76FL 84 0 841 840.72P839.80 840.84P 840.84P 840.72P 840.88P 840.88P 840.92 840.92840.92 840.92 840.80P 836.44FL 835.85FL 838.83P 840.72P 843.12P 840.10TC 840.10P 840.10TC 840.10P 840.56TC 840.06FL 839.82P 839.88P 840 8 4 0 837.00 838.15 838.70FL 6'' ST 6'' ST 6'' ST 6'' ST 6'' ST LOD LOD 1.67% 839.80TC 839.30FL 839.93TC 839.43FL 840.12TC 839.62FL 840.00TC 839.50FL 840.64TC 840.14FL 840.07FL 839.75FL 839.65FL 840.72TC 840.22FL 839.82839.92 839.88839.98 840.05P 839.96P 840.75P 840.72P 840 REVIEWED: DESIGNED: DRAWN: SHEET TITLE: SHEET NUMBER: FIELD BOOK NO.: SITE GRADING PLAN C1 IR JWL IR - ---- 1 SCALE: SITE GRADING PLAN 1"=20'NO R T H 0 U.S. SURVEY FEET 10 20 40 NOTES: 1.REFER TO PLUMBING PLANS FOR BUILDING UTILITY CONNECTION DETAILS. WATER TABLE ELEVATIONS SOIL BORING APPROXIMATE ELEVATION B-1 830.00 ± B-2 NOT ENCOUNTERED B-3 825.00 ± B-4 NOT ENCOUNTERED B-5 835.00 ± B-6 833.50 ± BASED ON SUBSURFACE EXPLORATION AND FOUNDATION EVALUATION REPORT, PERFORMED BY PROFESSIONAL SERVICE INDUSTRIES, INC. LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE UNDERGROUND DETENTION FACILITY SEE SHEET C4.1 PROJECT: DATE: PROJECT NO.: BUSH LAKE VETERINARY CLINIC 10160 HENNEPIN TOWN RD. EDEN PRAIRIE, MN 03/08/2023 0221474.00 DESCRIPTION:DATE:# ISSUE: NOT FOR CONSTRUCTION Project Status www.f-w.com INC. Engineers | Architects | Surveyors | Scientists 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com 2 SCALE: ACCESSIBLE ROUTE GRADING 1"=10'NOR T H 2 C3.1 2 05/08/2023 CITY OF EDEN PRAIRIE COMMENTS 100-YR OVERFLOW PATH DRAINING TO EXISTING POND 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W G G G G G G G G G G 12'' ST 12'' ST 12'' ST 8'' S T 8'' S T 12'' S T 12'' S T 6'' S A 6'' S A 6'' S A 6'' S A 6'' S A 12'' S T 12'' S T 8'' S T 8'' S T 1 2 ' ' S T 1 2 ' ' S T 12' ' S T 1 2 ' ' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T 6'' S T E E E 6'' W 6'' W 6'' W 6'' W 6'' W (3) RIB ALP (5) TAX DEN (1) ACE ARM (3) COR ACT (1) ACE ARM (3) COR ACT (5) TAX DEN (3) RIB ALP (1) ACE ARM (1) AME GRA (1) CAR OVA (11) TAX DEN (2) GLE SHA (1) CAR OVA (1) CAR OVA (2) ACE ARM (3) GLE SHA (3) RHU GRO (1) ACE ARM (4) TAX DEN (1) CEL OCC (8) HEM HAP (3) PER LIT (4) HEM HAP (1) TAX DEN (14) CAL KAR (7) CAL KAR (4) TAX DEN (25) HEM HAP LOD LOD LOD LO D LO D LOD LOD LOD LOD LOD LOD L O D L O D L O D L O D L O D LO D L O D LOD LOD LOD L O D L O D (5) COR ACT (2) CAR OVA (1) CAR OVA (1) TIL MCL (2) TIL MCL (2) TIL MCL (1) QUE MAC (1) QUE MAC (1) QUE MAC (5) CEL OCC (1) QUE MAC SPADE CUT EDGE, TYP SPADE CUT EDGE, TYP SPADE CUT EDGE, TYP SPADE CUT EDGE, TYP TREES QTY BOTANICAL NAME COMMON NAME SIZE ACE ARM 6 Acer x freemanii `Armstrong`Armstrong Freeman Maple 2.5" Cal AME GRA 1 Amelanchier x grandiflora `Autumn Brilliance``Autumn Brilliance` Serviceberry 6` Tall Multi-Stem CAR OVA 6 Carya ovata Shagbark Hickory 3.5" Cal CEL OCC 6 Celtis occidentalis Common Hackberry 2.5" Cal GLE SHA 5 Gleditsia triacanthos inermis 'Shademaster'Shademaster Honeylocust 3.5" Cal QUE MAC 4 Quercus macrocarpa Burr Oak 3.5" Cal TIL MCL 5 Tilia americana 'McKSentry'American Sentry® Linden 2.5" Cal SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE COR ACT 11 Cornus stolonifera `Arctic Fire`Arctic Fire Dogwood 5 gal RHU GRO 3 Rhus aromatica `Gro-Low`Gro-Low Fragrant Sumac 5 gal RIB ALP 6 Ribes alpinum Alpine Currant 5 gal TAX DEN 30 Taxus x media `Densiformis`Dense Yew 5 gal GRASSES QTY BOTANICAL NAME COMMON NAME SIZE CAL KAR 21 Calamagrostis x acutiflora `Karl Foerster`Feather Reed Grass 24" Tall ANNUALS/PERENNIALS QTY BOTANICAL NAME COMMON NAME SIZE HEM HAP 37 Hemerocallis x `Happy Returns`Happy Returns Daylily 1 GAL PER LIT 3 Perovskia atriplicifolia `Little Spire` TM Little Spire Russian Sage 1 GAL GROUND COVERS QTY BOTANICAL NAME COMMON NAME SIZE 3,154 sf Mulch Shredded Hardwood mulch 3" Depth Color: Natural 7,479 sf Turf Seed RTF Rhizomatous Tall Fescue Seed Seed PLANT SCHEDULE PROJECT: DATE: PROJECT NO.: EDEN PRAIRIE SITE IMPROVEMENTS 10160 HENNEPIN TOWN RD. EDEN PRAIRIE, MN 03/07/2023 0221474.00 DESCRIPTION:DATE:# ISSUE: NOT FOR CONSTRUCTION Project Status www.f-w.com INC. Engineers | Architects | Surveyors | Scientists 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com REVIEWED: DESIGNED: DRAWN: SHEET TITLE: SHEET NUMBER: FIELD BOOK NO.: PLANTING PLAN L11 MBH MBH JLH - ---- 1 SCALE: PLANTING PLAN 1"=20'NO R T H 0 U.S. SURVEY FEET 10 20 40 PROJECT: DATE: PROJECT NO.: EDEN PRAIRIE SITE IMPROVEMENTS 10160 HENNEPIN TOWN RD. EDEN PRAIRIE, MN 03/07/2023 0221474.00 DESCRIPTION:DATE:# ISSUE: NOT FOR CONSTRUCTION Project Status www.f-w.com INC. Engineers | Architects | Surveyors | Scientists 8910 PURDUE ROAD, SUITE 680 INDIANAPOLIS, INDIANA 46268 (317) 664-8100 / info@f-w.com CODE AREAS CODE REQUIREMENT QUANTITY REQUIRED PROVIDED TOTAL CALIPER INCHES REQUIRED FOR SITE MINIMUM CALIPER INCHES REQUIRED = DIVIDE BUILDING SF BY 320 7,084 SF / 320 = 22 CALIPER INCHES 23 CALIPER INCHES PARKING LOT SCREENING 3' HEIGHT HEDGE 3' HEDGE 3' HEDGE PARKING LOT ISLANDS PLANTED WITH PLANT MATERIAL PLANTED WITH PLANT MATERIAL PLANTED WITH SHRUBS AND TREE REPLACEMENT CALIPER INCHES TOTAL NUMBER OF CALIPER INCHES MUST BE REPLACED 193 CALIPER INCHES 95 CALIPER INCHES GENERAL NOTES 1.SEE SHEET L2.1 FOR GENERAL PLANTING NOTES AND PLANTING DETAILS. 1 04/14/2023 CITY OF EDEN PRAIRIE COMMENTS 2 05/08/2023 CITY OF EDEN PRAIRIE COMMENTS 3 05/19/2023 PUD COMMENTS # D a t e C o m m e n t s Ch e c k e d B y : Sc a l e : Revisions Page 1 of 2 Da t e : 5 / 8 / 2 0 2 3 Dr a w n B y : A l e c B e a v e r s ***DISCLAIMER*** BASED ON THE INFORMATION PROVIDED, ALL DIMENSIONS AND LUMINAIRE LOCATIONS SHOWN REPRESENT RECOMMENDED POSITIONS. THE PROJECT ENGINEER AND/OR ARCHITECT MUST DETERMINE APPLICABILITY OF THE LAYOUT TO EXISTING OR FUTURE FIELD CONDITIONS. THE LIGHTING DATA REPRESENTS ILLUMINATION LEVELS TAKEN FROM A LABORATORY SETTING UNDER CONTROLLED CONDITIONS IN ACCORDANORY SETTING UNDER CONTROLLED CONDITIONS IN ACCORDANCE WITH THE ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA) APPROVED METHODS. ACTUAL PERFORMANCE MAY VARY DUE TO VARIATIONS IN ELECTRICAL VOLTAGE, INSTALLATION, TOLERANCE LEVELS, BUILDINGS, OTHER LIGHTING, AND OTHER VARIABLES THAT WERE NOT CONSIDERED WHEN THIS PHOTOMETRIC REPORT WAS CREATED. IT IS THE RESPONSIBILITY OFTHE OWNER OR PROJECT ENGINEER TO ENSURE COMPLIANCE OF ALL STANDARDS IN EFFECT. THIS PHOTOMETRIC LAYOUT IS THE PROPERTY OF VERTICAL LIGHTING + CONTROLS AND IT CANNOT BE USED FOR INSTALLATION OF PRODUCTS OTHER THAN SPECIFIED.THIS DRAWING IS FOR ESTIMATING PURPOSES ONLY, FINAL CONSTRUCTION DRAWINGS, LIGHTING LAYOUTS AND CALCULATIONS ARE THE RESPONSIBILITY OF A LICENSED ARCHITECT OR ENGINEER. IN NO EVENT SHALL VERTICAL LIGHTING + CONTROLS BE LIABLE FOR ANY DIRECT, INDIRECT, CONSEQUENTIAL,PUNITIVE, SPECIAL OR INCIDENTAL DAMAGES (INCLUDING, WITHOUT LIMITATION, DAMAGES FOR LOSS OF PROFITS, BUSINESS INTERRUPTION, OR LOSS OF INFORMATION) ARISING OUT OF THE USE OR INABILITY TO USE THIS DOCUMENT OR ITS CONTENT, EVEN IF VERTICAL LIGHTING + CONTROLS HAS BEEN ADVISED OF THE POSSIBILTY OF SUCH DAMAGES. VERTICAL LIGHTING + CONTROLS MAKES NO REPRESENTATIONS OR WARRANTEIS WITH RESPECT TO THE ACCURACY OR COMPLETENESS OF THE CONTENTS OF THIS DOCUMENT. IN ALL INSTANCES, IT IS RECOMMENDED HAVE A PILOT INSTALLATION IN PLACE TO VERIFY LIGHT LEVELS AND APPEARANCE ARE WHAT IS EXPECTED PRIOR TO COMPLETING A TOTAL INSTALLATION AND LAYOUT OF THE PRODUCT(S). Ed e n P r a i r i e Si t e P l a n Luminaire Schedule Symbol Calculation Summary Label CalcType Units Qty Tag Label Arrangement Description Lum. Watts Arr. Watts Total Watts Avg Max LLF Min Avg/Min Max/Min Building Perimeter 7 C1 ACLS-5000L-40K-DIM-NO-GY Illuminance Fc Single XtraLight Architectural Canopy Light, 48W, 5,000lm, 4000K, 0-10 V Dimming, 120-277v, Grey Finish 48 48 336 0.950 10.65 40.4 0.4 26.63 3 S1 TL-150-H4-4K-U-BZ-HSS Single Unite Talon Area Light, 150W, Type 4, 4000K, 120-277v, Bronze Pole Mount, House Side Shield 151.771 151.771 455.313 101.00 Lot Calcs Illuminance Fc 0.950 2.19 8.7 0.1 21.90 87.00 Property Line Illuminance Fc 0.03 0.5 0.0 N.A. 5 W1 WPGP-40-40@20W 4000K Single ATG Guard Pack, Selectable Wattage(10W,20W,28W,40W) Set to 20W, CCT Selectable(3K,4K,5K) Set to 4000K 20 20 100 0.950 N.A. Scale: 1 inch= 23 Ft. PROPERTY LINE P R O P E R T Y LIN E INV=833.1 RIM=837.1 CB 12" HDPE 12" HDPE 8" PVC (PER PLAN) ? HENNEPIN TOWN ROAD R / W V A R I A B L E W I D T H P T A 20.0 5 5 10 18 18 13 (BITUMINOUS PUBLIC STREET) SHED 12" HDPE 12" HDPE LOT 2LOT 1 16 C1 MH: 10 C1 MH: 10 MH: 10 C1 MH: 10 C1 C1 MH: 10 MH: 10 C1 C1 MH: 10 MH: 20 S1 MH: 20 S1 MH: 20 S1 W1 MH: 12 MH: 12 W1 W1 MH: 12 MH: 12 W1 MH: 12 W10.4 0.4 0.5 0.5 0.5 0.7 0.5 0.7 0.8 0.8 0.8 1.1 0.8 1.1 1.3 1.3 1.2 1.1 1.5 4.2 1.1 1.9 2.3 2.3 1.9 1.5 1.3 1.9 6.4 3.1 4.2 4.5 3.4 2.3 1.6 1.4 2.8 6.0 8.1 5.9 3.3 2.0 1.4 7.4 6.9 4.1 2.4 1.6 1.3 5.8 4.6 0.1 3.7 2.1 1.5 1.3 1.2 1.1 1.2 1.1 0.7 1.5 1.3 1.3 1.3 1.2 1.1 0.9 0.7 0.6 1.5 1.7 1.7 1.5 1.2 0.9 0.7 0.5 2.3 2.8 3.0 2.5 1.8 1.2 0.9 0.6 0.5 5.1 5.8 4.6 2.8 1.7 1.1 0.8 0.6 8.5 7.1 4.1 2.3 1.4 1.0 0.8 0.6 7.1 2.6 1.6 1.2 1.0 2.2 1.5 1.2 1.2 1.0 1.2 1.2 1.4 1.6 1.8 0.3 0.5 0.8 1.1 1.7 2.6 3.3 0.5 0.9 1.4 2.5 4.4 6.4 0.6 1.0 6.4 8.7 5.1 0.4 2.4 1.2 0.7 0.8 8.9 4.7 1.4 2.7 4.0 9.7 13.2 9.4 14.6 1.6 2.5 40.4 14.0 4.3 2.2 1.2 20.9 8.8 10.3 9.0 3.1 1.7 2.7 5.3 11.5 1.2 1.7 1.6 3.1 2.5 1.7 3.3 5.2 11.5 8.0 9.1 35.5 12.0 5.8 22.7 18.6 5.9 3.5 7.6 7.9 1.7 1.7 20.9 3.2 4.5 27.3 32.7 19.6 11.6 6.6 39.8 23.7 7.1 10.6 3.6 14.4 2.5 3.6 9.6 7.5 14.2 9.9 6.2 9.4 10.8 24.5 28.7 32.6 11.3 37.6 22.9 7.6 20.6 9.2 12.5 5.9 2.2 17.9 39.8 3.5 7.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.3 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Neighborhood Meeting Notes ● Concern with the curve driving southbound on Hennepin Town Rd and the 40-mph speed limit. It is hard to exit from Belmont Ln turning southbound - as cars come around the bend quickly. Made it clear it's already an issue and our site being developed is not of major concern. Discussed the Belmont Lane access issue with our traffic engineer. It is his opinion that the minimum sight distance requirement outlined in the MN DOT criteria is not met for the Belmont Lane access due to the existing trees located along the west side of Hennepin Town Road; it is difficult to see traffic coming southbound towards the Belmont Lane access. The driveway for the veterinary clinic will provide adequate sight distance to make the SB left turn lane in his opinion as there are not trees impacting the sight lines... ○ Complaints have been put into the city but no luck with change so far ○ Belief that our development may help remedying the situation Though we hope the development of this site will help with the speed issue, we must follow the City’s direction and defer to their recommendations. ○ Solutions - flashing lights to warn traffic of slowdown after bend and reduced speed limit ● Belief that this site should be developed. Direct quote - "it's gotta be developed" and "this will clean up the area" ● Asked if there is a plan for suite B Small office space or retail ● Asked if there is any kennel or boarding There will be no boarding at this location nor exterior dog run. ● Asked if there are speed bumps in the parking lot - concern for the childcare side Do not recommend installation of speed bumps. This will affect snow removal during the winter months. Recommend “children at play” or similar signage near the connection point with the daycare parking/drive area. ● Asked if childcare is ok with shared driveway Highland has reached out to the owner multiple times. We have not received a response yet. ● Asked if we wanted to buy the Holiday property. They wanted Bush Lake to build a bigger building on the 3- acre parcel. Not at this time. ● Asked about length of time to construct and when we will break ground Breaking ground date dependent on city review process. Once permits have been released, we anticipate a 7-month build. ● In general, excited about this development, believes it adds value to their community. But only concerned with safety in regards to traffic speed ● Total of 15 residents attended the meeting ● Total of 4 residents who emailed Mike Kohne questions prior to the meeting. ○ Email Notes: ○ Traffic concerns similar to what is listed above ○ Supportive of the veterinary use, they like the idea of having a vet on that parcel ○ Suggested a NO LEFT TURN out the north egress due to the traffic moving southbound on Hennepin Town Rd See response above – our traffic engineer does not see the SB turn movement as an issue from the drive location. ● Suggested discussing peak traffic hours with Assistant City Engineer Carter Schulze. 952 949 8339. Previously provided a traffic and sight distance assessment to the city. We will follow up with Carter during the week of March 6th and provide an update. Had follow up with Carter and he stated he has the peak traffic volumes in the traffic summary we provided prior to the neighborhood meeting. STAFF REPORT TO: Planning Commission FROM: Beth Novak-Krebs, Senior Planner DATE: May 22, 2023 SUBJECT: Kiwatchi Development LOCATION: 6285 Duck Lake Road REQUEST: • Zoning Change from Rural to R1-9.5 on 2.11 acres • Preliminary Plat of 4 lots and 3 outlots on 2.11 acres BACKGROUND The applicant is requesting approval to divide one parcel into 4 single family lots and 3 outlots. The 2.11-acre property is located at 6285 Duck Lake Road located at the corner of Duck Lake Road and Claycross Way. Currently, there is a single-family home in the southwest corner of the property. The land is generally flat with some trees and a small piece of wetland along the east property line. There are residential uses to north, south and west and a wetland and residential to the east. The proposed lots range in size from 10,980 square feet to 17,621 square feet. Three of the lots will front on Duck Lake Road while one of the lots will front on Claycross Way. COMPREHENSIVE PLAN AND ZONING The property is guided Low Density Residential in Aspire 2040, which allows a density of 0.1-5 units per acre. The proposed density is 1.9 units per acre, which is consistent with the density ranges provided in the Comprehensive Plan. The property is currently zoned Rural. The applicant is requesting a rezoning to the R1-9.5 Zoning District. The zoning of the surrounding properties includes R1-9.5 to the west and R1-13.5 to the north, south and east. The lot sizes and character of the proposed lots are similar to the surround lots. The proposed lots are consistent with the character of the neighborhood. Project Site Staff Report – Kiwatchi Subdivision Page 2 2 PRELIMINARY PLAT The applicant is proposing a preliminary plat that would create 4 lots with one of the lots to include the current single-family home. The applicant intends to demolish the existing home in the summer of 2023. There is a small wetland area along the east property line. This small wetland area is connected to the larger wetland on the City-owned property to the east. The wetland buffer on the west side of the wetland extends onto the subject property. Outlot A will encompass the small wetland area, the buffer, and the stormwater pond. The applicant is proposing to deed Outlot A to the City as it is directly adjacent to City-owned property. The applicant is proposing to sell the land encompassed by Outlots B and C to the adjacent property owners to the north. Once the property has been transferred to the adjacent property owners, they will need to go through a process to combine their current lot and the new Project Site Project Site Current Zoning Proposed Zoning Staff Report – Kiwatchi Subdivision Page 3 3 Outlot to create one larger lot for each of them. TREE REPLACEMENT PLAN The project requires 109 caliper inches for tree replacement. The caliper inches proposed for tree replacement is 92.5 caliper inches. The plan includes canopy and evergreen trees. There is a stand of trees at the back of proposed Lot 1, and the applicant is proposing to preserve some of those trees. In order to comply with City Code, the applicant has agreed to pay the fee in lieu of tree replacement for 16.5 caliper inches. The applicant has provided a Phasing Plan for the tree replacement. The trees closest to the building pads will be installed after the construction of each of the homes is complete. This ensures that those trees will not be damaged during construction. The trees further behind the house pads will be installed once the grading of the site is complete. SIDEWALKS There is an existing sidewalk on the west side of Duck Lake Road from Duck Lake Trail to Highway 62. There is also a sidewalk on the east side of Duck Lake Road, but it only extends from Duck Lake Trail to Claycross Way. The applicant will be constructing a sidewalk along its frontage of Duck Lake Road. There are no sidewalks along Claycross Way, and no sidewalks are recommended. PHASE I AND II ENVIRONMENTAL SITE ASSESSMENTS (ESA) A Phase I ESA was prepared for the property. Over the years, construction waste was dumped in the northwest corner of the property and covered with gravel. The material in this area is considered undocumented fill and is identified as a Recognized Environmental Condition (REC) because of the potential for this area to contain contaminants. There is a statement in the Phase I ESA that this area is an environmental concern. Given this information, the City required the applicant to prepare a Phase II ESA. A Phase II Environmental Site Assessment (ESA) was conducted in the vicinity of historic fill identified in the Phase I ESA. One boring identified levels of Polycyclic Aromatic Hydrocarbons (PAHs) that are above acceptable levels for residential fill. The boring is also within an area where geotechnical corrections are recommended for structural support. Thus, as recommended in the Phase II ESA, any material removed from within a 20 foot radius of the boring with elevated PAH levels must be removed and disposed of in accordance with Minnesota Pollution Control Agency protocols. This will be incorporated into the Development Agreement. DRAINAGE Stormwater for the site is managed at one centralized infiltration basin. Runoff collected by catch basins within the right of way within Duck Lake Road and Claycross Way is discharged to the basin for treatment. The basin is within an outlot and will be owned and maintained by the City. UTILITIES There are existing water mains and sanitary sewer mains along both Duck Lake Road and Claycross Way. The homes can be connected to the existing sewer and water system. There are sewer and water services stubbed in front of the existing home on Duck Lake Road; however, the existing home is not connected to those stubs and Staff Report – Kiwatchi Subdivision Page 4 4 still has a well and septic system. There is an existing sanitary sewer stubbed in front of proposed Lot 2. Staff recommends that the applicant utilize the existing sanitary sewer and water stubs to reduce the number of cuts into the adjacent streets to provide those services. NEIGHBORHOOD MEETINGS AND RESIDENT INPUT On August 12, 2022, the applicant held a neighborhood meeting. The meeting was held via zoom from 6:00 pm to 7:00 pm. According to the applicant, 7 neighbors attended the neighborhood meeting. Based on a summary provided by the applicant, there were questions about stormwater, the number of proposed lots, the plans for demolishing the existing home, cost of the lots and timing on project completion. SUSTAINABILITY The applicant is proposing a number of sustainable features in this project as listed below: • Use of energy efficient fixtures and appliances • Installation of EV-ready circuits for future charging stations in each garage • Preserving the wetland area on the east side of the property • Eliminating an invasive species (Japanese Knotweed) to prevent it from spreading to other areas. STAFF RECOMMENDATION Recommend approval of the following requests: • Zoning Change from Rural to R1-9.5 • Preliminary Plat of 4 lots and 3 outlots on 2.11 acres This is based on plans submitted on May 5, 2023, staff report dated May 22, 2023 and the following conditions: 1. Prior to release of the Final Plat, the applicant shall A. Sign special assessment agreement for City trunk sewer and water assessment fees and connection fees. B. Submit detailed storm water runoff, utility and erosion control plans for review by the City Engineer and Watershed District. C. Tender a warranty deed for Outlot A for review and written approval by the City Engineer. After approval of the warranty deed and filing of the final plat, file the warranty deed with Hennepin County. D. Provide copies of legal documents, either in Homeowners Association format or private covenant and agreement format to be approved by the City. E. Submit a bond, letter of credit, or cash deposit (“security”) that guarantees completion of all public improvements equivalent to 125% of the cost of the improvements. 3. Prior to land alteration permit issuance, the applicant shall: A. Submit detailed storm water runoff, wetland, utility, street and erosion control plans for review and approval by the City Engineer. Staff Report – Kiwatchi Subdivision Page 5 5 B. Submit an executed landscape agreement and final tree replacement plan. C. Submit a landscaping letter of credit or escrow surety equivalent to 150% of the cost of the tree replacement. D. Obtain and provide documentation of Watershed District approval. E. Notify the City and Watershed District 48 hours in advance of grading. F. Install erosion control at the grading limits of the property for review and approval by the City. G. Submit a land alteration bond, letter of credit, or escrow surety equivalent to 125% of the cost of the land alteration. H. Submit a wetland protection bond, letter of credit, or escrow surety equivalent to 150% of the wetland plan requirements included in the Development Agreement. I. Provide information about the method intended to be used to eradicate the Japanese Knotweed. 4. Prior to building permit issuance for the lots, the applicant shall: A. Pay the appropriate cash park fees. B. Provide recorded copies of any Home Owner Association documents or private covenants and agreements, and the warranty deed for Outlot A to the City following recording of the final plat. C. Submit construction plans and project specifications for public infrastructure for review and approval by the City Engineer. 1 PROJECT NARRATIVE August 25, 2022 Revised August 30, 2022 Revised September 21, 2022 Revised April 11, 2023 Eden Prairie Planning Commission City of Eden Prairie Re: Application for Preliminary Residential Development KIWATCHI Craig Schmidt, 6285 Duck Lake LLC, is pleased to submit this application for preliminary plat review of KIWATCHI. This narrative is intended to generally describe the project and address specific development topics. Location / Current Use The existing site is a 2.1 acre parcel with one existing house fronting on Duck lake Road. It is located in the northeast quadrant of Duck Lake Road & Claycross Way, abutting both roads. The KIWATCHI Subdivision is intended to improve the current landscape of 6285 Duck Lake Road by building single-family homes within 4 subdivided lots that are similar in size with the existing surrounding homes. Homes that will be built within the subdivision are intended to improve the market values of surrounding homes on both Duck Lake Road and Claycross Way. It is the ultimate desire to connect the surrounding homes alongside the 6285 Duck Lake Road property with similarly valued or higher value homes. NOTE: Lot 4 on Claycross Way will be owned by the land developer and therefore incentive to ensure surrounding homes and lots achieve similar or higher value. Proposed Zoning The current zoning is Rural. The site is proposed to be rezoned and be developed under the R1-9.5 Residential District. The impetus for the R1-9.5 in lieu of the R1-13.5 zoning comes from the Riley Purgatory Bluff Creek Watershed District (RPBCWD). Stormwater runoff from a portion of Duck lake Road and Claycross Way is required to be collected and treated within the on-site pond to comply with the watershed’s rules. Since public water is collected and treated within the site the pond is required to be within Outlot A where the City will maintain ownership. The size requirements of Outlot A preclude lot sizes of 13,500 sf but can allow the proposed lots to be at least 9,500 sf. Specific parameters of the R1-9.5 zone are listed below and show on Table 1. Lots Lot Area Min. 9,500 sf Lot Width Min. 70 ft Lot Width, Corner Min. 100 ft Lot Depth Min. 100 ft 2 Setbacks Front Min. 30 ft Rear Min. 20 ft Side Min. 5/15 ft Side, Street Min. 30 ft Table 1 Block Lot Area (Sq.Ft.) Width @ Front Setback Front Setback Rear Setback Side Setback Side Street Setback House Pad Width House Pad Depth 1 1 17,621 98 30 30 10/15 N/A 60 50 2 10,980 90 30 30 10/15 N/A 60 50 3 Existing House 13,547 132 30 30 10/15 30 60 50 4 12,970 97 30 30 10/15 N/A 60 50 Outlot A 23,112 Outlot B 931 Outlot C 1,549 New Plat ROW 11,133 sf Total Property Area 91,843 sf / 2.11 ac Average Lot Size = 13,780 sf Average Lot Width = 104.3 ft Stormwater Management Currently the site drains to the east into an existing wetland. A portion of the runoff from Duck Lk. Road and Claycross Way is collected and routed into the site and treated in the pond located in Outlot A – per the requirements of the RPBCWD. The proposed improvements will maintain the current drainage pattern. All of the runoff from the site drains towards the backyard areas into the infiltration basin, then overland to the wetland. Additional information and hydraulic calculations can be found in the submitted Stormwater Management Plan (SWMP). The SWMP is required to be reviewed and approved by the Riley Purgatory Bluff Creek Watershed District (RPBCWD). The project is recommended for approval at the April 12, 2023 Board meeting. Wetlands There is a wetland that sneaks into the east portion of the site. The wetland was delineated by Kjolhaug Environmental. The wetland location has been reviewed and approved by the City and is designated as a Manage 2 – Moderate wetland. No wetland impacts are proposed. 3 A 40 foot buffer is required around the wetland. The buffer is shown on the plan and encompassed by Outlot A. Outlot A will be deeded to the City. Wetland buffer signs will be installed around the perimeter of the buffer to provide notification of the wetland boundary. The Outlot and the buffer signs will provide protection for the wetland. Sustainable Features The Builders will be using energy efficient fixtures and appliances. These would be consistent with the applicable utility company and their incentives. The Builders will install EV-ready garage circuits for future car charging systems. A 40 foot buffer area is shown around the wetland the area. In addition, the buffer area is encompassed by and Outlot. The outlot will bed deeded to the City – creating a quasi conservation easement. The site contains area of Japanese Knotweed, an invasive plant species. We are contacting several landscape companies for options to eliminate it. Options may include chemical treatment or removing and disposal of material during grading operations. Green Infrastructure Analysis Preserving natural vegetation. Site grading is minimized to preserve the natural vegetation. 46% of the site area will not be graded, preserving the existing tree and ground cover. Preserving and utilizing natural upland swales, depressions, and upland storage areas in the post-development condition to the degree that they can convey, store, infiltrate, filter, or retain stormwater runoff before discharge. The site has minimal depression and upland storage areas as the site has a consistent slope to the east wetland. However, the preserved areas include the wetland buffer, treed area and swale areas which consist of vegetated ground cover. These vegetated areas will function as filter strips – hindering runoff to promote infiltration and provide up to 50% removal of total suspended solids. (see MN Stormwater Manual, Design, construction, operation and maintenance specifications for pretreatment vegetated filter strips). Minimizing Impervious surface. The site proposes only the minimal amount of impervious surface required. These consist of a house footprint and a driveway for each lot. The plan proposes an infiltration basin which is required to drain dry within 48 hours, so there will be essentially no impervious surface water. Installing permeable pavement. Permeable pavement is not prudent for use in clay type soils without a subsurface collection and drainage system. Trapping water under pavements in non-draining soils will only saturate subgrades and weaken pavements causing failure. Utilizing vegetated areas to filter sheet flow, remove sediment and other pollutants, and increase time of concentration to slow discharge or reduce runoff. See comments above. Disconnecting impervious areas by allowing runoff from small impervious areas to be directed to pervious area where it can be infiltrated of filtered. The proposed impervious areas consist of individual homes and driveways. The home sites are separated by side and back yard areas which are vegetated. Therefore, all runoff from impervious areas drain to vegetated areas where it is filtered. As previously referenced, MPCA states that a filter strip of at least 3 feet in length – in the flow direction - can remove up to 50% of total suspended solids. 4 Install green roofs. Green roofs are typically used in commercial or industrial buildings where the roofs are flat. Residential homes are designed with pitched roofs and cannot accommodate rooftop planting areas. Using irrigation ponds or systems, cisterns, rain barrels and related BMPs’ to reuse runoff. Cisterns and rain barrels to collect rainwater could certainly be used. Builders can encourage potential homeowners to include or install systems that can collect rainwater. Planting of trees for retention and detention of runoff. The preliminary landscape plan does not show trees or plantings around the pond area. However, the plan can be revised to show plantings around the west and south sides of the pond to intercept runoff from the backyard areas. The plantings can absorb water, promote water abstraction, reducing total runoff. Utilizing a soil amendment or decompaction process after site disturbance. Soil amendment is necessary within the infiltration basin. The infiltration rate, as measured by the double-ring infiltrometer test, is 9.3 in/hr. MPCA has a maximum rate of 8.3 in/hr. IT will be required to amend the soil by mixing topsoil with the subgrade material to slow the infiltration rate to below 8.3 in/hr. Also, if any material is inadvertently compacted within the infiltration basin it will need to be decompacted. The basin is shown to be marked in the field with no construction activity until the remaining site is stabilized. Then special equipment, such as wide track dozers, shall be used to construct the basin with minimal compaction to underlying soils. Minimizing parking areas. The project proposes no parking areas. Increase buffers around streams, steep slopes, and wetlands to protect from flood damage and/or provide additional water quality treatment. A 40 foot wide buffer area is provided against the existing wetland. This is more than adequate to remove 50% of more of total suspended solids when compared to the minimum 3 feet recommended by MPCA. The additional 37 feet will provide extra treatment to increase water quality. Thank you for considering this development project. We look forward to your recommendations and approvals. Craig Schmidt 6285 Duck Lake, LLC EDEN PRAIRIE, MINNESOTA EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL WARNING: AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND Gopher State One Call SHEET INDEX PRELIMINARY PLANS FOR: VICINITY MAP DEVELOPER Eden Prairie, MN 55346 17516 Rustic Hills Dr. 6285 DUCK LAKE, LLC TEL: (612) 720-8272 Craig Schmidt C0-1 C1-1 C1-2 1 of 1 C3-1 C3-2 C3-3 C4-1 C4-2 C8-1 L1-1 L1-2 L2-1 L3-1 KIWATCHI PRELIMINARY PLANS PLAT, SITE GRADING, SANITARY & WATER SERVICES LOCATION PROPOSED SITE BENCHMARKS TOP NUT OF HYDRANT LOCATED ON DUCK LAKE ROAD APPROXIMATELY 100 FEET NORTH OF CLAYCROSS WAY, SHOWN HEREON. ELEVATION = 909.39 (NAVD88) Cover sheet Existing conditions Demolition plan Preliminary plat Grading plan SWPPP plan SWPPP notes Utility plan Storm Sewer Profiles Civil Details Tree Preservation Tree Preservation Landscape plan Landscape details CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Pl o t t e d : 05 / 0 5 / 2 0 2 3 9 : 4 8 A M W: \ 2 0 2 1 \ 2 1 6 8 0 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 0 - 1 C O V E R S H E E T OUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION KIWATCHI ADDITION 6285 DUCK LAKE ROAD EDEN PRAIRIE, MN 6285 DUCK LAKE, LLC 17516 RUSTIC HILLS DRIVE EDEN PRAIRIE, MN 55346 Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.21680 TWM HW HW 04/11/23 08/22/22 CITY SUBMITTAL 09/15/22 SOIL BORINGS 01/17/23 WATERSHED COMMENTS 02/16/23 WATERSHED COMMENTS 03/17/23 WATERSHED COMMENTS 04/11/23 CITY SUBMITTAL 05/05/23 CITY COMMENTS C0-1 COVER SHEET C3-1 C8-1 GRADING PLAN CIVIL DETAILS C1-1 EXISTING CONDITIONS C4-1 UTILITY PLAN L1-2 1 of 1 PRELIMINARY PLAT L2-1 L3-1 LANDSCAPE DETAILS LANDSCAPE PLANS TREE INVENTORY C3-2 SWPPP PLAN C3-3 SWPPP NOTES C1-2 DEMOLITION PLAN PREL I M I N A R Y L1-1 TREE PRESERVATION C4-2 STORM SEWER PROFILES COVER SHEET C0-1 WETLAND 05-21-B WETLAND 27-820W KNOTWEED AREA 44 44 N SCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Pl o t t e d : 05 / 0 5 / 2 0 2 3 1 1 : 8 A M W: \ 2 0 2 1 \ 2 1 6 8 0 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 1 - 1 E X I S T I N G C O N D I T I O N S OUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION KIWATCHI ADDITION 6285 DUCK LAKE ROAD EDEN PRAIRIE, MN 6285 DUCK LAKE, LLC 17516 RUSTIC HILLS DRIVE EDEN PRAIRIE, MN 55346 Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.21680 TWM HW HW 04/11/23 08/22/22 CITY SUBMITTAL 09/15/22 SOIL BORINGS 01/17/23 WATERSHED COMMENTS 02/16/23 WATERSHED COMMENTS 03/17/23 WATERSHED COMMENTS 04/11/23 CITY SUBMITTAL 05/05/23 CITY COMMENTS C0-1 COVER SHEET C3-1 C8-1 GRADING PLAN CIVIL DETAILS C1-1 EXISTING CONDITIONS C4-1 UTILITY PLAN L1-2 1 of 1 PRELIMINARY PLAT L2-1 L3-1 LANDSCAPE DETAILS LANDSCAPE PLANS TREE INVENTORY C3-2 SWPPP PLAN C3-3 SWPPP NOTES C1-2 DEMOLITION PLAN PREL I M I N A R Y L1-1 TREE PRESERVATION C4-2 STORM SEWER PROFILES EXISTING CONDITIONS C1-1 SPOT ELEVATION SIGN CATCH BASIN CONTOUR SURMOUNTABLE CONCRETE CURB STORM SEWER SANITARY SEWER UNDERGROUND FIBER OPTIC WIRE FENCE WATERMAIN UNDERGROUND ELECTRIC CONCRETE TELEPHONE PEDESTAL ELECTRIC METER GAS METER UNDERGROUND TELEPHONE UNDERGROUND GAS SANITARY SEWER SERVICE WATER SERVICE MAILBOX LOCUST OAK PINE SPRUCE COTTONWOOD MAPLE WALNUT CONIFEROUS TREE DECIDUOUS TREE OVERHEAD UTILITY MISC FRUIT ELEV @ THRESHOLD RECORD DOCUMENT FLARED END SECTION TOP OF CURB SET 1/2 INCH X 14 INCH IRON MONUMENT, MARKED "LS 48988" FOUND 1/2 INCH OPEN IRON FOUND CAST IRON MONUMENT WETLAND FLAG AIR CONDITIONING UNIT TOP NUT HYDRANT FUEL TANK/PUMP ASH EXISTING BUILDING RETAINING WALL STORM MANHOLE SANITARY MANHOLE HYDRANT GATE VALVE MONUMENT UNLESS FIRE CONNECTION WETLAND AS DELINEATED BY KJOLHAUG ENV. SERVICES ON 10/29/2021 MAPPED STORM SEWER MAPPED UNDERGROUND CABLE TV POWER POLE SHOWN OTHERWISE MAPPED UNDERGROUND GAS SURVEY LEGEND N REMOVE EXISTING TREE (TYP.) REMOVE EXISTING GRAVEL DRIVE REMOVE EXISTING BIT. PAVEMENT REMOVE/ABANDON EXISTING SEPTIC SYSTEM REMOVE EXISTING FENCE (TYP.) REMOVE EXISTING FENCE (TYP.) REMOVE EXISTING BUILDING (TYP.) REMOVE EXISTING LIGHT (TYP.) ABANDON EX. WELL SAVE TREE EX. HOUSE & DRIVEWAY TO BE RAZED REMOVE EXISTING CONC. SIDEWALK REMOVE EXISTING CONC. C&G REMOVE EXISTING BITUMINOUS REMOVE PORTION OF EXISTING CURB & BITUMINOUS REMOVE PORTION OF EXISTING CURB, BITUMINOUS, & EX. CATCH BASIN KNOTWEED AREA - EXCAVATE TO 890 AND HAUL OFFSITE N SCALE IN FEET 0 30 60 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Pl o t t e d : 05 / 0 5 / 2 0 2 3 9 : 5 0 A M W: \ 2 0 2 1 \ 2 1 6 8 0 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 1 - 2 D E M O L I T I O N P L A N OUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION KIWATCHI ADDITION 6285 DUCK LAKE ROAD EDEN PRAIRIE, MN 6285 DUCK LAKE, LLC 17516 RUSTIC HILLS DRIVE EDEN PRAIRIE, MN 55346 Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.21680 TWM HW HW 04/11/23 08/22/22 CITY SUBMITTAL 09/15/22 SOIL BORINGS 01/17/23 WATERSHED COMMENTS 02/16/23 WATERSHED COMMENTS 03/17/23 WATERSHED COMMENTS 04/11/23 CITY SUBMITTAL 05/05/23 CITY COMMENTS C0-1 COVER SHEET C3-1 C8-1 GRADING PLAN CIVIL DETAILS C1-1 EXISTING CONDITIONS C4-1 UTILITY PLAN L1-2 1 of 1 PRELIMINARY PLAT L2-1 L3-1 LANDSCAPE DETAILS LANDSCAPE PLANS TREE INVENTORY C3-2 SWPPP PLAN C3-3 SWPPP NOTES C1-2 DEMOLITION PLAN PREL I M I N A R Y L1-1 TREE PRESERVATION C4-2 STORM SEWER PROFILES DEMOLITION PLAN C1-2 1.CONTRACTOR SHALL REMOVE AND/OR RELOCATE EXISTING PRIVATE UTILITIES AS NECESSARY. CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITY COMPANIES. 2.CONTRACTOR SHALL PROTECT SURFACE AND SUBSURFACE FEATURES NOT NOTED FOR REMOVAL. 3. CONTRACTOR TO CLEAR AND GRUB EXISTING VEGETATION WITHIN CONSTRUCTION LIMITS, STRIP TOP SOIL, AND STOCKPILE ON-SITE. REFER TO GRADING PLAN AND SWPPP FOR SEDIMENT AND EROSION CONTROL REQUIREMENTS. 4.CLEAR AND GRUB AND REMOVE ALL TREES, VEGETATION AND SITE DEBRIS PRIOR TO GRADING. ALL REMOVED MATERIAL SHALL BE HAULED FROM THE SITE DAILY. ALL CLEARING AND GRUBBING AND REMOVALS SHALL BE PERFORMED PER THE CONTRACT SPECIFICATIONS. EROSION CONTROL MEASURES SHALL BE IMMEDIATELY ESTABLISHED UPON REMOVAL. SEE THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP). 5.CONTRACTOR SHALL REMOVE ALL SITE SURFACE FEATURES WITHIN REMOVAL LIMITS UNLESS OTHERWISE NOTED. SITE DEMOLITION NOTES REMOVE EXISTING CURB & GUTTER, RETAINING WALLS, FENCE, ETC. REMOVE EXISTING MANHOLES, POWER POLES, LIGHT POLES, BOLLARDS, PARKING METERS, SIGNS, ETC. REMOVE EXISTING CONCRETE PAVING, SIDEWALKS, ETC. REMOVE EXISTING TREES REMOVE EXISTING UTILITIES REMOVE EXISTING BITUMINOUS PAVING DEMOLITION LEGEND: REMOVE EXISTING BUILDING REMOVE EXISTING GRAVEL PAVEMENT WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TOLL FREE: 1-800-252-1166TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! SPOT ELEVATION SIGN CATCH BASIN CONTOUR SURMOUNTABLE CONCRETE CURB STORM SEWER SANITARY SEWER UNDERGROUND FIBER OPTIC WIRE FENCE WATERMAIN UNDERGROUND ELECTRIC CONCRETE TELEPHONE PEDESTAL ELECTRIC METER GAS METER UNDERGROUND TELEPHONE UNDERGROUND GAS SANITARY SEWER SERVICE WATER SERVICE MAILBOX LOCUST OAK PINE SPRUCE COTTONWOOD MAPLE WALNUT CONIFEROUS TREE DECIDUOUS TREE OVERHEAD UTILITY MISC FRUIT ELEV @ THRESHOLD RECORD DOCUMENT FLARED END SECTION TOP OF CURB SET 1/2 INCH X 14 INCH IRON MONUMENT, MARKED "LS 48988" FOUND 1/2 INCH OPEN IRON FOUND CAST IRON MONUMENT WETLAND FLAG AIR CONDITIONING UNIT TOP NUT HYDRANT FUEL TANK/PUMP ASH EXISTING BUILDING RETAINING WALL STORM MANHOLE SANITARY MANHOLE HYDRANT GATE VALVE MONUMENT UNLESS FIRE CONNECTION WETLAND AS DELINEATED BY KJOLHAUG ENV. SERVICES ON 10/29/2021 MAPPED STORM SEWER MAPPED UNDERGROUND CABLE TV POWER POLE SHOWN OTHERWISE MAPPED UNDERGROUND GAS SURVEY LEGEND GRADING LIMITS S A V E T R E E S SAVE TREE LIM I T S SA V E T R E E S 5' WIDE CONC. SIDEWALK 906 904 906 904 904 8 9 8 89 8 90 8 90 6 906 904 90 9 . 0 - G FB W O 90 2 . 0 BS M T 9 0 2 . 0 90 8 . 5 - G FB W O 90 1 . 5 BS M T 9 0 1 . 5 900.0 FBWO 908.0 - FF BSMT 900.0 899.0 901.0 907.8 906.6 TC 898.6 TC 901.8 TC 905.5 TC 906.8 TC 907.5 TC 906.9 TC 906.6 TC 905.7 TC 905.8 TC 907.7 TC 909.4 TC 906.2 TC 906.7 905.0 906.1 903.0 RIM 905.3 91 0 . 0 - F F 90 9 . 5 - F F 904.8 - G INFIL. POND (05-21-I) NWL=DRY 100 YR HWL=897.91 BTM=895.75 90 9 . 0 - G FB W O 90 1 . 0 BS M T 9 0 1 . 0 90 5 . 0 899.0 901.0 TC 902.1 TC 903.0 897.50 899.0 899.0 895.75 907.0 EX. 8. 0 % 6.0% 8.3% 6.7% 90 6 9 0 0 90 0 906 9 0 2 902 89 6 896 902 90 8 89 7 896 908 9 0 8 90 9 . 0 - G FB W O 90 2 . 0 BS M T 9 0 2 . 0 90 8 . 5 - G FB W O 90 1 . 5 BS M T 9 0 1 . 5 900.0 FBWO 908.0 - FF BSMT 900.0 899.0 901.0 907.8 906.6 TC 898.6 TC 901.8 TC 905.5 TC 906.8 TC 907.5 TC 906.9 TC 906.6 TC 905.7 TC 905.8 TC 907.7 TC 909.4 TC 906.2 TC 906.7 905.0 906.1 903.0 RIM 905.3 91 0 . 0 - F F 90 9 . 5 - F F 904.8 - G INFIL. POND (05-21-I) NWL=DRY 100 YR HWL=897.91 BTM=895.75 90 9 . 0 - G FB W O 90 1 . 0 BS M T 9 0 1 . 0 90 5 . 0 899.0 901.0 902.5 TC 902.1 TC 903.0 897.50 899.0 899.0 903.0 907.0 EX. 8. 0 % 6.0% 8.3% 6.7% 897 897 89 5 . 7 5 90 0 90 0 90 0 90 0 90 0 90 2 9 0 2 902 90 2 89 8 898 90 0 898 89 6 89 7 89 8 89 8 899.0 899.0 89 5 . 7 5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 MANAGE 2 (MODERATE) WETLAND HWL=896.21 SAVE TREES GR A D I N G L I M I T S * * SEE DETAIL EX. PP TO REMAIN EX. PP TO REMAIN 8' PED. RAMP MATCH W/ NEW WALK (POWER POLE TO REMAIN) A A POND CROSS SECTION SEE DETAIL PROTECT INFILTRATION AREA - SEE SWPPP STAGING AREA TOPSOIL STOCKPILE STAGING AREA TOPSOIL STOCKPILE IN BUFFER AREA: REMOVE, SALVAGE & RESPREAD EXISTING NATIVE TOPSOIL GR A D I N G 05-21-B SAVE TREES SAVE TREES * STAGING AREA EQUIPMENT PARKING KNOTWEED AREA - EXCAVATE TO 890 AND HAUL OFFSITE PER MN DNR RECOMMENDATIONS * BUFFER LIMITS 36.9 40.2 41.8 TP1 TP3 TP4 TP6 TP7 TP8 TP12 TP11 TP10 TP9 20' BMP ACCESS LANE 20'SEE NOTE 23 GRADING TO BE VERIFIED BY AET 890 895 900 905 890 895 900 905 -0+25 89 9 . 8 6 89 9 . 9 0+00 89 5 . 7 5 89 5 . 8 89 5 . 7 5 89 5 . 8 1+00 1+75 EXISTING GROUND PROFILE PROPOSED POND PROFILE N SCALE IN FEET 0 20 40 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Pl o t t e d : 05 / 0 5 / 2 0 2 3 1 0 : 1 A M W: \ 2 0 2 1 \ 2 1 6 8 0 \ C A D D D A T A \ C I V I L \ _ d w g S h e e t F i l e s \ C 3 - 1 G R A D I N G P L A N OUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION KIWATCHI ADDITION 6285 DUCK LAKE ROAD EDEN PRAIRIE, MN 6285 DUCK LAKE, LLC 17516 RUSTIC HILLS DRIVE EDEN PRAIRIE, MN 55346 Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.21680 TWM HW HW 04/11/23 08/22/22 CITY SUBMITTAL 09/15/22 SOIL BORINGS 01/17/23 WATERSHED COMMENTS 02/16/23 WATERSHED COMMENTS 03/17/23 WATERSHED COMMENTS 04/11/23 CITY SUBMITTAL 05/05/23 CITY COMMENTS C0-1 COVER SHEET C3-1 C8-1 GRADING PLAN CIVIL DETAILS C1-1 EXISTING CONDITIONS C4-1 UTILITY PLAN L1-2 1 of 1 PRELIMINARY PLAT L2-1 L3-1 LANDSCAPE DETAILS LANDSCAPE PLANS TREE INVENTORY C3-2 SWPPP PLAN C3-3 SWPPP NOTES C1-2 DEMOLITION PLAN PREL I M I N A R Y L1-1 TREE PRESERVATION C4-2 STORM SEWER PROFILES DEEP SOIL CORRECTION REQUIRED GRADING PLAN C3-1 SEE GEOTECHNICAL REPORT 73 WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TOLL FREE: 1-800-252-1166TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! SEE STORMWATER POLLUTION PREVENTION PLAN FOR SOIL STABILIZATION INFORMATION. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED AROUND THE ENTIRE SITE PERIMETER AND IN ACCORDANCE WITH NPDES PERMIT REQUIREMENTS, BEST MANAGEMENT PRACTICES, CITY REQUIREMENTS AND THE DETAILS SHOWN ON THE CIVIL DETAILS SHEETS OF THESE PLANS. ALL CURB SPOT ELEVATIONS ARE TO GUTTER LINE, TOP OF BITUMINOUS OR GROUND ELEVATIONS UNLESS NOTED OTHERWISE. 1.SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES, GUTTER/FLOW LINE, FACE OF BUILDING, OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 2.CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS IN GUTTERS SHALL BE SUMPED 0.10 FEET. RIM ELEVATIONS SHOWN ON PLANS DO NOT REFLECT SUMPED ELEVATIONS. 3.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 6 INCHES OF TOP SOIL AND SEED/MULCH OR SOD. THESE AREAS SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR UNTIL VEGETATION IS ESTABLISHED. VERIFY WITH LANDSCAPE PLAN. TOP SOIL SHALL CONSIST OF CLAY, SILT AND SAND IN PROPORTION CONDUCIVE TO THE PROMOTION OF ROOT PENETRATION AND PLANT GROWTH AND MUST HAVE A MINIMUM OF 5% ORGANIC MATERIALS. 4.REFER TO THE REPORT OF GEOTECHNICAL EXPLORATION AND REVIEW (REPORT NO. P-0008230), DATED 01/25/22 - REVISED 10/05/22 AS PREPARED BY AMERICAN ENGINEERING TESTING. FOR AN EXISTING SUBSURFACE SITE CONDITION ANALYSIS AND CONSTRUCTION RECOMMENDATIONS 5.LOT 1 HOUSE CONSTRUCTION MAY REQUIRE DEEP SOIL CORRECTION. REFER TO AET GEOTECHNICAL REPORT DATED 10/05/22 FOR ALTERNATIVES FOR DEEP FOUNDATION SUPPORT SYSTEMS. ADDITIONAL BORING MAY BE REQUIRED. 6.STREETS MUST BE CLEANED AND SWEPT WHENEVER TRACKING OF SEDIMENTS OCCURS AND BEFORE SITES ARE LEFT IDLE FOR WEEKENDS AND HOLIDAYS, OR AS DIRECTED BY CITY. A REGULAR SWEEPING SCHEDULE MUST BE ESTABLISHED. 7.DUST MUST BE ADEQUATELY CONTROLLED. 8.SEE SWPPP FOR ADDITIONAL EROSION CONTROL NOTES AND REQUIREMENTS. 9.SEE UTILITY PLAN FOR WATER, STORM AND SANITARY SEWER INFORMATION. 10.A STREET SWEEPER MUST BE AVAILABLE WITHIN 3 HOURS UPON NOTICE FROM THE CITY THAT THE STREETS NEED TO BE SWEPT. 11.THE CONTRACTOR ALONG WITH THE OWNER SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVALS FROM GOVERNING AUTHORITIES, INCLUDING ANY CITY PERMITS AND THE NPDES PERMIT FROM THE MPCA. 12.INSTALL EROSION CONTROL SILT FENCE AND TREE PROTECTION MEASURES WITH SILT/TREE FENCE BEFORE BEGINNING SITE GRADING ACTIVITIES. SOME EROSION CONTROLS SUCH AS BALE CHECKS AND TEMPORARY SILT PONDS MAY BE INSTALLED AS GRADING OCCURS IN SPECIFIC AREAS. MAINTAIN EROSION CONTROLS THROUGHOUT THE GRADING PROCESS AND REMOVE WHEN TURF HAS BEEN ESTABLISHED. 13.THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS OF THE MPCA NPDES PERMIT. THE AREA TO BE DISTURBED SHALL BE MINIMIZED AND TURF SHALL BE ESTABLISHED WITHIN THE TIME REQUIRED. 14.GRADES SHOWN ARE FINISHED GRADES. 15.FINAL GRADING TOLERANCES ARE +/-0.1 FEET TO FINISH GRADES. 16.UNDER PAVEMENTS COMPACT THE UPPER 3 FEET OF SUBGRADE TO 100% STANDARD PROCTOR DENSITY AT OPTIMUM MOISTURE CONTENT AND 95% STANDARD PROCTOR DENSITY BLOW THE UPPER 3 FEET OF SUBGRADE. OUTSIDE PAVEMENT AREAS COMPACT EMBANKMENTS TO 95% STANDARD PROCTOR DENSITY. 17. WORKING HOURS ARE 7:00 AM - 7:00 PM, MONDAY - FRIDAY. A CITY APPROVAL IS REQUIRED FOR SATURDAY WORK. 18.THE CONTRACTOR MUST HAVE A CITY LICENSE. 19.A CITY RIGHT-OF-WAY PERMIT IS REQUIRED PRIOR TO WORKING WITHIN CITY ROW. 20.STAGING AREAS TO INCLUDE TOPSOIL STOCKPILES & EQUIPMENT PARKING AREAS 21.ALL AREAS WITHIN THE WETLAND BUFFER AREA (OLA) THAT ARE DISTURBED MUST BE RESTORED WITH NATIVE VEGETATION. 22.JAPANESE KNOTWEED SHALL BE ERADICATED. THE AREA SHALL BE EXCAVATED AND THE MATERIAL HAULED OFFSITE TO BE DISPOSED OF PROPERTY. 23.TP7. THIS AREA CONTAINS HAZARDOUS MATERIAL WITH SLIGHTLY HIGHER THAN ALLOWED PAH'S. SEE PHASE II ENVIRONMENTAL REPORT FROM AET, 11/29/22. ALL SOIL DISTURBED WITHIN 20' OF TP7 SHALL BE REMOVED AND DISPOSED OF PER JURISDICTIONAL AUTHORITIES. GRADING & DRAINAGE NOTES GRADING, DRAINAGE & EROSION CONTROL SPECIFICATIONS WETLAND BUFFER SIGN VERIFY LOW FLOOR ELEVATION*WITH NEW SANITARY SEWER SERVICE ELEVATION POND CROSS SECTION A-A SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION WILL BE DECOMPACTED TO ACHIEVE: i. A SOIL COMPACTION TESTING PRESSURE OF LESS THAN 1,400 KILOPASCALS OR 200 POUNDS PER SQUARE INCH IN THE UPPER 12 INCHES OF SOIL OR ii. A BULK DENSITY OF LESS THAN 1.4 GRAMS PER CUBIC CENTIMETER OR 87 POUNDS PER CUBIC FOOT IN THE UPPER 12 INCHES OF SOIL. UTILITIES, TREE ROOTS AND OTHER EXISTING VEGETATION SHALL BE PROTECTED UNTIL FINAL REVEGETATION OR OTHER STABILIZATION OF THE SITE. 24. CITY GRADING NOTE: THE PROJECT SHALL BE CONSTRUCTED SO AS TO MINIMIZE THE POTENTIAL TRASNFER OF AQUATIC INVASIVE SPECIES (E.G. ZEBRA MUSSELS, EURASIAN WATERFOIL, ETC.) TO THE MAXIMUM EXTENT POSSIBLE. PHASE 2 ENVIRONMENTAL REPORT TEST PIT LOCATIONS TP-1 GRADING LIMITS (SEE SHEET C3-2 FOR SILT FENCE) CB1 RIM= 905.57 INV=900.35 (12") NE INV=900.63 (12") W STMH 2 (48'') RIM= 905.58 INV= 900.00 (12") SW INV=900.00 (12") E FES 3 RIM= 896.05 INV= 896.00 (12") W 8 39 L F 1 2 " P V C @ 0. 9 0 % 124 LF 12" PVC @ 3.22%8 8 8 8 8 8 30 LF 12" PVC @ 1.33% FES 6 RIM= 896.78 INV=896.50 (12") E FES 7 RIM= ??? INV= 896.34 (12") W 839 LF 12" PVC @ 0.41% CB 4 RIM= 899.20 INV=896.70 (12") N FES 5 RIM= 896.00 INV= 896.00 (12") S 8 8 8 8 8 8 8 8 16 3 L F 1 2 " P V C @ 0 . 4 3 % SINGLE HERITAGE TREE LOCATED ON PARCEL IS AN INVASIVE SPECIES, IN POOR CONDITION, AND DIRECTLY UNDER EXISTING POWER LINES. X X X X X XX X X X X XX X XX X X X X X X XX X X X X P P P P P P P P P P P P P N SCALE IN FEET 0 20 40 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Pl o t t e d : 05 / 0 5 / 2 0 2 3 1 1 : 2 2 A M W: \ 2 0 2 1 \ 2 1 6 8 0 \ C A D D D A T A \ L A N D S C A P E \ _ d w g S h e e t F i l e s \ L 1 - 1 T R E E P R E S E R V A T I O N P L A N OUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION KIWATCHI ADDITION 6285 DUCK LAKE ROAD EDEN PRAIRIE, MN 6285 DUCK LAKE, LLC 17516 RUSTIC HILLS DRIVE EDEN PRAIRIE, MN 55346 08/22/22 CITY SUBMITTAL 09/15/22 SOIL BORINGS 01/17/23 WATERSHED COMMENTS 02/16/23 WATERSHED COMMENTS 03/17/23 WATERSHED COMMENTS 04/11/23 CITY SUBMITTAL 05/05/23 CITY COMMENTS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 21680 TWM GAJ GAJ 05/05/20 05/05/23 C0-1 COVER SHEET C3-1 C8-1 GRADING PLAN CIVIL DETAILS C1-1 EXISTING CONDITIONS C4-1 UTILITY PLAN L1-2 1 of 1 PRELIMINARY PLAT L2-1 L3-1 LANDSCAPE DETAILS LANDSCAPE PLANS TREE INVENTORY C3-2 SWPPP PLAN C3-3 SWPPP NOTES C1-2 DEMOLITION PLAN PREL I M I N A R Y L1-1 TREE PRESERVATION C4-2 STORM SEWER PROFILES TREE PRESERVATION CALCULATIONS TOTAL CALIPER INCHES: 971.0 CAL .IN. (HERITAGE TREE ON SITE: 45.0 CAL. IN.*) SIGNIFICANT INCHES IN POOR HEALTH: 202.0 CAL. IN. TOTAL SIGNIFICANT INCHES ON SITE: 769.0 CAL. IN. TOTAL POOR HEALTH SIGNIFICANT INCHES REMOVED: 141.5 CAL. IN. TOTAL HEALTHY SIGNIFICANT INCHES REMOVED ON SITE: 409.5 CAL. IN. CITY'S REPLACEMENT CONSTANT: 0.5 ((409.5.0 / 769.0) x 0.5) x 409.5 = 109.0 CAL. IN. TOTAL CALIPER INCHES NEEDED TO BE REPLACED ON SITE: 109.0 CAL. IN. NOTES: * TREE NO. #6046 IS THE ONLY HERITAGE TREE ON SITE. IT IS A BLACK LOCUST WHICH HAS BEEN DETERMINED A NOXIOUS WEED/INVASIVE SPECIES PER THE MINNESOTA DEPARTMENT OF AGRICULTURE (MDA), IT IS IN POOR CONDITION, LOCATED UNDER EXISTING POWER LINES, AND IS NOT INCLUDED WITHIN ANY REPLACEMENT CALCULATIONS. REFER TO SHEET L1-2 FOR TREE INVENTORY LIST AND TREE PRESERVATION DETAIL. REFER TO SHEET L2-1 FOR LANDSCAPE PLAN, LANDSCAPE DATA, AND GENERAL NOTES. REFER TO SHEET L3-1 FOR LANDSCAPE NOTES, IRRIGATION NOTES, AND LANDSCAPE DETAILS. TOLL FREE: 1-800-252-1166TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. TREE PRESERVATION PLAN L1-1 PROPERTY BOUNDARY PROPERTY BOUNDARY PR O P E R T Y B O U N D A R Y PR O P E R T Y B O U N D A R Y LEGEND EXISTING SIGNIFICANT TREE TO REMAIN EXISTING SIGNIFICANT TREE TO BE PROTECTED - SEE DETAIL 1/L1-2 EXISTING SIGNIFICANT TREE TO BE REMOVED GRADING LIMITS - PROTECT TREES TO BE SAVED WITH SILT FENCING AS SHOWN ON SHEET C3-2 X P GR A D I N G L I M I T S GRADING LIMITS GR A D I N G L I M I T S GRAD I N G L I M I T S 906 904 906 904 904 8 9 8 89 8 90 8 90 6 906 904 895.75444 90 6 9 0 0 90 0 906 9 0 2 902 89 6 896 902 90 8 89 7 896 908 9 0 8 4 4 4 897 897 89 5 . 7 5 90 0 90 0 90 0 90 0 90 0 90 2 9 0 2 902 90 2 89 8 898 90 0 898 89 6 89 7 89 8 89 8 89 5 . 7 5 CB1 RIM= 905.57 INV=900.35 (12") NE INV=900.63 (12") W STMH 2 (48'') RIM= 905.58 INV= 900.00 (12") SW INV=900.00 (12") E FES 3 RIM= 896.05 INV= 896.00 (12") W 8 39 L F 1 2 " P V C @ 0. 9 0 % 124 LF 12" PVC @ 3.22%8 8 8 8 8 8 30 LF 12" PVC @ 1.33% FES 6 RIM= 896.78 INV=896.50 (12") E FES 7 RIM= ??? INV= 896.34 (12") W 839 LF 12" PVC @ 0.41% CB 4 RIM= 899.20 INV=896.70 (12") N FES 5 RIM= 896.00 INV= 896.00 (12") S 8 8 8 8 8 8 8 8 16 3 L F 1 2 " P V C @ 0 . 4 3 % 1 BS 1 NOP 3 PE 4 BS 3 ERC 2 SGM 3 ERC 3 PE 2 SGM 4 NOP 2 SWO 1 SGM 3 RB 1 SGM 1 SWO 3 RB DECIDUOUS TREES CODE QTY COMMON NAME BOTANICAL NAME CONT SIZE PE 6 PRINCETON ELM Ulmus americana `Princeton`B & B 2.5"Cal RB 6 RIVER BIRCH CLUMP Betula nigra B & B 12` HGT SGM 6 SIENNA GLEN MAPLE Acer freemanii `Sienna Glen`B & B 2.5"Cal SWO 3 SWAMP WHITE OAK Quercus bicolor B & B 2.5"Cal EVERGREEN TREES CODE QTY COMMON NAME BOTANICAL NAME CONT SIZE BS 5 BLACK HILLS SPRUCE FULL FORM Picea glauca `Densata`B & B 6` HGT ERC 6 EASTERN RED CEDAR FULL FORM Juniperus virginiana B & B 6` HGT NOP 5 NORWAY PINE FULL FORM Pinus resinosa B & B 6` HGT GROUND COVERS CODE COMMON NAME BOTANICAL NAME SEED 1 TURF SEED SOD/SEED CODE COMMON NAME BOTANICAL NAME SEED 2 NATIVE SEED MN/DOT SEED MIX 33-261 - SEED PER MN/DOT SPECIFICATIONS PLANT SCHEDULE N SCALE IN FEET 0 20 40 CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Pl o t t e d : 05 / 0 5 / 2 0 2 3 1 1 : 2 4 A M W: \ 2 0 2 1 \ 2 1 6 8 0 \ C A D D D A T A \ L A N D S C A P E \ _ d w g S h e e t F i l e s \ L 2 - 1 L A N D S C A P E P L A N OUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION KIWATCHI ADDITION 6285 DUCK LAKE ROAD EDEN PRAIRIE, MN 6285 DUCK LAKE, LLC 17516 RUSTIC HILLS DRIVE EDEN PRAIRIE, MN 55346 08/22/22 CITY SUBMITTAL 09/15/22 SOIL BORINGS 01/17/23 WATERSHED COMMENTS 02/16/23 WATERSHED COMMENTS 03/17/23 WATERSHED COMMENTS 04/11/23 CITY SUBMITTAL 05/05/23 CITY COMMENTS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 21680 TWM GAJ GAJ 05/05/20 05/05/23 C0-1 COVER SHEET C3-1 C8-1 GRADING PLAN CIVIL DETAILS C1-1 EXISTING CONDITIONS C4-1 UTILITY PLAN L1-2 1 of 1 PRELIMINARY PLAT L2-1 L3-1 LANDSCAPE DETAILS LANDSCAPE PLANS TREE INVENTORY C3-2 SWPPP PLAN C3-3 SWPPP NOTES C1-2 DEMOLITION PLAN PREL I M I N A R Y L1-1 TREE PRESERVATION C4-2 STORM SEWER PROFILES GENERAL NOTES: CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. HE SHALL INSPECT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK. VERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN AND / OR INTENT OF THE PROJECT'S LAYOUT. ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS GOVERNING THE WORK OR MATERIALS SUPPLIED. CONTRACTOR SHALL PROTECT ALL EXISTING ROADS, CURBS / GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING PLANTING OPERATIONS. ANY DAMAGE TO SAME SHALL BE REPAIRED AT NO COST TO THE OWNER. CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL UNDERGROUND AND ABOVE GRADE UTILITIES. CONTRACTOR TO PROVIDE THE NECESSARY PROTECTION FOR THE UTILITIES BEFORE CONSTRUCTION / MATERIAL INSTALLATION BEGINS. CONTRACTOR TO NOTIFY GENERAL CONTRACTOR OF ANY CONCERNS PRIOR TO INSTALLATION OF PLANTINGS. EXISTING CONTOURS, TRAILS, VEGETATION, CURB / GUTTER AND OTHER EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO LANDSCAPE ARCHITECT BY OTHERS. CONTRACTOR SHALL VERIFY ANY AND ALL DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY LANDSCAPE ARCHITECT OF SAME. TOLL FREE: 1-800-252-1166TWIN CITY AREA: 651-454-0002 Gopher State One Call CALL BEFORE YOU DIG! WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. LANDSCAPE CALCULATIONS: NO SPECIFIC LANDSCAPE REQUIREMENTS FOR R1 - 13.5 SINGLE FAMILY. EXCEPT AS MENTIONED BELOW AND THE REQUIREMENT TO REPLACE TREES BASED ON EXISTING TREE REMOVALS DUE TO SITE GRADING AND CONSTRUCTION DISTURBANCE AREAS. - ALL EXPOSED GROUND AREA SURROUNDING THE PRINCIPAL BUILDING AND ACCESSORY BUILDING WHICH ARE NOT DEVOTED TO DRIVEWAYS, SIDEWALKS, OR PATIOS, SHALL BE LANDSCAPED WITH GRASS, SHRUBS, TREES, OR OTHER ORNAMENTAL LANDSCAPE MATERIAL. TOTAL CALIPER INCHES REQUIRED: 109.0 CAL. IN. TOTAL CALIPER INCHES PROPOSED: 92.5 CAL. IN. DECIDUOUS TREES - 2.5" CAL 15 (37.5 CAL. IN.) DECIDUOUS TREES - CLUMP FORM (2.5" CAL) 6 (15.0 CAL. IN.) CONIFEROUS TREES - 6 FOOT HIGH (2.5" CAL) 16 (40.0 CAL. IN.) TOTAL CALIPER INCHES (NOT ON SITE)TO BE MITIGATED 16.5 CAL. IN. REFER TO SHEET L1-1 FOR TREE REPLACEMENT CALCULATIONS AND TREE PRESERVATION PLAN. REFER TO SHEET L1-2 FOR TREE INVENTORY LIST AND TREE PRESERVATION DETAIL. REFER TO SHEET L3-1 FOR LANDSCAPE DETAILS, LANDSCAPE NOTES, AND IRRIGATION NOTES. LANDSCAPE PLAN L2-1 PROPERTY BOUNDARY PROPERTY BOUNDARY PR O P E R T Y B O U N D A R Y PR O P E R T Y B O U N D A R Y BU F F E R Z O N E CITY NOTES: THE PROJECT SHALL BE CONSTRUCTED SO AS TO MINIMIZE THE POTENTIAL TRASNFER OF AQUATIC INVASIVE SPECIES (E.G. ZEBRA MUSSELS, EURASIAN WATERFOIL, ETC.) TO THE MAXIMUM EXTENT POSSIBLE. ALL DISTURBED AREAS WITHIN THE WETLAND BUFFER SHALL BE ESTABLISHED WITH NATIVE SEED MIX AS SHOWN IN THE PLANT SCHEDULE TREES TO BE PLANTED AFTER HOUSE CONSTRUCTION IS COMPLETED TREES TO BE PLANTED AFTER HOUSE CONSTRUCTION IS COMPLETED TREES TO BE PLANTED AFTER HOUSE CONSTRUCTION IS COMPLETED WE T L A N D 0 5 - 2 1 - B 20 ' B M P A C C E S S L A N E CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com Pl o t t e d : 05 / 0 4 / 2 0 2 3 2 : 2 1 P M W: \ 2 0 2 1 \ 2 1 6 8 0 \ C A D D D A T A \ S U R V E Y \ _ d w g S h e e t F i l e s \ 2 1 6 8 0 - P r e P l a t OUCKSL QUALITY CONTROL PROFESSIONAL SIGNATURE SUBMITTAL/REVISIONS CADD QUALIFICATION KIWATCHI ADDITION 6285 DUCK LAKE ROAD EDEN PRAIRIE, MN CRAIG SCHMIDT 17516 RUSTIC HILLS DRIVE EDEN PRAIRIE, MN 55346 PRELIMINARY PLAT 1 OF 1 That part of the Northeast Quarter of the Northwest Quarter of Section 5, Township 116, Range 22, described as beginning at a point on the West line of said Northeast Quarter of the Northwest Quarter of 463.3 feet South of the Northwest corner thereof; thence South along said West line to a point 789.2 feet North of the Southwest corner of said Northeast Quarter of the Northwest Quarter; thence East parallel with the South line of said Northeast Quarter of the Northwest Quarter, a distance of 280.55 feet; thence North 321.49 feet along a line which extended would intersect the North line of said Northeast Quarter of the Northwest Quarter at a point 282.46 feet East of the Northwest corner of said Northeast Quarter of the Northwest Quarter; thence West to the point of beginning. Hennepin County, Minnesota Torrens Property LEGAL DESCRIPTION GENERAL NOTES SURVEYOR: Loucks 7200 Hemlock Lane, Suite 300 Maple Grove, MN 55330 763-424-5505 1.Proposed Preliminary Plat of KIWATCHI ADDITION. 2.Prepared August 22, 2022. 3.The address, if disclosed in documents provided to or obtained by the surveyor, or observed while conducting the fieldwork is 6285 Duck Lake Road, Eden Prairie, MN. 4.The bearings for this survey are based on the Hennepin County Coordinate System NAD 83 (1986 Adjust). 5.Benchmark: MnDOT "TOWN" (Concrete Monument Marker W/Bar Magnet) In Eden Prairie; 2.15 miles north along TH 101 from junction of TH 101 and TH 5; in boulevard between TH 101, Townline Road & Sunny Road; 27.0 feet northwest of the back of curb of TH 101; 40.0 feet northeast of the back of curb of Townline Road; 17.6 feet south of a witness post. Elevation = 945.90 (NAVD88) Site Benchmark: Top nut of hydrant located on Duck Lake Road approximately 100 feet north of Claycross Way, shown hereon. Elevation = 909.39 (NAVD88) 6.This property is contained in Zone X (areas determined to be outside the 0.2% annual chance floodplain) per Flood Insurance Rate Map No. 27053C0338F, Community Panel No. 270159 0338 F, effective date of November 4, 2016. 7.The field work was completed on December 23, 2021. OWNER/DEVELOPER: Craig Schmidt 17516 Rustic Hills Drive Eden Prairie, MN 55346 612-720-8272 Current Zoning: Rural Proposed Zoning: R1-9.5 Residential District Any zoning classification, setback requirements, height and floor space area restrictions, and parking requirements, shown hereon, was researched to the best of our ability and is open to interpretation. Per the City of Eden Prairie Zoning Map and City Code, on June 1, 2022, information for the subject property is as follows: Proposed Setbacks: Front 30 feet Side 5/15 feet Rear 20 feet Height 40 feet Min. Lot Size 9,500 sq. ft. Min. Lot Width 70 feet Min. Lot Width Corner 100 feet Min. Lot Depth 100 feet ZONING INFORMATION Areas: Right of Way Dedication Area = 11,133 +/- square feet or 0.26 +/- acres Net Property Area = 80,710 +/- square feet or 1.85 +/- acres Total Property Area = 91,843 +/- square feet or 2.11 +/- acres Current Wetland Area = 670 +/- square feet or 0.02 -+ acres Wetland Impact = 0 SITE DATA BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED AND ADJOINING LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, AND ADJOINING RIGHT-OF-WAY LINES, AS SHOWN ON THE PLAT. DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: (NOT TO SCALE) BEARINGS ARE BASED ON THE WEST LINE OF THE NE 1/4, NW 1/4, SEC. 5, T. 116, R. 22 HAVING A BEARING OF N0°42'37"W. DENOTES FOUND 1/2 INCH IRON MONUMENT DENOTES FOUND HENNEPIN COUNTY CAST IRON MONUMENT DENOTES 1/2 INCH X 14 INCH IRON MONUMENT SET, MARKED "LS 48988" N DENOTES DATA PER RECORD DOCUMENT LOT CORNERS THAT FALL IN THE MIDDLE OF TRAVELED RIGHT-OF-WAYS WILL NOT BE SET; UNSAFE DUE TO TRAFFIC SCALE IN FEET 0 30 60 [DIST] 08/22/22 CITY SUBMITTAL 01/17/23 WATERSHED COMMENTS 02/16/23 WATERSHED COMMENTS 03/17/23 WATERSHED COMMENTS 04/11/23 CITY SUBMITTAL 05/05/23 CITY SUBMITTAL License No. Date I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the State of Minnesota. VICINITY MAP Field Crew Max L. Stanislowski - PLS 48988 Project Lead Drawn By Checked By Loucks Project No.21680 MLS SFM MLS SKS 08/22/22 SITE 20 20 20 20 6216 Baker Road, Eden Prairie, Minnesota 6216 Baker Road, Eden Prairie, Minnesota HWY 62 BA K E R R O A D 6216 Baker Road, Eden Prairie, Minnesota The property is currently guided Office in Aspire 2040. The proposal requires an amendment of the Comprehensive Plan. We are requesting to re-guide the property to Medium High Density Residential, which allows a density of 14 to 40 units per acre. When both phases are completed, the density would be 27.7 units per acre. The property is currently zoned Office. We are requesting a rezone to RM-2.5. Provided the re-guiding is approved by the Metropolitan Council, the zoning will be consistent with the Medium High Density Residential guiding of the property. Assisted Living facilities are permitted in the RM-2.5 zoning district. 6216 Baker Road, Eden Prairie, Minnesota 6216 Baker Road, Eden Prairie, Minnesota 6216 Baker Road, Eden Prairie, Minnesota The existing building material is brick and glass with a minimal amount of metal. The building complies with the building material requirements. The Phase II building addition blends with the existing building. The architectural plans incorporate similar building material as the existing building, and façade articulation is utilized to visually reduce the perceived height of the addition. Similar window repetition as the existing building, a curved form at the top of the building bays that mimic the existing building barrel roof form are incorporated as well as similar site features around the entire site to create a unified project. 6216 Baker Road, Eden Prairie, Minnesota 6216 Baker Road, Eden Prairie, Minnesota 6216 Baker Road, Eden Prairie, Minnesota 6216 Baker Road, Eden Prairie, Minnesota The Phase I improvements will require the loss of one canopy tree near the main entrance to the building. The canopy tree will be replaced with 3 Black Hills Spruce trees on the east side of the new sidewalk to the main entrance to the building. These 3 trees will be added during Phase I. The Phase II building addition requires 165 caliper inches of landscaping. The plan includes 165 caliper inches of landscaping. In addition to trees, the landscaping includes many shrubs, ornamentals grasses and flowering perennials to create a complete landscape treatment. The Phase II removes more trees than Phase I because the area to the west of the existing building is heavily wooded. Phase II requires 48 caliper inches of tree replacement. The plan includes 73 caliper inches of tree replacement and complies with the requirements. Grade changes between the industrial property to the west and this parcel, together with the wooded nature of the slopes, the industrial uses are not likely to see much of the proposed development. However, we are proposing additional landscape screening along the south property line where there are gaps in the existing vegetation and grading. The plan includes a mix of evergreen trees, deciduous trees and shrubs. Most of the existing vegetation along the south and west property lines will be retained. 6216 Baker Road, Eden Prairie, Minnesota Proposed expansion in the Bloomington and Eden Prairie Communities Bush Lake Animal Hospital is a two-veterinarian practice currently located in the Southwest Metro area of Bloomington, MN. We see a variety of species, including dogs, cats, reptiles, and pocket pets. We're proud partners of many community businesses and remain committed to providing the best possible care for our patients and the pets of Bloomington and Eden Prairie. It's of the utmost importance that we increase accessibility to pet care within our area, and we’re excited about the opportunity to expand. The Bush Lake Team 10160 Hennepin Town Road • Eden Prairie, MN 55347 Our community is the center of what we do and why we do it. Currently, we work with several rescues, businesses, and schools in our region. Some of our partnerships include: • Veterinary care provider to pets at Petco and PetSmart • The University of Minnesota Vet School– Instructor for the exotics rotation for fourth-year vets • Reptiles Instruction– Veterinary Technician school • Rabbit Rescue of Minnesota • Snake Discovery • Underdog Rescue • K9 Units for veterinary care Our two veterinarians are Dr. Gates and Dr. Travis. In addition, we have a warm, friendly, and compassionate team to assist in delivering care to our patients. Dr. Gates Dr. Travis 10160 Hennepin Town Road • Eden Prairie, MN 55347 East / West Elevations 10160 Hennepin Town Road • Eden Prairie, MN 55347 East Elevation West Elevation Building Features • This design has been reviewed by the City of Eden Prairie and meets all known building requirements of the City • 4,120 SF state- of-the-art veterinary clinic • Ample parking spaces • Building designed to match look and feel of Eden Prairie community North / South Elevations 10160 Hennepin Town Road • Eden Prairie, MN 55347 South Elevation North Elevation Building Features • Facility will be daytime veterinary clinic only • Building is designed to work with neighboring day care center and shares parking access • The clinic is designed to be as minimally intrusive to the neighborhood as possible Site Layout Plan 10160 Hennepin Town Road • Eden Prairie, MN 55347 • Sight lines from Hennepin Town Road make access in and out safe • Trip generation report shows this development will not add meaningful traffic to the area Planting Plan 10160 Hennepin Town Road • Eden Prairie, MN 55347 • Trees and shrubs to be planted according to plan • Improved landscaping provides park-like setting Questions? 10160 Hennepin Town Road • Eden Prairie, MN 55347 Eden Prairie Planning Commission –KiwatchiMay 22, 2023 Agenda SELECTIONS WALL 2 Location Map 3 Aerial Photo 1 Introduction 4 Preliminary Plat5 Site Data 6 Schedule 1. Introduction to Kiwatchi Land Developer SELECTIONS WALL •First time land developers (Craig & Jessica Schmidt) using expertise of land planner (Todd McLouth, Loucks) that specializes in the following services: Planning Civil engineering Land surveying Landscape architecture Environmental •6285 Duck Lake, LLC (100% owned by Craig & Jessica Schmidt – current Eden Prairie Residents) •Zoned Rural Land with 1 House is being converted into 4 lots (1 of which will be retained by Craig & Jessica) •Land was purchased from Chuck Gould via a Contract for Deed executed in January 2021. 2. Location Map SELECTIONS WALL 3. Aerial Photo SELECTIONS WALL 4. Preliminary Plat SELECTIONS WALL -Outlots B and C being sold to Neighbors -Outlot A required by both City and Watershed District due to neighboring Wetland. Deeded to City. -Lot 1 (being sold) -Lot 2 (being sold) -Lot 3 (home being demolished and lot being sold) -Lot 4 (retained by Craig & Jessica) 5. Site Data SELECTIONS WALL 6. Schedule SELECTIONS WALL May 2023 Zoning change/preliminary plat approved June 2023 Final plat approved / Demolish Existing Home and begin Grading Summer 2023 Site development work is completed Summer/Fall 2023 Sell Lots / Build Home on Lot 4 End of 2024 Build on remaining Lots SELECTIONS WALLQuestions?