Loading...
HomeMy WebLinkAboutPlanning Commission - 04/08/2024AGENDA EDEN PRAIRIE PLANNING COMMISSION Monday, April 8, 2024 PLANNING COMMISSION MEMBERS: John Kirk, Andrew Pieper, Ed Farr, , Robert Taylor, Daniel Grote, Frank Sherwood, Charles Weber, Phou Sivilay, Trisha Duncan STAFF MEMBERS: Jeremy Barnhart, City Planner; Carter Schulze, City Engineer; Matt Bourne, Manager of Parks and Natural Resources I. CALL THE MEETING TO ORDER II. PLEDGE OF ALLEGIANCE III. APPROVAL OF AGENDA IV. MINUTES A. Approval of the Planning Commission Meeting minutes dated March 25, 2024. V. PUBLIC HEARINGS A. Enclave at Manor Rd (2023-14) Request for: • PUD Concept Review on 6.43 acres • PUD District Review with waivers on 6.43 acres • Zoning Change from Rural to R1-9.5 on 6.43 acres • Preliminary Plat to divide one parcel into 17 lots and 1 outlot on 6.43 acres B. Lotus Villas on Anderson Lakes (2024-02) Request for: • Guide Plan Change from Office to Low Density Residential on 5.0 acres • PUD Concept Plan Review on 5.0 acres • PUD District Review with waivers on 5.0 acres • Zoning District Change from Office to R1-9.5 on 5.0 acres • Preliminary Plat review on 5.0 acres C. Asia Mall Parking Lot Expansion (2024-01) Request for: • Planned Unit Development Concept Review on 4.69 acres • Planned Unit District Amendment with waivers on 4.69 acres • Site Plan Review on 4.69 acres. VI. PLANNERS’ REPORT VII. MEMBERS’ REPORTS VIII. ADJOURNMENT UNAPPROVED MINUTES EDEN PRAIRIE PLANNING COMMISSION MONDAY, MARCH 25, 2024 7:00 PM—CITY CENTER Council Chambers 8080 Mitchell Road COMMISSION MEMBERS: John Kirk, Frank Sherwood, Andrew Pieper, Ed Farr, Carole Mette, Robert Taylor, Dan Grote, Charles Weber; Phou Sivilay CITY STAFF: Jeremy Barnhart, City Planner; Carter Schulze, City Engineer; Matt Bourne, Manager of Parks and Natural Resources; Kristin Harley, Recording Secretary I. CALL THE MEETING TO ORDER Chair Pieper called the meeting to order at 7:00 p.m. II. PLEDGE OF ALLEGIANCE – ROLL CALL Commission member Taylor was absent. III. APPROVAL OF AGENDA MOTION: Grote moved, seconded by Weber to approve the agenda. MOTION CARRIED 8-0. IV. MINUTES MOTION: Kirk moved, seconded by Sivilay to approve the minutes of February 12, 2023. MOTION CARRIED 8-0 V. PUBLIC HEARINGS A. EDEN PRAIRIE PUBLIC SCHOOLS - UNFI Request for • Approval for Guide Plan Changes to Public/Semi-Public and Parks and Open Space on 60.91 acres • Approval for Zoning Change to Public and Parks and Open Space on 60.91 acres Sherwood recused himself. PLANNING COMMISSION MINUTES March 25, 2024 Page 2 Kyle Fisher, Safety Director at Eden Prairie Schools, displayed a PowerPoint and detailed the application. The application requested a change to the Comprehensive Plan and Zoning District of approximately 60.91 acres to facilitate the use of the existing office building for educations programming by the Eden Prairie School District. He played a video of the proposed TASSEL program which served students 18-22 years old. At the end of the summer the program’s lease would not be renewed in its existing building and the applicant proposed to move this program to the office building in question. The Nine Mile Creek Watershed District was involved and had a positive response to the proposal. Dirk Tedmon, executive director of marketing and communication for Eden Prairie School District, explained the “Designing Pathways” process and explained the need for a large property to respond to perhaps 200 students’ needs, which included the issues of increasing enrollment and the need to outsource some teaching opportunities. He explained the community outreach done toward this end. Kyle Fisher explained the development involved 165,000 square feet on Bryant Lake and stated this was a great opportunity to work with the Watershed District to provide nontraditional learning. The school buildings were almost at capacity This would have a centralized warehouse area in the lowest level. Farr asked for and received confirmation the purchase agreement was contingent on District approval. Other uses included environmental learning outdoor spaces, a play area, et cetera, and program were not set in stone but could evolve. There would also be programs for the community and special events with enough parking for all. Fisher stated this was like any other program at Eden Prairie Schools. Farr noted enrollment was not dropping in Eden Prairie. He asked if the westernmost driveway off Valley View required a used access agreement. Fisher replied his understanding there was conversation on the use of this as a second drive. Unfortunately, the design engineer was not able to attend tonight’s meeting. Farr anticipated questions from the public regarding taxes. Students did not pay tuition so he asked how it was funded. Tedmon replied there was a lease levy purchase for less than a dollar a month, with no major tax impact. A bond referendum was possible in the future. Shawn Hoffman-Graham, community education, detailed the funding. She was the first connection to events, many of which were fee-based, and the schools would be able to find expanded learning for students, filling the voids and gaps for Eden Prairie citizens. Grote asked if there were any plans to use Bryant Lake. Fisher stated there was no official plans and did not know in what capacity it would be used. Barnhart presented the staff report. This was a map change in the Comprehensive Plan and land use guidance. This was a unique request; typically, some PLANNING COMMISSION MINUTES March 25, 2024 Page 3 construction is anticipated. Any changes to the exterior or to the landscape would be subject to city review. There were certain stipulations and conditions on the use of the lake (docks, moorings, et cetera). There were no lakeside or lake improvements proposed at this time, and any change to that would also have to go through a review process. The proposed use was also in keeping with environmental conditions with no negative impacts. Staff supported the change to the Comprehensive Plan. Sivilay asked for Phase I environmental assessment results. Fisher replied one was completed and the only potential concern was an underground 10,000 gallon storage tank. Subsequent tests were not yet back, but at this time no leakage was indicated. Farr asked if the traffic would increase as the program evolved and grew. Schultze replied the study’s goal was to document the existing condition, and compare it to the demand, and did not see an increase of traffic even if the program were to triple. Any major increase would also go through the public review process. MOTION: Grote moved, seconded by Kirk to close the public hearing. Motion carried 8-0. Mette spoke in support of the project, not finding traffic a concern. She noted this would take a tax-generating property off the tax rolls, and she suggested the school district to explore selling off the excess land in order to help put money back on the payroll and raise funds for major renovations. Kirk seconded Mette’s support and stated he saw no real downsides. The public processes in the future would allow appropriate input. Sivilay stated his only concern was the recommended mediation in Phase II. MOTION: Kirk moved, seconded by Weber to recommend approval for Guide Plan Changes to Public/Semi-Public and Parks and Open Space on 60.91 acres and for Zoning Change to Public and Parks and Open Space on 60.91 acres as represented in the March 25, 2024 staff report. Motion carried 6-0 with Sherwood and Grote abstaining. B. CODE AMENDMENT – OFFICE USE IN INDUSTRIAL FLEX TECH Request for • Approval for Guide Plan Changes to Public/Semi-Public and Parks and Open Space on 60.91 acres • Approval for Zoning Change to Public and Parks and Open Space on 60.91 acres PLANNING COMMISSION MINUTES March 25, 2024 Page 4 Barnhart presented the staff report. This was to incorporate the goals of Aspire 2040 applied to the industrial area known as the Industrial Flex Tech area, specifically the I-2 and I-5 Zoning Districts. The change would remove the 50 percent cap for office uses in those districts. Over the years there have been a handful of waivers for extensions and this would remove an unnecessary regulation that did not gibe with the Plan’s goals. It would add more employment and aid to the business community without negative impacts. The commission might see more parking waivers because office parking was greater than warehousing or manufacturing. . This did not change the I-Gen use distribution where there was still the 50 percent cap; heavier industrial uses being more appropriate in these areas. Staff recommended the change as proposed in the staff report. MOTION: Mette moved, seconded by Kirk to close the public hearing. Motion carried 8-0. Farr stated he could vouch for the demand for this change. Kirk also voiced his support. Mette agreed; to her it reiterated why the Flex Industrial Zone was created in the first place. MOTION: Farr moved, seconded by Sherwood to recommend approval for the text amendment to Chapter 11.30 as drafted in the March 25, 2024 staff report. Motion carried 8-0. PLANNERS’ REPORT MEMBERS’ REPORTS Pieper announced this was Mette’s last meeting. Mette thanked the commission members and bid them farewell. VI. ADJOURNMENT MOTION: Mette moved, seconded by Kirk to adjourn. Motion carried 8-0. The meeting was adjourned at 7:42 p.m. TO: Planning Commission FROM: Ben Schneider, Planner I DATE: April 8, 2024 SUBJECT: Enclave at Manor Road LOCATION: 6591 168th Avenue West REQUEST: • PUD Concept Plan Review on 6.43 acres • PUD District Review with waivers on 6.43 acres • Zoning Change from Rural to R1-9.5 on 6.43 acres • Preliminary Plat to divide one parcel into 17 lots and 1 outlot on 6.43 acres BACKGROUND The applicant is requesting approval to subdivide the property into 17 single family lots at 6591 168th Avenue West. The property is located about a quarter mile north of Duck Lake, on the east side of 168th Avenue West. The project site includes one parcel with a house, barn structure, and silo (all vacant). The property is surrounded by single-family homes. The topography is mostly flat, although the grades begin to slope downward on the northern edge of the site. There are several trees dispersed throughout the area. Staff Report – Enclave at Manor Road April 8, 2024 Page 2 2 COMPREHENSIVE PLAN AND ZONING The subject property is identified as an infill site in the Comprehensive Plan and is guided for low density residential, which allows up to five (5) units per acre. The proposed development is 2.64 units per acre. The property is currently zoned Rural. The applicant is requesting to rezone the property to R1- 9.5, which is consistent with the Comprehensive Plan and neighboring homes along South Manor Road to the east. There are also lots zoned R1-13.5 to the north and south and homes zoned R1-22 to the west. PRELIMINARY PLAT The preliminary plat divides the existing parcel into 17 lots and one (1) outlot for a stormwater basin. The plat is bisected by right of way for the proposed connection of South Manor Road to 168th Avenue West. The northern half includes eight (8) lots that are 65 feet wide and Outlot A. These eight (8) lots would require a waiver from the standard lot width of 70 feet. The southern half features nine (9) lots ranging from 72 feet to 85 feet in width, meeting the lot width standard. Staff Report – Enclave at Manor Road April 8, 2024 Page 3 3 The plat includes a 20-foot drainage and utility easement that runs through lots 1-7 to the north and an extra five (5) feet of side yard easements for six (6) of the southern lots. The goal of this configuration of easements and associated stormwater piping is to maximize tree preservation and tree replacement opportunities. PLAN ITERATIONS The initial plans that were submitted to the City showed 20 lots instead of 17 lots, with 10 lots on each side of South Manor Road. Outlot A and the associated stormwater basin was proposed to abut the rear yards of six (6) lots, which would have required lot size waivers. Earlier plans also showed a stormwater sewer line that encompassed most of the southern and western edges of the site. This resulted in more tree removals and less opportunities for tree replacement. Finally, the stormwater BMP posed maintenance and aesthetic concerns by staff. The resulting proposal minimizes waivers and addresses landscaping and tree preservation goals of the city. PLANNED UNIT DEVELOPMENT WAIVERS The purpose of a Planned Unit Development (PUD) as stated in the City Code is to provide for a more creative and efficient approach to the use of land within the City; to allow variety in the types of environment available to people and distribution of overall density of population and intensity of land use where desirable and feasible; and provide for greater creativity and flexibility in environmental design. The applicant is requesting the following waivers from City Code: 1. Front Yard Setback along South Manor Road. The request is to have a front yard setback of 25 feet along South Manor Road. City Code requires 30 feet. This waiver, applied to all lots, is supported by staff because the reduced setback will help preserve trees in the rear yards, along the periphery of the site. This will also provide more space for future rear yard improvements, including decks, sheds, and pools. 2. Front Yard Setback along 168th Avenue West. The applicant is requesting a 20-foot front yard setback along 168th Avenue West. City Code requires a 30-foot setback on both sides of a corner lot that face a street. This will only impact Lot 1, Block 2 on the southwest corner of the plat. This setback is being requested in exchange for the wider easements that are needed on some of the lots on Block 2. As mentioned previously, this configuration of easements promotes the most tree preservation and tree replacement opportunities on the site. The planting plan also includes six (6) coniferous trees to screen this future home from 168th Avenue West. Staff supports this waiver request. 3. Minimum Lot Width. The applicant is requesting a minimum lot width of 65 feet for lots 1-8 on Block 1. City Code requires a minimum lot width of 70 feet in the R1-9.5 District. The following are rationale for supporting this waiver: a. The developer is protecting over 40 significant trees, including one of the two heritage trees, along the periphery of the site. This will help provide some immediate screening with mature trees. b. There are several lots in the adjacent neighborhood to the east with lot widths Staff Report – Enclave at Manor Road April 8, 2024 Page 4 4 under 70 feet. The closest nine (9) homes on the south side of the road range from about 65 feet to 69 feet width. Further down South Manor Road (closer to Duck Lake Trail) are lots that are closer to 55 feet wide. Overall, this waiver request does not alter neighborhood character. c. The lots requesting the width waiver exceed the minimum lot size and lot depth for the district. d. The waiver request is for the lots on the same side of the road as Outlot A. The initial application submittal showed three extra lots in the location of this outlot. The developer has worked with staff to reduce the number of lots and reconfigure the plat to better fit the overall neighborhood. TRAFFIC AND ACCESS Staff has requested that the developer include the road connection between South Manor Road and 168th Avenue South. Staff supports this connection for the following reasons: 1. Initial Plans. This connection was anticipated at the time the adjacent neighborhood to the east was approved in 1983. The staff report stated the following: “The access road off Duck Lake Trail, as it turns to the west through Phase II, should be extended to the west property. This will eventually provide a connection the adjoining neighborhood.” The “access road” refers to South Manor Road and “Phase II” refers to the current neighborhood adjacent to the east. 2. Comprehensive Plan. This road connection is included as one of the “Anticipated Roadway Connections” in Aspire 2040. 3. Traffic Study. A full traffic study memo was produced for this project. The analysis is based off the initial 20 lot proposal, three more than what is now proposed. The memo concludes that the traffic levels would be acceptable with this new development and the associated road connection at W 168th/ S Manor Rd, W 168th/ Duck Lake Trail, and S Manor Rd/ Duck Lake Trail. It is estimated that 20 new homes would generate an additional 15 trips during the AM peak hour and 19 trips in the PM peak hour. 4. Connectivity. As noted in City Code, cul de sacs should be avoided whenever reasonably possible. A connection here promotes community, safety, and provides for more efficient street maintenance, including snow removal. SIDEWALKS There are existing sidewalks along 168th Avenue West and on the north side of South Manor Road. The developer is proposing to continue the South Manor Road sidewalk and connect it to 168th Avenue West. TREE LOSS AND REPLACEMENT The site has 2,723 caliper inches of significant trees, including two heritage trees. A total of 2,068 caliper inches, or about 75 percent, are proposed to be removed. This includes one of the two heritage trees. The trees that are being preserved are mostly along the periphery of the site, which Staff Report – Enclave at Manor Road April 8, 2024 Page 5 5 will assist with screening the development from surrounding neighborhoods. Based on the removal plans, the developer owes 830 caliper inches of replacement trees. The planting plan shows 599 inches being added, meaning cash in lieu payment will be needed for the remaining 231 inches owed, meeting City Code requirements. Trees are planted along the edges of the site, around the stormwater basin, and in the front and rear yards of each lot. STORMWATER MANAGEMENT Based on the slope of the land, all stormwater is proposed to flow to a stormwater filtration basin in the northwest corner of the development. This basin provides rate control for stormwater discharges from the site and removes pollutants. The basin would be in an outlot and maintained by the City. The basin would discharge to an existing trunk storm sewer north of the site, a portion of which is proposed to be upsized. This portion is within a drainage and utility easement along the western edges of 6537 168th Ave West and 16460 North Manor Road. The developer has been in communication with these property owners, as the work would result in a temporary disturbance of their yards and driveway. The planting plan shows several new trees that would surround the basin area to provide screening as well as an access for City maintenance of the basin. HOUSING PRODUCT The submittal includes examples of homes that Brandl Anderson plans to build in this development. Their products feature a variety of rooflines and all include three-car garages. In contrast to other recent infill single-family projects in the City, the garages of these homes tend to be more flush with the rest of the front home façade. The applicant estimates that the starting price point for these homes would be around $700,000. There is no HOA planned for this development. NEIGHBORHOOD MEETING The developer held a neighborhood meeting during the evening of Wednesday, March 27. About 30 people were in attendance. Staff has also received some email comments, which have been included “The Edgestone” Staff Report – Enclave at Manor Road April 8, 2024 Page 6 6 in this packet. Here is a summary of the comments that were shared by the neighbors regarding the proposed development: • Road connection. Some residents expressed opposition to the road connection between the proposed development and South Manor Road to the east due to traffic concerns. Staff supports this road connection for the reasons cited above in the “Traffic and Access” section. • Stormwater Ponding. The residents have some aesthetic concerns with the proposed location of the stormwater basin and request that the ponding be adequately screened. Current plans do show new trees surrounding the basin. Although, some openings would be necessary to provide proper maintenance access. • Sidwalk Maintenance. The neighborhood shared that the portion of the existing sidewalk that abuts the subject property on 168th Avenue West has not been plowed, at least this past winter. In general, adjacent property owners are responsible for sidewalk snow removal. If the site were to be developed as proposed, the responsibility of snow removal of this sidewalk would be shared by the City (northern half that abuts Outlot A) and the future owner of Lot 1, Block 2 (southern half). • Construction Traffic. Residents had general concerns about construction traffic concerning this development and at High Trail Estates Park, which is west of the project site. The City is planning to replace the play equipment at the park, but this work is not anticipated to interfere with other construction traffic. SUSTAINABILITY STANDARD Since this is project is a Planned Unit Development, it triggers the City’s new sustainable building standard that has been in effect since January 1, 2024. For this project, all homes will be required to install at least one EV-Ready parking space (garage charger) and build a roof that meets Solar-Ready guidelines. Brandl Anderson also states in their narrative that each home will have energy star rating appliances, low VOC materials, and tankless water heaters. STAFF RECOMMENDATION Recommend approval of the following requests: • PUD Concept Plan Review on 6.43 acres • PUD District Review with waivers on 6.43 acres • Zoning Change from Rural to R1-9.5 on 6.43 acres • Preliminary Plat to divide one parcel into 17 lots and 1 outlot on 6.43 acres This is based on plans submitted on April 4, 2024, staff report dated April 8, 2024, and the following conditions: Staff Report – Enclave at Manor Road April 8, 2024 Page 7 7 1. Prior to release of the Final Plat, the applicant shall A. Sign special assessment agreement for City trunk sewer and water assessment fees and connection fees. B. Pay the proportioned cost of future roadway improvements along 168th Ave. C. Submit detailed storm water runoff, utility and erosion control plans for review by the City Engineer and Watershed District. D. Tender a warranty deed for Outlot A for review and written approval by the City Engineer. After approval of the warranty deed and filing of the final plat, file the warranty deed with Hennepin County. E. Submit a bond, letter of credit, or cash deposit (“security”) that guarantees completion of all public improvements equivalent to 125% of the cost of the improvements. 2. Prior to land alteration permit issuance, the applicant shall: A. Submit detailed storm water runoff, wetland, utility, street and erosion control plans for review and approval by the City Engineer. B. Pay the fee in lieu for tree replacement. C. Submit a landscaping letter of credit or escrow surety equivalent to 150% of the cost of the tree replacement. D. Obtain and provide documentation of Watershed District approval. E. Notify the City and Watershed District 48 hours in advance of grading. F. Install erosion control at the grading limits of the property for review and approval by the City. G. Submit a land alteration bond, letter of credit, or escrow surety equivalent to 125% of the cost of the land alteration. 3. Prior to building permit issuance for the lots, the applicant shall: A. Pay the appropriate cash park fee. B. Provide recorded copy of the warranty deed for Outlot A to the City following recording of the final plat. C. Submit construction plans and project specifications for public infrastructure for review and approval by the City Engineer. Enclave at Manor Road SUBMITTAL FOR: PUD, Rezoning and Preliminary Plat Eden Prairie, MN Revised April 3, 2024 Introduc)on Brandl Anderson Homes (“Brandl Anderson”) is pleased to be submi ng this applica on. Brandl Anderson’s mission is to build “Dream Homes for Real Budgets”. Brandl Anderson has been building award-winning homes since 1993. Locally owned, Brandl Anderson has an office in Burnsville and will build approximately 100 homes in the Twin Ci es area in 2024. Team Brandl Anderson will act as the developer (Enclave at Manor Road, LLC) of the property and builder of the homes. The primary contact for Brandl Anderson is: Ma3 Olson, Senior Vice President 221 River Ridge Circle South, Suite 100 Burnsville, MN 55337 The engineer, surveyor, and landscape architect are: John Bender, James R. Hill, Inc. 2999 West County Road 42, Suite 100 Burnsville, MN 55306 Paul Haugo, Haugo GeoTechnical Services, LLC 13570 Grove Drive, Suite 278 Maple Grove, MN 55311 Ben Hartberg, Calyx Design Group 475 Cleveland Avenue North, Suite 101A St. Paul, MN 55104 Property Informa)on Address 6591 West 168th Avenue Property Iden)fica)on Number 05-116-22-13-0003 Legal Descrip)on The South 420.0 feet of the West 1/2 of the Southwest Quarter of the Northeast Quarter of Sec on 5, Township 116, Range 22 except the West 30.0 feet thereof, Hennepin County, Minnesota Key Facts • Exis ng zoning is Rural • Future guidance is Low Density Residen al • Proposed zoning is R1-9.5 (PUD) • Gross area is 6.43 acres • Proposed number of homes is 17 single family homes • Gross density is 2.64 units/acre Project Overview Brandl Anderson is proposing a single-family home development consis ng of 17 homes and one outlot on the 6.43-acre site. The proposed development consists of seventeen 50’ x 55’ building pads and the project will not have a homeowner’s associa on. The project site is currently guided Low Density Residen al, which allows for a density of up to 5 units per acre and zoned Rural. The proposed overall site density is 2.64 units per acre which falls within the guided density. Along with this applica on we are reques ng a zoning change from Rural to R1-9.5. The following PUD variances are requested vs standard R1-9.5 zoning. ITEM R1-9.5 PUD Minimum Lot Size 9,500 Square Feet 9,500 Square Feet Minimum Lot Width 70 Feet 65 Feet Minimum Corner Lot Width 85 Feet 85 Feet Minimum Lot Depth 100 Feet 100 Feet Minimum One Side Setback 5 Feet 5 Feet Minimum Both Sides Setback 15 Feet 15 Feet Front Yard Setback 30 Feet 25 Feet Rear Yard Setback 20 Feet 20 Feet Maximum Building Height 40 Feet 40 Feet PUD Waivers Our proposal is a PUD with requested waivers from the straight zoning code language of R1 9.5. The reason behind proposing a PUD is that the site is an infill site surrounded by exis ng homes to the North, East and south and road to the west. The development is primarily covered with trees. It’s our goal to preserve as many as we can but also repopulate the site with younger more sturdy trees. The current inventory of trees has several trees infested with Emerald Bore Ash that will only spread to other trees. We intend to take these out and replace them with more sturdy trees. In addi on, there are several trees that are either ro ng out or past their life and will eventually become a hazard to development and the surrounding environment. We also intend to take these out and replace them with more high- quality trees that will have a longer life span. Given the above we are seeking a few lot waivers to accommodate our landscape plan and the long-term health of the community. They are listed below: 1. Front yard setback from along 168th, we are asking for a setback of 20 feet rather than 30 feet. This will allow us to replant and preserve as many trees as possible. 2. We are asking for a front yard setback of 25 feet rather than 30 to preserve as many trees as possible in the back of the lots, specifically on the southern border of the development. 3. We are seeking a lot width of 65 feet rather than 70 feet on the north side of S Manor Rd. This will allow us to create more affordable lots and homes with the addi on of one addi onal lot. Site Descrip)on The 6.43 acre site consists of a house with an a3ached garage, two barns, and a silo. The house is two stories with a basement and has an approximate footprint of 2,400-square-feet. The southwest barn is one level with an approximate footprint of 1,750-square feet. The northwest barn is two levels with an approximate footprint of 836-square feet. The barns and silo do not meet the criteria for local historical designa on however, pictures will be taken prior to demoli on. Endangered and Threatened Species No records of state listed endangered or threatened species are catalogued within a 1-mile radius of the project area. The project area falls within the High Poten al Zone for the Rusty Patched Bumble Bee. However, based on the site condi ons (former pastureland understory lacking in number of na ve pollen/nectar species and with fairly dense understory cover), the site does not provide suitable foraging, nes ng and/or overwintering habitat. Lastly, the are no cri cal habitats at this loca on. Please see full report for details. Sustainability Standard Every home we build is tested to Minnesota Green Path and Energy Star Standards. In 2018, our Green Path Efforts were recognized by House First by awarding us the Green Path Builder of the Year. This project triggers Eden Prairie’s Sustainable Building Standards. Our single-family homes in Enclave at Manor Road will include the following sustainable features. • Dedicated electrical circuit to the garage for electric vehicle charging. • Electrical conduit installed in the u lity room to the a c for future solar. • Energy star ra ng appliances. • Low VOC materials • Tankless water heaters Landscaping and Tree Preserva)on Enclave at Manor Road development has 2,723 caliper inches of significant trees with the removal of 2,068 caliper inches including 40 caliper inches of heritage trees, with 35 heritage inches to remain. The total replacement of significant trees and heritage trees equals 830 caliper inches. A tree preserva on plan/landscaping plan will be included in this applica on showing 599 caliper inches of new trees to be planted leaving a deficit of 231 caliper inches which the developer will pay a cash fee. Stormwater Stormwater management will consist of pretreatment via grassed swales, a sump manhole and a forebay. Primary treatment will be provided by a sand filtra on basin. Addi onally, the northeast wooded slope will be preserved. The stormwater best management prac ces will provide the rate control and water quality control required by the City of Eden Prairie and the Riley Purgatory Bluff Creek Watershed District. Streets/Traffic The development will connect South Manor Road on the east to 168th Avenue West on the west. The connec on will also include a sidewalk on the north side of South Manor Road. The December 2023 traffic study done by SSTS, LLC concluded that the proposed development with 20 single family homes has appropriate access, and the site traffic will not result in poor opera ons or excessive queuing in the nearby intersec ons. Architectural Plans A great home is not defined by square footage, but by whether it fulfills the expecta ons and needs for each unique family. Brandl/Anderson Homes, Inc. has been building homes in Minnesota for over 30 years and understands the defini on of a great home. We realize that the products and craNsmanship put into our homes are as important as our rela onship with our clients. Therefore, we never sacrifice quality for price, which ensures that every component used in the construc on of our client’s home has a proven reputa on for quality. We at Brandl/Anderson Homes, Inc. are proud to have built more than 2,500 homes throughout the surrounding Twin Ci es suburbs and Wisconsin; however, we are more pleased to admit that we have just as many sa sfied clients. At Brandl/Anderson Homes, Inc., our homes are built around the way families want to live – with open floor plans, adaptable spaces, and comfortable rooms. Our exclusive designs take everything into account – but that doesn’t mean we’re not flexible. Want to move a wall? We can do that. Need to remove a closet? Sure thing. We work with our customers to build dream homes for real budgets. Brandl Anderson Homes, Inc. builds more of the extras in every square foot of our custom dream homes, and the difference also comes through in our numerous home designs that feature larger closets, spacious living areas, and thoughSul layout configura ons. With new home floor plans including one- level living villa homes, townhouses, two-story homes and more. Brandl Anderson isn’t out to just build more homes in Minnesota, we build be3er homes for our community. Dream Homes for Real Budgets Brandl Anderson custom homes, where your dreams – and your budget – come to live. Homes starting in the low $700’s 1. The Arden a. 2,186 Square Feet b. 4 Bedrooms | 3 Bathrooms | 3 Stall Garage c. 2 Stories d. 48 Feet Wide x 43 Feet Deep 2. The Jayden a. 2,440 Square Feet b. 4 Bedrooms | 3 Bathrooms | 3 Stall Garage c. 2 Stories d. 48 Feet Wide x 44 Feet Deep 3. The Lauren a. 2,476 Square Feet b. 4 Bedrooms | 3 Bathrooms | 3 Stall Garage c. 2 Stories d. 48 Feet Wide x 39 Feet Deep 4. The Weston a. 2,590 Square Feet b. 4 Bedrooms | 3 Bathrooms | 3 Stall Garage c. 2 Stories d. 50 Feet Wide x 46 Feet Deep 5. The Heritage a. 2,773 Square Feet b. 5 Bedrooms | 4 Bathrooms | 3 Stall Garage c. 2 Stories d. 50 Feet Wide x 50 Feet Deep 6. The Edgestone a. 3,008 Square Feet b. 4 Bedrooms | 4 Bathrooms | 3 Stall Garage c. 2 Stories d. 50 Feet Wide x 44 Feet Deep 7. The Parker a. 3,169 Square Feet b. 4 Bedrooms | 3 Bathrooms | 3 Stall Garage c. 2 Stories d. 50 Feet Wide x 44 Feet Deep 8. The Cypress a. 1,527 Square Feet b. 2 Bedrooms | 2 Bathrooms | 3 Stall Garage c. 1 Story d. 38 Feet Wide x 54 Feet Deep 9. The Spruce a. 1,656 Square Feet b. 2 Bedrooms | 2 Bathrooms | 3 Stall Garage c. 1 Story d. 50 Feet Wide x 56 Feet Deep 10. The Cedar a. 1,877 Square Feet b. 2 Bedrooms plus Flex Room | 2 Bathrooms | 3 Stall Garage c. 1 Story d. 40 Feet Wide x 60 Feet Deep 1 | P a g e Enclave at Manor Rd, Eden Prairie, MN December 19th, 2023 To: Adam Gadbois, City of Eden Prairie From: Katie Schmidt, PE Re: Traffic Study – Enclave at Manor Rd, Eden Prairie, MN Per your request, SSTS, LLC has reviewed the traffic impacts associated with development of the Enclave at Manor Rd single family home residential site in Eden Prairie, MN. The proposed site is located north of Duck Lake Trail and on the east side of 168th Ave W at S Manor Rd (illustrated on Figure 1 at the end of this report). The development is planned to include 20 single family homes with access via S Manor Rd as shown on Figure 2, Concept Site Plan. This study reviews the No-Build and Build traffic conditions for the year after construction of the site, year 2026. This memorandum summarizes the findings. Study Area Intersections The following study area intersections were defined with input from the city: · Duck Lake Trail & 168th Av W (side-street stop-controlled) · Duck Lake Trail & S Manor Rd (side-street stop-controlled) · 168th Av W & S Manor Rd (side-street stop-controlled) Roadway Descriptions The existing conditions of the study area roadways are noted in Table 1. Additionally, Figure 3 shows the existing lane geometry and traffic control at the study areas intersections. Table 1. Roadway Description *AADT Sources: (PM Count) from assuming PM counts are ~10% of ADT Data Collection & Existing Traffic Volumes AM and PM peak hour turning movement counts were conducted at all study area intersections on Tuesday, November 14th, 2023. The AM peak traffic hour was found to generally occur from 7:45 - 8:45 AM and the PM peak traffic hour was found to occur from 4:00 - 5:00 PM (See Figure 4, Existing Traffic Volumes). No-Build Traffic Conditions The 2026 No-Build traffic volumes were analyzed to establish the baseline for comparison with the Build traffic volumes. The 2026 No-Build traffic volumes were estimated by applying a 0.5% annual growth rate to the 2023 existing traffic volumes to “grow” them up to year 2026. This 0.5% annual growth rate 2 | P a g e Enclave at Manor Rd, Eden Prairie, MN is conservative as review of historical ADTs on Duck Lake Trail and 168th Av S show a slight decline in traffic in the past 20 years (from MnDOT’s Traffic Mapping Application). Figure 5 shows the 2026 No- Build Traffic Volumes with this growth rate applied. Trip Generation and Distribution The trip generation for the proposed single family homes use has been estimated based on the methodology described by the Institute of Transportation Engineers (ITE) in Trip Generation, 11th Edition, and ITE’s Trip Generation Handbook, 3rd Edition. The ITE land use code coinciding with the development is Code 210 for Single Family Housing. Table 2 summarizes the trip generation for the proposed development. Table 2. Trip Generation Forecast As shown in Table 2, the site will generate 4 entering and 11 exiting trips during the morning traffic peak hour, and 12 entering and 7 exiting trips during the afternoon peak hour. The distribution of site traffic reflects the existing traffic patterns in the area and anticipated travel patterns for residents. Figure 6, Trip Assignment, depicts the distribution of the estimated site-generated traffic in the study area. The 2026 Build traffic conditions reflect the new traffic added to the 2026 No-Build traffic volumes. Figure 7 illustrates the 2026 Build Traffic Volumes. Traffic Operations The operating conditions of transportation facilities, such as roadways, traffic signals, roundabouts and stop-controlled intersections, are evaluated based on the relationship of the theoretical capacity of a facility to the actual traffic volume on that facility. Various factors affect capacity including travel speed, roadway geometry, grade, number of travel lanes, and intersection control. The current standards for evaluating capacity and operating conditions are contained in Highway Capacity Manual1. The procedures describe operating conditions in terms of driver delay represented as a Level of Service (LOS). Operations are given letter designations with "A" representing the best operating conditions and "F" representing the worst. Generally, level of service “D” represents the threshold for acceptable overall intersection operating conditions during a peak hour. The Chart below summarizes the level of service and delay criteria for signalized and unsignalized intersections. For side street stop- controlled intersections special emphasis is given to providing an estimate for the level of service of the minor approaches. Traffic operations at an unsignalized intersection with side street stop- control can be described two ways. First, consideration is given to the overall intersection level of service. This takes into account the total number of vehicles 1 Highway Capacity Manual (HCM), Transportation Research Board, 6th Edition Trips Generated: Enter Exit Enter Exit Single Family Housing Residential 210 20 units 4 11 12 7 189 4 11 12 7 19Totals15 189 PM Peak Weekday ADT Land Use Type Land Use Code Size AM Peak 3 | P a g e Enclave at Manor Rd, Eden Prairie, MN entering the intersection and the capability of the intersection to support these volumes. Second, it is important to consider the delay on the minor approaches, since the mainline does not have to stop. It is common for intersections with higher mainline traffic volumes to experience increased levels of delay and poor level of service on the side streets. A final fundamental component of operational analyses is a study of vehicular queuing, or the line of vehicles waiting to pass through an intersection. An intersection can operate with an acceptable Level of Service, but if queues from the intersection extend back to block entrances to turn lanes or accesses to adjacent land uses, unsafe operating conditions could result. In this report, the Industry Design Standard 95th percentile queue length is used. The 95th Percentile Queue Length refers to that length of vehicle queue that has only a five-percent probability of occurring during an analysis hour. This study has utilized the industry current Synchro/SimTraffic software package (11th Edition) to analyze the No-Build and Build conditions for the AM and PM peak hours. The results for both the 2026 No- Build and Build conditions are summarized in Table 3. Table 3. 2026 No-Build and Build Operations 1. Overall and worst movement LOS reported from Synchro. 2. 95th percentile queues are a result from an average of 10 SimTraffic simulations. The results shown in Table 3 indicate that delay, LOS and queueing are all acceptable on an overall intersection and individual movement basis without and with the Proposed Project. In particular, LOS remains “A” for all movements in all scenarios and the impacts of site-generated traffic from the Proposed Project are very minor. Roadway and intersection improvements are not needed to accommodate the slight increase in traffic. Conclusion The proposed Enclave at Manor Rd Residential development with 20 single family homes has appropriate access, and results from the 2026 Build operational analysis report show acceptable traffic operations and queuing at study area intersections. Please contact Katie Schmidt at katie@s2traffic.com with any questions. Overall LOS & Delay A 0.9 A 1.0 A 1.0 A 1.0 Worst Movement LOS & Delay A 5.2 (SBL)A 5 (SBL)A 5.2 (SBL)A 4.9 (SBL) 95th Percentile Queue Overall LOS & Delay A 0.9 A 0.7 A 1.2 A 0.7 Worst Movement LOS & Delay A 5.3 (SBL)A 5.6 (SBL)A 5.8 (SBL)A 8.4 (SBT) 95th Percentile Queue Overall LOS & Delay A 0.5 A 0.4 A 0.6 A 0.6 Worst Movement LOS & Delay A 2.3 (EBR)A 5.7 (EBL)A 3.5 (WBL)A 4.8 (WBL) 95th Percentile Queue AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour 168th Av W & S Manor Rd (Side-Street Stop-Control) Intersection Criteria 2026 No-Build Measure of Effectiveness (Delay in Sec and Queue in Ft) SBLR - 39' SBLR - 34' Duck Lake Tr & S Manor Rd (Side-Street Stop-Control) 2026 Build EBLR - 29' EBLR - 20' Duck Lake Tr & 168th Av W (Side-Street Stop-Control) SBLTR - 48' SBLTR - 38' SBLR - 43' SBLR - 35' EBLTR - 26' SBLTR - 51' SBLTR - 41' EBLTR - 23' 4 | P a g e Enclave at Manor Rd, Eden Prairie, MN 5 | P a g e Enclave at Manor Rd, Eden Prairie, MN 6 | P a g e Enclave at Manor Rd, Eden Prairie, MN 7 | P a g e Enclave at Manor Rd, Eden Prairie, MN 8 | P a g e Enclave at Manor Rd, Eden Prairie, MN 9 | P a g e Enclave at Manor Rd, Eden Prairie, MN 10 | P a g e Enclave at Manor Rd, Eden Prairie, MN Know what's below. before you dig.Call R SB-1 DRAINAGE AND UTILITY EASEMENTS BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES, AS SHOWN ON THIS PLAT. DRAINAGE AND UTILITY EASEMENTSARE SHOWN THUS: SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 SB-1 SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 SB-1 DRAWN BY DATE REVISIONS PLM 222202 CAD FILE 22SS.GZJ PROJECT NO. 2200 C2.0 EN C L A V E A T M A N O R R O A D ED E N P R A I R I E  M I N N E S O T A PR E L I M I N A R Y P L A T FO R BR A N D L A N D E R S O N 22  R I V E R R I D * E C I R C L E S O 8 T +  S 8 I T E  0 0  B 8 R N S V I L L E  M N      2   W E S T C . R .  2  S 8 I T E  0 0  B 8 R N S V I L L E  M N    0  P+ O N E    2 .   0 .  0   P K D P S W R Q # M U K L Q F . F R P PL A N N E R S  E N * I N E E R S  S 8 R V E Y O R S ZZ Z . M U K L Q F . F R P Ja m e s R . H i l l , I n c . A. 2 =RQLQJ DQG VHWEDFN QRWHV The South 420.00 feet of the West 1/2 of the Southwest Quarter of the Northeast Quarter of Section 5, Township 116, Range 22, Hennepin County, Minnesota, except the West 30.00 feet thereof. PROPERTY DESCRIPTION DRAINAGE AND UTILITY EASEMENTS BEING 5 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING LOT LINES, AND BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, ADJOINING RIGHT OF WAY LINES, AS SHOWN ON THIS PLAT. DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: BEARINGS ARE BASED ON THE SOUTH LINE OF THE W1/2 OF THE SW 1/4 OF THE NE1/4 OF SEC. 5, T. 116, R. 22 WHICH IS ASSUMED TO HAVE A BEARING OF N 88°05'49" W B. 2 LD\RXW C. 22 LD\RXW SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 llllllllllllll l l l l lllllllllllllllllllllllllllllll l lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll l l l l l l llllllllllllllllllllllllllllllll l l SB-1 llllllllllllllllllllllllllllllllllll SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 SB-1 Know what's below. before you dig.Call R SB-1 Know what's below. before you dig.Call R BOTANICAL GENUS: QUANTITY MAX. % % OF TOTAL Abies sp. 25 15% 14% Juniperus sp. 27 15% 15% Picea sp. 25 15% 14% Acer sp. 27 15% 15% Betula sp. 9 15% 5% Celtis sp. 6 15% 3% Gleditsia sp. 8 15% 4% Ostrya sp. 24 15% 13% Quercus sp. 10 15% 6% Tilia sp. 7 15% 4% Ulmus sp. 13 15% 7% TOTAL OVERSTORY TREES: 181 Tag Inches Type Significant? Heritage?Remove? Tag Inches Type Significant? Heritage?Remove? Summary Inches Total Significant Tree Inches Removed 2068 Allowed Removal-None 0 Total Significant Tree Inches Removed for Penalty (A) 2068 Total Significant Tree Inches On-Site (B) 2723 Tree Replacement Constant (C) (C) 0.5 Formula: [(A/B) x C] x A = D Total Replacement Inches (D) 785.28 Total Heritage Inches to Remain as credit 35 Total Heritage Inches to be Removed 40 Total Significant Replacement Inches Owed 750.28 Total Heritage Replacement Inches Owed (2x Removal)80.00 TOTAL MITIGATION INCHES OWED 830.28 504 24 American Basswood Y N N 505 16 American Basswood Y N N 506 20 Northern Red Oak Y N N 507 20 Northern Red Oak Y N N 508 22 Northern Red Oak Y N Y 509 12 Paper Birch Y N Y 510 23 American Basswood - Multi Trunk Y N Y 511 14 Green Ash N N Y 512 12 American Basswood Y N Y 513 17 American Basswood Y N Y 514 40 American Basswood - Multi Trunk Y N Y 515 12 American Basswood Y N N 516 16 Northern Red Oak Y N N 517 12 Green Ash N N N 518 20 Green Ash N N N 519 20 Black Cherry Y N N 520 14 Black Cherry Y N N 521 18 Black Cherry Y N N 522 12 Black Cherry Y N N 523 13 Black Cherry Y N N 524 18 White Pine Y N N 525 31 Eastern Cottonwood Y N N 526 12 Green Ash N N N 527 18 Black Cherry Y N N 528 10 Blue Spruce Y N N 529 23 Honey Locust Y N Y 530 11 Blue Spruce Y N N 531 9 Blue Spruce Y N N 532 14 Bitternut Hickory Y N N 533 14 Black Cherry Y N Y 534 13 Green Ash N N N 535 14 Green Ash N N Y 536 14 Green Ash N N Y 537 20 Eastern Cottonwood Y N Y 538 14 Sugar Maple Y N Y 539 14 Bitternut Hickory Y N Y 540 15 Northern Catalpa Y N Y 541 12 American Basswood Y N Y 542 14 Amur Maple - Multi Stem Shrub N N Y 543 19 Honey Locust Y N Y 544 12 Green Ash N N Y 545 14 Red Maple Y N Y 546 16 Green Ash N N Y 547 15 Blue Spruce Y N N 548 12 Apple Sp. N N Y 549 13 Black Cherry Y N Y 550 14 Green Ash N N Y 551 12 Green Ash N N Y 552 19 Black Walnut Y N Y 553 16 Black Walnut - Multi Trunk Y N Y 554 28 Bur Oak Y N Y 555 12 Green Ash N N Y 556 27 Bur Oak Y N Y 557 27 American Basswood Y N Y 558 30 American Basswood Y N Y 559 14 Paper Birch Y N Y 560 12 Paper Birch Y N Y 561 12 Paper Birch Y N Y 562 18 Black Walnut Y N Y 563 14 Black Walnut Y N Y 564 26 Black Walnut - Multi Trunk Y N Y 565 16 Black Walnut Y N Y 566 17 Black Walnut Y N Y 567 30 Green Ash - Multi Trunk N N Y 568 30 Green Ash - Multi Trunk N N Y 569 30 American Basswood - Multi Trunk Y N Y 420 20 Northern Red Oak Y N Y 421 22 Northern Red Oak Y N Y 422 48 American Basswood - Multi Trunk Y N Y 423 31 American Basswood Y N Y 424 12 American Basswood Y N Y 425 12 American Basswood Y N Y 426 12 American Basswood Y N Y 427 16 American Basswood Y N Y 428 18 American Basswood Y N Y 429 16 Northern Red Oak Y N N 430 12 Green Ash N N N 431 12 Green Ash N N N 432 12 Green Ash N N N 433 19 Black Walnut Y N N 434 8 Blue Spruce Y N N 435 12 Northern Red Oak Y N N 436 12 Black Cherry Y N N 437 14 Blue Spruce Y N N 438 17 Blue Spruce Y N N 439 20 White Pine Y N N 440 12 Blue Spruce Y N N 441 10 Blue Spruce Y N N 442 14 Sugar Maple Y N N 443 12 Green Ash N N N 444 20 Bitternut Hickory Y N N 445 14 Green Ash N N Y 446 12 Bitternut Hickory Y N Y 447 12 Green Ash N N Y 448 16 Green Ash N N Y 449 12 Black Walnut Y N Y 450 17 Black Walnut Y N Y 451 34 Black Walnut - Multi Trunk Y N Y 452 12 Green Ash N N Y 453 14 Red Maple Y N Y 454 12 Red Maple Y N Y 455 12 Green Ash N N Y 456 12 Blue Spruce Y N Y 457 11 Blue Spruce Y N Y 458 9 Blue Spruce Y N Y 459 11 Blue Spruce Y N Y 460 14 Green Ash N N Y 461 12 Apple sp. N N Y 462 74 American Basswood - Multi Trunk Y N Y 463 20 Black Walnut Y N Y 464 24 Sugar Maple Y N Y 465 12 Paper Birch Y N Y 466 14 Black Walnut Y N Y 467 15 Black Walnut Y N Y 468 27 Black Walnut - Multi Trunk Y N Y 469 14 Black Walnut Y N Y 470 18 Black Walnut Y N Y 471 35 American Basswood - Multi Trunk Y N Y 472 13 American Basswood Y N Y 473 16 American Basswood Y N Y 501 40 Black Walnut - Multi Trunk Y N N 502 17 Bitternut Hickory Y N N 503 35 Northern Red Oak Y Y N 367 12 Black Walnut Y N N 368 26 Black Walnut - Multi Trunk Y N N 369 12 Black Walnut - Multi Trunk Y N Y 370 22 Black Walnut Y N Y 371 22 Eastern Cottonwood Y N Y 372 13 Black Walnut - Multi Trunk Y N Y 373 18 Black Walnut Y N Y 374 14 Black Walnut Y N Y 375 14 Black Walnut Y N Y 376 16 Black Walnut Y N Y 377 18 Black Walnut Y N Y 378 17 Black Walnut Y N Y 379 12 Black Walnut Y N Y 380 21 Black Walnut Y N Y 381 13 Sugar Maple Y N Y 382 13 Sugar Maple Y N Y 383 21 Sugar Maple - Multi Trunk Y N Y 384 28 Eastern Cottonwood Y N Y 385 12 Blue Spruce Y N Y 386 18 Black Walnut Y N Y 387 16 Black Walnut Y N Y 388 16 Black Walnut Y N Y 389 29 Black Walnut Y N Y 390 22 Black Walnut Y N Y 391 37 Black Walnut Y N Y 392 18 Black Walnut Y N Y 393 15 Bitternut Hickory Y N Y 394 15 American Basswood - Multi Trunk Y N Y 395 12 Black Walnut Y N Y 396 15 Black Walnut Y N Y 397 16 American Basswood Y N Y 398 16 Black Walnut Y N Y 399 22 Black Walnut Y N Y 400 13 Black Walnut Y N Y 401 18 Green Ash N N N 402 30 Sugar Maple Y N Y 403 18 Blue Spruce Y N Y 404 12 Blue Spruce Y N Y 405 20 Scots Pine Y N Y 406 16 Black Walnut Y N Y 407 12 Black Walnut Y N Y 408 12 Black Walnut Y N Y 409 12 Black Walnut Y N Y 410 14 Black Walnut Y N Y 411 23 Eastern Cottonwood Y N Y 412 16 Black Walnut Y N Y 413 16 Sugar Maple Y N Y 414 12 Black Walnut Y N Y 415 13 Black Walnut Y N Y 416 14 Black Walnut Y N Y 417 28 American Basswood Y N Y 418 27 American Basswood Y N Y 419 40 American Basswood Y Y Y Tag Inches Type Significant? Heritage?Remove? From:ANDI SVENDSEN To:Benjamin Schneider Subject:Enclave at Manor Rd project Date:Tuesday, March 26, 2024 9:47:57 AM Hello Ben, I've reviewed the plans online for this development. While I appreciate that Brandl Anderson would like to leave as many trees as possible, I'm against granting a variance reducing lot size to 65 feet and setback to 25 feet. I do not feel that having the ability to add another lot so the development is more profitable outweighs the impacts of granting their request. The environmental statement regarding the Rusty Patched Bumble Bees does not take into account theother wildlife such as owls that live in those woods. I did not see the full environmental impact report online with the other available documents to fully understand the statement given the summary seems to be a cursory glance at the vegetation. I also feel that reducing lot size to make high density housing is notappropriate for the location of this development given the surrounding houses and lot sizes. Please deny Brandl Anderson's request for lot size variances. Sincerely, Andi Svendsen 16546 S Manor Rd Eden Prairie, MN 55346 From:DONALD T HILL To:Benjamin Schneider Subject:Enclave at Manor Rd - Question Date:Friday, March 29, 2024 12:16:59 PM With the development moving the the water basin to the northwest corner along west 168th Ave. no homes will be next to the area. Will Eden Prairie being taking care of the maintenance of snow removal on the sidewalk in the winter and the cutting of the grass in the summer? This winter even with the lack of snow we still had to walk in the street as nobody took care of the snow removal. ThanksDon Hill 16729 Honeysuckle Ln Eden Prairie, MN 55346 From:Tim and Kay Peters To:Benjamin Schneider; Subject:Brandl Anderson Community Meeting from March 27 Date:Saturday, March 30, 2024 9:07:28 AM Hello Ben, I see you are the Project Planner for this new development (Enclave at Manor Rd). Please forward this email to the correct manager/department that can best reply. As a property owner with a City sidewalk, I'm responsible to clear a path on snowfalls greaterthan 2". There is both a City sidewalk and wheelchair ramp that runs on the west side of this development. The neighborhood received @6" of snow around Feb 14th, and then greater than2" this past week. Neither time were the City sidewalk or access ramp cleared. This sidewalk is well traveled by the neighbors. Is the City able to provide some direction to the newproperty owners on this City requirement? With 17 new homes come the potential of 34 additional cars, plus any extra cars that will now pass through when South Manor Road opens. High Trails Estate Park on West 168th Ave isadjacent to this development. What ideas is the City considering to ensure our children and grandchildren can cross the street safely to enjoy this space? Thanks,Tim Peters 6601 W 168th Ave TO: Planning Commission FROM: Jeremy Barnhart, City Planner DATE: April 8, 2024 SUBJECT: Lotus Villas on Anderson Lake (2024-02) LOCATION: 10700 Prairie Lakes Drive REQUEST: • Guide Plan Change from Office to Low Density Residential on 5.0 acres • PUD Concept Plan Review on 5.0 acres • PUD District Review with waivers on 5.0 acres • Zoning District Change from Office to R1-9.5 on 5.0 acres • Preliminary Plat review on 5.0 acres BACKGROUND The existing 41,000 sq ft office building on site was built in 1982. The property owners propose to redevelop the property with a 19 lot single family residential development with a single, looped private road. PRODUCT The developer proposes a project that they describe as a villa-style neighborhood. This single family detached unit will be individually owned, but the yard areas, landscaping, streets, and other features of the project will be managed by a homeowner’s association. Most of the homes will be a single story plus a basement. The three interior lots will feature 1 ½ story homes on a slab on grade foundation. Each unit will include 2 stall garages. Homes will be between 2,500 and 3,600 sq ft. COMPREHENSIVE PLAN AMENDMENT The property is currently guided Office. The applicant is proposing to re-guide the property to Low Density Residential (0.1-5.0 units per acre). This designation allows only single family detached residential. The proposed density is 3.8 Staff Report – Lotus Villas on Anderson Lake April 8, 2024 Page 2 2 units per acre. Parcels to the north and west are guided Medium Density Residential. Development to the south is Low Density Residential. The change in land use is appropriate given the long term viability for the site as office and the surrounding land uses. Low Density Residential is preferred given the surrounding land uses and the lake to the east. ZONING DISTRICT CHANGE The property is currently zoned office. The applicant is proposing to change the zoning to R1-9.5. The proposed zoning change is consistent with the surrounding land uses, which include single family homes to the south, and twin homes to the north. SITE PLAN/ PRELIMINARY PLAT The nineteen lots are arranged around a single, looped private street. The private street intersects with Prairie Lakes Drive at two locations. There are no other vehicular connections, and no lot is afforded direct access onto Prairie Lakes Drive. A sidewalk is extended along Prairie Lakes Drive and will connect to the existing trail near the SW corner of the site, on the west side of Prairie Lakes Drive. With the goal of preserving the existing slope and vegetation along Prairie lakes Drive, a retaining wall is proposed along the west side of the project area, allowing the pond area to efficiently collect stormwater throughout the site. PARKING Each unit will have a two stall garage, and parking for two cars in the driveway. While not required for single family developments, up to 20 visitor vehicles can be parked along the curbs of the east/ west streets. The streets are 26 feet wide in these locations. PLANNED UNIT DEVELOPMENT AND WAIVER REQUESTS The Planned Unit Development District is established for 4 main purposes: (1) Encourage a more creative and efficient approach to the use of land in the City; (2) Allow variety in the types of environment available to the people of the City; (3) Encourage more efficient allocation and maintenance of privately controlled common open space through the distribution of overall density of population and intensity of land use where such arrangement is desirable and feasible; and, (4) Provide the means for greater creativity and flexibility in environmental design than is provided under the strict application of the provisions of this chapter while at the same time preserving the health, safety, order, convenience, prosperity, and general welfare of the City and its inhabitants. The proposal addresses several of these goals with the provision of a single family home Staff Report – Lotus Villas on Anderson Lake April 8, 2024 Page 3 3 product with a controlled common open space, and variety in the types of environment in the city. While there are waivers requested from the R1-9.5 zoning district, it is important to consider that this district is the most closely suited for the product proposed. The City has not received a number of similar applications to warrant the development of an ordinance to accommodate the product, but will be monitoring the market for that option. The waivers requested include: Lot area. The lots range in size from 6,826 sq ft to 15,632, with the average 8,654 sq ft. the requirement of the R1-9.5 district is 9,500 sq ft. All lots but the 4 corner lots require the waiver. Lot width. The widths of each lot vary between 37 feet to 77 feet, with the average 58 feet. The code requires 70 feet of width. Corner lots are required to maintain a width of at least 90 feet. All lots except for Lot 12, block 2 require the waiver. Lots on a public street. All lots in a R1 zoning district require frontage on a public street. These lots are proposed on a private street. The intent with the requirement is to avoid flag lot situations, or lots with no access. Private streets are commonly used in managed developments like the proposed. Front yard setbacks. The developer proposes a front yard setback of 20 feet (25 feet from the back of curb) for all lots. The zoning code requires a 30 foot setback. Staff supports the reduced setback to bring the homes closer to the street, calming traffic, which preserving at least one car length for driveway parking without extending into the street. Rear yard setback. The three lots backing to the pond show a rear yard setback of 5 feet, less than the required 20 feet. This is in part due to the city’s preference that the pond be within an outlot. In effect, the rear yards for these lots will appear larger, due to the open space and landscaping around the pond area. Lot coverage. The property is in the shoreland overlay district, where maximum lot coverage of impervious surfaces is 30%. The calculated lot coverage for the entire project area is 44.7%, which is less that the current 46.7%. The lot coverage for each individual lot is not known at this stage, but will be greater than 30%. Density. Density of the project is 3.8 units per acre. The maximum density for the R1-9.5 is 3.5 units per acre. The density of the neighborhood to the north is 4 units per acre, and 1.7 units per acre for the neighborhood to the south. TREE LOSS AND GRADING As the site is currently developed, there are a number of trees that will be removed, including significant trees. There are no heritage trees on site. The size and the number of significant trees removed requires 235.1 replacement caliper inches. The landscape plan shows 252 caliper inches planted, exceeding the minimum. This calculation does not include landscaping provided at the foundation of the individual buildings. Staff Report – Lotus Villas on Anderson Lake April 8, 2024 Page 4 4 LANDSCAPING AND SCREENING As a single family detached project, there is no landscaping requirement. Of interest during the development process, however, was the preservation and enhancement of the existing vegetation along the north, west, and south property lines to maintain the existing screening in those areas. This is reflected on the landscaping plans. Additionally, as requested by the neighborhood to the north, the developer proposes a 6 foot tall fence for additional screening. SIDEWALKS AND TRAILS A sidewalk along the east side of Prairie Lakes Drive will be extended to the south entrance to the development, where a crossing will be added to connect to the existing trail on the west side of Prairie Lakes Drive. SIGNS A monument sign is contemplated near the northern access to the site. Any monument sign will need to conform to City Code. UTILITIES Water and sanitary sewer systems, up to the individual services will be public, maintained by the city. Utility connections from the service, Storm water and the street will be private, maintained by the owners or Homeowners association. SUSTAINABILITY STANDARD Since this is project is a Planned Unit Development, it triggers the City’s new sustainable building standard that has been in effect since January 1, 2024. For this project, all homes will have at least one EV-Ready parking space (garage charger) and roof trusses that meets Solar-Ready guidelines. Additionally the homes will be built under the MN Green Path program and utilize energy star appliances. NEIGHBORHOOD MEETING The applicant has communicated with the neighborhood association to the north, and the 4 abutting residents to the south as plans were developed. The applicant hosted a neighborhood meeting on March 27th. A summary of that meeting is provided. One resident commented with concern over the impending noise and dust related to the demolition of the site, and the Staff Report – Lotus Villas on Anderson Lake April 8, 2024 Page 5 5 construction of the project. City Code limits construction activities to between the hours of 7 am and 7 pm, exclusive of Sundays and legal holidays. STAFF RECOMMENDATION Recommend approval of the following requests: • Comprehensive Plan Amendment from Office to Low Density Residential in 5.0 acres • PUD Concept Plan Review on 5.0 acres • PUD District Review with waivers on 5.0 acres • Zoning Change from Office to R1-9.5 on 5.0 acres • Preliminary Plat to divide one parcel into 19 lots and 2 outlots on 5.0 acres This is based on plans submitted on March 14, 2024, staff report dated April 8, 2024, and the following conditions: 1. Prior to release of the Final Plat, the applicant shall: A. Sign special assessment agreement for City trunk sewer and water assessment fees. B. Submit a bond, letter of credit, or cash deposit (“security”) that guarantees completion of all public utility improvements equivalent to 125% of the cost of the improvements. 2. Prior to land alteration permit issuance, the applicant shall: A. Submit detailed stormwater runoff, wetland, utility, street, and erosion control plans for review and approval by the City Engineer. B. Obtain and provide documentation of Watershed District approval. C. Notify the City and Watershed District 48 hours in advance of grading. D. Install erosion control at the grading limits of the property for review and approval by the City. E. Submit a tree replacement letter of credit or escrow surety equivalent to 150% of the cost of the tree replacement. A surety will be required for each phase of tree replacement as shown on the Exhibit B Plans. F. Submit a land alteration bond, letter of credit, or escrow surety equivalent to 125% of the cost of the land alteration. G. Provide recorded copies of any Home Owner Association documents or private covenants and agreements. H. Submit construction plans and project specifications for public infrastructure for review and approval by the city engineer. 3. Prior to building permit issuance for the property, the applicant shall: A. Pay the appropriate cash park fees. 7500 West 78th Street Edina, MN 55439 (952) 947-3000 MN Builder License # 1220 www.RonClark.com Monday February 19, 2024 – Updated March 20, 2024 Jeremy Barnhart, AICP City of Eden Prairie 8080 Mitchel Road Eden Prairie, MN 55344 RE: Lotus Villas, on Anderson Lake Ron Clark Construction is proposing a detached Villa Home neighborhood on the existing 5-acre property located at 10700 Prairie Lakes Drive, the site currently is a 40,000 square foot Office Building/Data Center. The proposed For-Sale single family detached Villa Home neighborhood would have nineteen (19) Villa Homes. Each home will have at least a 2-car garage with a minimum of additional parking for 2 cars in each driveway and approximately 20 guest parking stalls available on the private street. The project will have private streets owned and maintained by the Homeowners Association (HOA) with public sewer & water within an easement dedicated to the city. The overall goal is to work in balance with the existing natural elements of the site while adding new housing to create a small neighborhood that aligns with the surrounding residential areas. The current use of the site clearly does not fit in with the rest of the surrounding residential areas. The maintenance free, main level living design is in high demand for existing Eden Prairie residents that are looking for a ‘Lifestyle’ option while still staying in Eden Prairie near their children and grandchildren. This also, through their existing homes, grants access to young families aspiring to raise their children within the high-quality Eden Prairie schools. The Villas Homes around the exterior of the site will all be single story homes, however the 3 slab-on-grade Villa Homes near the pond will allow for a story and a half design being they have no lower-level areas. Whether this site is developed with 15, 19 or 25 homes, the overall lot coverage, street layout and utility design would be very similar. However, by opting for Villa Homes, you benefit from a streamlined approach with a singular developer, a single builder, and a unified homeowners association. This ensures that the project's completion and maintenance align with the approved design. 7500 West 78th Street Edina, MN 55439 (952) 947-3000 MN Builder License # 1220 www.RonClark.com Comprehensive Guide Plan Change: The current guiding for the site is Office and is occupied by an approximately 40,000 square foot Office Building/Data Center. We are requesting a change to Low Density Residential. The change in land use of this small parcel will have a very minimal effect on the balance of land use within the city. The requested land use of Low Density Residential is consistent with the surrounding neighborhoods on all sides of the property. The land use change will result in no increase in city utility and road services from the current commercial use, with traffic and most other needs being reduced by the new detached single-family use. We feel very strongly that the single-family land use for the site is a more appropriate use for the site than the current office building. Zoning Change: The current zoning for the site is OFC Office and is occupied by an approximately 40,000 square foot Office Building/Data Center. The proposed zoning would change the property to R1-9.5 which allows for single family detached structures with the waivers requested below for this empty nester detached Villa Home style neighborhood. The density we are requesting is 3.8 units per acre, slightly above the allowed 3.5 units per acre, which we feel is reasonable as the footprint and overall size of the Villa homes will be less than what a standard single-family home would be. Also, the proposed street, utility layout, impervious area and the buildable area of the Villa lots would not be any more than a less dense traditional single-family design. Our proposal includes the use of the PUD flexibility which allows us to create our most functional site plan and building layout for the empty nester detached Villa Home neighborhood. The project will also increase the tax value for the city significantly, the current assessed value is $4,370,000 (with the real value about ½ that amount), this new Villa neighborhood will have a projected value for the 19 homes of over 20 million once completed. To create this Villa neighborhood, we have the below applications included: 1) Comprehensive Guide Plan Change from Office to Low Density Residential 2) Rezoning Application – OFC Office to R1-9.5 Single Family 3) Subdivision Waivers requested a. Waiver for Coverage of over 30%, but we are less than prior use. b. Density waiver because of Villa Home style allowing for 3.8 units/acres vs 3.5 units/acre c. Lot size waiver because of Villa Home style for 6,770 sq ft vs.9,500 d. Lot width waiver because of Villa Home style for 55 feet wide vs. 70 feet wide e. Side yard setbacks of 7.5 feet on each side of home for a total of 15 feet between homes 7500 West 78th Street Edina, MN 55439 (952) 947-3000 MN Builder License # 1220 www.RonClark.com f. Front yard setback of 25 feet minimum from private street to garage face vs 30 feet g. Rear yard setback on the 3 homes that back up to the pond to be 5 feet vs 20 feet, they will still have open space and ponding behind them 4) Preliminary Plat Application 5) Request release of the prior Developers Agreement on the site with the use change Preliminary Neighborhood discussions prior to submittal We met with the HOA Board and a few other homeowners from the Weston Woods townhome area to the north in early December as we started to plan out the area. Then a week later we met with a few of the closest neighbors of the single-family area to the south of the site. Both seem generally supportive of the change to residential zoning and the Villa style product. A few of the townhome neighbors would like a fence along our shared property line as their homes look directly across the street at our property. We have focused on both preserving and enhancing the landscaping between us and the two neighborhoods. In general, the neighbors were looking for additional information that is included in this submittal before making a final decision on our new neighborhood, but we think even though change is always hard, that they agreed the residential use is much better long-term use for the site. Wetland and Shoreland Area along Anderson Lake We have submitted to the Nine Mile Watershed District to confirm there are no wetlands on the site or adjacent to the site that affect the project setbacks or restrictions. The Shoreland map shows we are not within the Shoreland impact zone for any portion of the site. The impervious coverage percentages are included on the Site Plan and show a reduction in impervious from the prior use of about 5% (4,300 sq ft) Concept plan comments from Staff We provided an initial concept plan to staff in December to determine if we were on the right path with the site redesign. We received comments from each department and feel we have addressed most of those comments or explained the reasons why. One item discussed was sidewalks within the neighborhood. We are not proposing any internal sidewalks with the limited traffic of only 19 Villa Homes, this is consistent with the neighborhoods north and south, that do not have internal sidewalks as well. We will be extending the current sidewalk along Prairie Lakes Drive along the front of our property. Residents will also be able to walk across Prairie Lakes Drive and connect to the Center Way trail and which gives access Nesbitt Preserve Park. 7500 West 78th Street Edina, MN 55439 (952) 947-3000 MN Builder License # 1220 www.RonClark.com Development Recap: 1) Setbacks a. The project is requesting the following setback waivers from the standard for the R1-9.5 Single family district. b. 7.5-foot side yard setback resulting in a minimum of 15 feet between the Villa homes. c. We are providing a 30-foot setback from the adjoining neighborhoods to the south and north vs the 20-foot standard. d. On the 3 homes backing up to pond we are requesting a 5-foot rear yard setback. 2) Stormwater impact a. See included stormwater report and compliance with both City and Watershed District requirements. b. All runoff from the homes will be piped to the stormwater system and into the pond, only the water landing on the grass in the rear of the homes will continue to leave the site. 3) Buildable area of site a. Total Site Area = 5.00 ac b. Buildable Area of Site = 5.00 ac c. Density on buildable area = 19 units/5.00 ac = 3.8 units/acre d. We are requesting a Waiver or Density from 3.5 to 3.8 units/acre. 4) Lighting a. The site will have street lighting similar to the 2 adjoining neighborhoods. b. The homes will have soffit or wall sconce exterior lighting on the front of the garage controlled by a photocell. 5) Parking for visitors a. All driveways can accommodate two (2) or more cars, plus each Villa Home has two (2) car garages and are required to not store anything in the garage that would not allow for them to park 2 cars internally. b. Additional parking is also available on the private street, this will accommodate approximately 20 cars. 7500 West 78th Street Edina, MN 55439 (952) 947-3000 MN Builder License # 1220 www.RonClark.com c. The private Street will be a city standard 26 foot back-to-back, which allows for parking on one side. Driveways are a minimum of 20 feet wide at the garage, easily allowing for 2 cars to park in each driveway. d. The Minimum distance from the private street to the face of garage is 25 feet. 6) Tree Removal and Replacement Plan a. A Tree Removal and Replacement Plan is provided with our proposal. Our landscape architect has worked closely with the city staff to form an acceptable plan that complies with and/or exceeds the minimums of the City Tree Ordinance. b. Even though most of the Ash trees we are removing are showing signs of damage from the emerald ash bore, we are still replacing them as required by the ordinance. c. The Ash trees we are saving were treated in 2022 and the HOA will continue to treat them going forward, if they are later forced to remove the Ash trees, the HOA will replace them with new trees at that time. 7) Landscaping Plans and Screening a. A fully designed landscaping plan is provided with our application. b. We provided an additional 10 feet of rear yard setback to the adjoining properties along with additional plantings and a 6-foot-high fence to the north as requested by the neighbors. The area behind the homes even though owned by the resident will have Buffer Easement placed on that area related to maintaining required drainage but still allow buffer planting which will make sure that both are maintained, any dead or damaged trees are replaced, and the current drainage flow will be maintained properly per the final grading plan. If at any point these areas are not maintained as required, the city will be allowed to correct the issue and assess the HOA and/or Homeowner for it. With this Buffer Easement in place it allows for more plantings to be included in this area vs. a utility/drainage easement which would not allow for any tree planting. c. The 25-foot setback along Prairie Lakes Drive will also have additional shrubs and trees to maintain and improve the current streetscape. 8) Lot sizes and building footprint coverage 7500 West 78th Street Edina, MN 55439 (952) 947-3000 MN Builder License # 1220 www.RonClark.com a. See the attached Preliminary Plat showing the individual lot sizes, buildable area for each lot and proposed building footprint size for each house. b. We are requesting lot size waiver to 6,770 sq ft from 9,500 and a waiver for lot width to 55 feet from 70 feet for the Villa Homes. 9) Traffic Memo a. Included with the submittal is a traffic memo from a traffic engineer, showing the before and after expected traffic counts. As expected, the residential use is lower traffic than the prior use, in addition the Villa product being focused on empty nesters has reduced traffic form traditional single family. 10) Green infrastructure Analysis a. We have included a recap of the techniques and best management practices we will use for the development of the site. 11) City’s Inclusionary Housing Policy a. The project is single family detached and exempt from the City’s Inclusionary Housing Policy. 12) Sustainable Building Standard/Features a. All Homes will be built under the MN Green Path Program which is focused on energy savings and sustainability. This will result in more than a 30% increase in efficiency in the homes. We will achieve a 50 HERS rating or below in all homes. b. We will have an EV-Ready Garage in each home, install per city specifications, each homeowner will then decide if they want/need a finished charger system to adapt to the wide variety of charging systems currently on the market. Termination location will be clearly marked. c. We utilize many of the Energy Star appliances and Water Sense fixtures available depending on customer selections. d. Solar Ready the homes will have trusses designed to allow for the additional weight of solar panels in the future along with a conduit from the roof to the Electric panel. We will also provide in the HOA declaration that Solar panels would be allowed on the roof. We will also make sure that the electrical panel has open spaces in it to allow for the connection to solar power in the future 7500 West 78th Street Edina, MN 55439 (952) 947-3000 MN Builder License # 1220 www.RonClark.com Housing and Architecture: The single-family detached Villa Homes will be planned and designed to fit into the existing neighborhood but also will add a new style of housing not currently in the neighborhood. We are planning a mix of home designs that range between 2,500 and 3,600 square feet. The home designs will offer two car-plus garages, sunrooms, porches, and decks with a variety internal floorplans and exterior styles. The overall Architecture is still in the development stage, we have provided visual examples and if you look at our current and past projects you will get a sense of the quality of the homes and the variety of the exterior designs. The 3 homes backing up to the pond will offer a slab-on-grade design with the potential for a story and a half design element. Many lots will allow for either a front load or courtyard (side load) garage, this will be decided as each home is built and is not predetermined. Homeowners Association (HOA): A Homeowners Association will be planned for the neighborhood. The Association will maintain each home’s lawn care and snow removal along with maintaining all common area landscaping and the monument. The Homeowners Association will be responsible for continuing to actively maintain the rear yard drainage as shown on the grading plan along with maintaining the buffer planting as approved in those areas. With the Buffer Easement in place the Homeowners Association, coupled with the city's monitoring rights, facilitates the inclusion of more trees in the buffer areas between neighborhoods. This approach surpasses the tree planting that would be permissible if the area were designated as a drainage easement. Development Team: Project Architect – Whitten Associates, Inc. – Tim Whitten and Heather Maanum Project Engineer – Campion Engineering - Marty Campion Project Surveyor – Westwood – Chris Ambourn Developer and Builder – Ron Clark Construction – Mike Waldo and Landon Wittenberg 1 2 2 3 P R A I R I E L A K E S D R I V E TRACT B 5001 5002 5003 5004 5005 5008 5009 5022 5025 510151025103 5104 5105 5116 5117 5118 5124 5130 5137 5139 5164 13 23-026 02/16/2024 RON CLARK CONSTRUCTION EDEN PRAIRIE, MN N PO BOX 41486 PLYMOUTH, MN 55441 PHONE: (763)486.3799 EMAIL: MCAMPION@CAMPIONENG.COM N CAMPION ENGINEERING SERVICES, INC. CLYLO EQJLQHHULQJ LDQG PODQQLQJ 4 PRELIMINARY SITE PLAN LEGEND 1 2 2 3 P R A I R I E L A K E S D R I V E TRACT B 5001 5002 5003 5004 5005 5008 5009 5022 5025 5101 5102 5103 5104 5105 5116 5117 5118 5124 5130 5137 5139 5164 PID 1311622340034 Owner FARHANA AHMED & STEVEN J MCLAIRD PID 1311622340035 Owner JERALD S JOHNSON TRUSTEE PID 1311622340036 Owner TODD A MORGAN PID 1311622230006 Owner CITY OF EDEN PRAIRIE PID 1311622310035 Owner WEST ON WOODS ON ANDERSON LK N55° 4 9 ' 2 1 " E 4 2 0 . 4 7 N 2 8 ° 0 6 ' 4 8 " W 1 7 3 . 5 2 N 2 1 ° 0 9 ' 5 8 " W 3 2 1 . 6 7 3 0 . 0 0 N 3 4 ° 3 4 ' 2 0 " W N52 ° 1 8 ' 0 3 " E 4 1 9 . 4 8 L = 5 8 . 5 8 C H = 5 6 . 2 8 C H B = N 3 7 ° 4 1 ' 5 4 " W R = 6 0 . 0 0 Δ = 5 5 ° 5 6 ' 2 0 " N 1 7 ° 2 8 ' 4 3 " W 2 2 3 . 0 4 L = 2 7 5 . 0 1 R = 7 3 0 . 0 0 Δ = 2 1 ° 3 5 ' 0 4 " Found Capped Iron Pipe inscribed License No. 7085 Found Iron Monument Found Iron Monument Found Capped Iron Pipe inscribed License No. 6235 F o u n d C a p p e d I r o n P i p e i n s c r i b e d Li c e n s e N o . c a p u n r e a d a b l e Existing Chain Link Fence 0.6 feet southeasterly of property line Existing Chain Link Fence 0.7 feet southeasterly of property line 8 0 . 0 0 f o o t P u b l i c R i g h t o f W a y 9 . 1 Existing Chain Link Fence on property line Existing Chain Link Fence on property line Existing Chain Link Fence 0.2 feet southeasterly of property line Existing Chain Link Fence 3.4 feet northwesterly of property line Existing Chain Link Fence 9.1 feet northwesterly of property line 1 Access Entrance B i t u m i n o u s s u r f a c e 48.0 B-B 16.7 B-B 16.7 B-B 15.1 15.8 1 9 . 2 8 " W M 8 " W M 8 " W M 13 23-026 02/16/2024 RON CLARK CONSTRUCTION EDEN PRAIRIE, MN N PO BOX 41486 PLYMOUTH, MN 55441 PHONE: (763)486.3799 EMAIL: MCAMPION@CAMPIONENG.COM N CAMPION ENGINEERING SERVICES, INC. CLYLO EQJLQHHULQJ LDQG PODQQLQJ 8 PRELIMINARY GRADING PLAN “” ” – ” ” – ” LEGEND 1 2 2 3 P R A I R I E L A K E S D R I V E TRACT B 5001 5002 5003 5004 5005 5008 5009 5022 5025 510151025103 5104 5105 5116 5117 5118 5124 5130 5137 5139 5164 13 23-026 02/16/2024 RON CLARK CONSTRUCTION EDEN PRAIRIE, MN N PO BOX 41486 PLYMOUTH, MN 55441 PHONE: (763)486.3799 EMAIL: MCAMPION@CAMPIONENG.COM N CAMPION ENGINEERING SERVICES, INC. CLYLO EQJLQHHULQJ LDQG PODQQLQJ 5 PRELIMINARY SANITARY SEWER & WATERMAIN ” “ ” “” LEGEND 5001 5002 5003 5004 5005 5008 5009 5022 5025 5101 5102 5103 5104 5105 5116 5117 5118 5124 5130 5137 5139 5164 Retaining Wall See CIVIL SET Retaining Wall See Civil Set 6' High Opaque Fence See Civil Set Monument Sign See Civil Set Pond Maintenance Access, Typ. See Civil Set Note: 1.See LANDSCAPE set for additional details, notes, and plant list. 2.See CIVIL set for all project general notes, existing conditions, plat, site plan, sanitary sewer & watermain plan, storm sewer plan, grading plan, stormwater pollution prevention plan, tree inventory, and related notes & details. This includes, but is not limited to, site features such as walls and fences, toposoil spreading, temporary site stabilization, and erosion control. 3.Prior to digging, the Contractor shall contact GOPHER STATE ONE CALL at 651.454.0002 or 800.252.1166 for utility locations 48 hours prior to construction. 4.The Contractor shall verify and coordinate the location of plant material with site features, utilities, and building features such as doors, windows, overhangs, walks, drives and patios. 5.The Contractor shall stake the location of trees for review and approval prior to installation. 6.If a discrepancy exists between the quantity of plants shown on the plant schedule and the quantity shown on the plan, the plan shall govern. 7.All trees shall be installed in accordance with the Tree Planting Detail, including all soil amendments and mulch. 8.Final foundation treatment and detailed planting at the building entrances shall be as agreed upon by the Homeowner and Builder. 9.Contractor shall provide site-wide irrigation design and installation. Irrigation shall extend into the vegetated areas within the public right-of-way and to the edge of the pavement/back of curb. Irrigation shall be fully-programmable and capable of the following: 9.1.alternate date watering 9.2.head to head or drip coverage 9.3.delivering one inch of precipitation per week 9.4.include a rain sensor override. 10.Landscape materials shall be warranted per the notes on Sheet L-2. 11.All plant material shall be watered and maintained for establishment and through the warranty period. 12.Contractor shall keep a clean and tidy site. 13.Contractor shall repair, at no cost to owner, any and all damage resulting from the Contractor's work. Lawn-Sod Final Foundation Treatment and Detailed Planting To be determined with builder and homeowner. Green Mountain Maple-Acer saccharum 'Green Mountain' Heritage River Birch-Betula nigra 'Heritage' Blue Beech-Carpinus Caroliniana Skyline Honeylocust-Gleditsia tricanthos var. inermis 'Skycole' Kentucky Coffeetree Decaf-Gymnocladus dioica 'McKBranched' Existing Tree to Remain Swamp White Oak-Quercus bicolor Norway Spruce-Picea abies Black Hills White Spruce-Picea glauca 'Densata' L-2 A Native Stormwater Seed Mix A LEGEND White Spruce-Picea glauca Native Stormwater Seed Mix B Sample Foundation PlantingL-2 A 2 23-026 02/16/2024 LOTUS VILLAS, ON ANDERSON LAKE RON CLARK CONSTRUCTION EDEN PRAIRIE, MN PO BOX 16646 Minneapolis, MN 55416 PHONE: (612)642-1382 EMAIL: sarah@studiogro.com I hearby certify that this plan, specification, or report has been prepared by me or under my direct supervision and that I am a duly licensed Professional Landscape Architect under the laws of the State of Minnesota. Sarah Sutherland, PLA 45553 2/16/2024 3/7/2024 PER CITY REVIEW DATED 3-6-2024NO. 1 N L-1L-1 1 2 2 3 P R A I R I E L A K E S D R I V E TRACT B PID 1311622340034 Owner FARHANA AHMED & STEVEN J MCLAIRD PID 1311622340035 Owner JERALD S JOHNSON TRUSTEE PID 1311622340036 Owner TODD A MORGAN PID 1311622230006 Owner CITY OF EDEN PRAIRIE PID 1311622310035 Owner WEST ON WOODS ON ANDERSON LK N55° 4 9 ' 2 1 " E 4 2 0 . 4 7 N 2 8 ° 0 6 ' 4 8 " W 1 7 3 . 5 2 N 2 1 ° 0 9 ' 5 8 " W 3 2 1 . 6 7 3 0 . 0 0 N 3 4 ° 3 4 ' 2 0 " W N52° 1 8 ' 0 3 " E 4 1 9 . 4 8 L = 5 8 . 5 8 C H = 5 6 . 2 8 C H B = N 3 7 ° 4 1 ' 5 4 " W R = 6 0 . 0 0 Δ = 5 5 ° 5 6 ' 2 0 " N 1 7 ° 2 8 ' 4 3 " W 2 2 3 . 0 4 L = 2 7 5 . 0 1 R = 7 3 0 . 0 0 Δ = 2 1 ° 3 5 ' 0 4 " Found Capped Iron Pipe inscribed License No. 7085 Found Iron Monument Found Iron Monument Found Capped Iron Pipe inscribed License No. 6235 F o u n d C a p p e d I r o n P i p e i n s c r i b e d L i c e n s e N o . c a p u n r e a d a b l e Existing Chain Link Fence 0.6 feet southeasterly of property line Existing Chain Link Fence 0.7 feet southeasterly of property line 8 0 . 0 0 f o o t P u b l i c R i g h t o f W a y 9. 1 Existing Chain Link Fence on property line Existing Chain Link Fence on property line Existing Chain Link Fence 0.2 feet southeasterly of property line Existing Chain Link Fence 3.4 feet northwesterly of property line Existing Chain Link Fence 9.1 feet northwesterly of property line 1 Access Entrance B i t u m i n o u s s u r f a c e 48.0 B-B 16.7 B-B 16.7 B-B 15.1 15.8 1 9 . 2 8 " W M 8 " W M 8 " W M 13 23-026 02/16/2024 RON CLARK CONSTRUCTION EDEN PRAIRIE, MN N PO BOX 41486 PLYMOUTH, MN 55441 PHONE: (763)486.3799 EMAIL: MCAMPION@CAMPIONENG.COM N CAMPION ENGINEERING SERVICES, INC. CLYLO EQJLQHHULQJ LDQG PODQQLQJ 3 PRELIMINARY PLAT LEGEND 1 2 2 3 P R A I R I E L A K E S D R I V E TRACT B 5001 5002 5003 5004 5005 5008 5009 5022 5025 510151025103 5104 5105 5116 5117 5118 5124 5130 5137 5139 5164 PID 1311622340034 Owner FARHANA AHMED & STEVEN J MCLAIRD PID 1311622340035 Owner JERALD S JOHNSON TRUSTEE PID 1311622340036 Owner TODD A MORGAN PID 1311622230006 Owner CITY OF EDEN PRAIRIE PID 1311622310035 Owner WEST ON WOODS ON ANDERSON LK N55° 4 9 ' 2 1 " E 4 2 0 . 4 7 N 2 8 ° 0 6 ' 4 8 " W 1 7 3 . 5 2 N 2 1 ° 0 9 ' 5 8 " W 3 2 1 . 6 7 3 0 . 0 0 N 3 4 ° 3 4 ' 2 0 " W N52° 1 8 ' 0 3 " E 4 1 9 . 4 8 L = 5 8 . 5 8 C H = 5 6 . 2 8 C H B = N 3 7 ° 4 1 ' 5 4 " W R = 6 0 . 0 0 Δ = 5 5 ° 5 6 ' 2 0 " N 1 7 ° 2 8 ' 4 3 " W 2 2 3 . 0 4 L = 2 7 5 . 0 1 R = 7 3 0 . 0 0 Δ = 2 1 ° 3 5 ' 0 4 " Found Capped Iron Pipe inscribed License No. 7085 Found Iron Monument Found Iron Monument Found Capped Iron Pipe inscribed License No. 6235 Fo u n d C a p p e d I r o n P i p e i n s c r i b e d L i c e n s e N o . c a p u n r e a d a b l e Existing Chain Link Fence 0.6 feet southeasterly of property line Existing Chain Link Fence 0.7 feet southeasterly of property line 8 0 . 0 0 f o o t P u b l i c R i g h t o f W a y 9. 1 Existing Chain Link Fence on property line Existing Chain Link Fence on property line Existing Chain Link Fence 0.2 feet southeasterly of property line Existing Chain Link Fence 3.4 feet northwesterly of property line Existing Chain Link Fence 9.1 feet northwesterly of property line 1 Access Entrance B i t u m i n o u s s u r f a c e 48.0 B-B 16.7 B-B 16.7 B-B 15.1 15.8 1 9 . 2 8 " W M 8 " W M 8 " W M 13 23-026 02/16/2024 RON CLARK CONSTRUCTION EDEN PRAIRIE, MN N PO BOX 41486 PLYMOUTH, MN 55441 PHONE: (763)486.3799 EMAIL: MCAMPION@CAMPIONENG.COM N CAMPION ENGINEERING SERVICES, INC. CLYLO EQJLQHHULQJ LDQG PODQQLQJ 6 PRELIMINARY STORM SEWER PLAN ’ ’ DETAIL A POND CROSS SECTION Memo To: Mike Waldo From: Ed Terhaar, PE Ron Clark Construction File: 193806865 Date: February 19, 2024 Reference: Trip Generation Information for 10700 Prairie Lakes Drive in Eden Prairie, MN I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. __________________________________ DATE: February 19, 2024 Edward Terhaar License No. 24441 Purpose and Background This memorandum presents trip generation information for the existing office use and the proposed residential use located at 10700 Prairie Lakes Drive in Eden Prairie. Existing Conditions The project site currently contains a 40,000 square foot office building with a surface parking lot. Proposed Development Characteristics The proposed project consists of constructing 19 new villa dwelling units. Access will be provided at two locations on Prairie Lakes Drive. Trip Generation Weekday a.m. and p.m. peak hour trip generation for the existing office and the proposed residential were calculated based on data presented in the eleventh edition of Trip Generation, published by the Institute of Transportation Engineers (ITE). The resultant trip generation estimates are shown in Table 1. Table 1 Trip Generation for Existing and Proposed Uses Land Use (ITE Land Use Code) Size Weekday AM Peak Hour Weekday PM Peak Hour Weekday Daily In Out Total In Out Total Total Existing Use Office (710) 40,000 SF 54 7 61 10 48 58 434 Proposed Use Single Family Dwelling Units (210) 19 DU 3 10 13 11 7 18 179 Notes: SF=square feet, DU=dwelling unit As shown in the table, the proposed use generates 48 fewer trips in the a.m. peak hour, 40 fewer in the p.m. peak hour, and 255 fewer on a daily basis. 10700 Neighborhood Meeting Summary 3/27/2024 Noted Questions and Concerns from Neighbors: Mike Waldo did an overall recap of the project, the proposed 19 villas, then change in land use to low density Single Family from office/commercial and process for approval, etc. Discuss similar projects we have done in other communities and a little about Ron Clark construction and the fact we will be the developer and builder which allow for a much more seamless process, if any issues arise they can always call or email him directly • Fence & landscape buffer to adjacent properties. o We have proposed a new 6 foot high fence on the northwest side as requested by a few of the townhome neighbors, that fence and specification is included in our submittal and was shown to meeting attendees. To the south we will work individually with each neighbor to determine the best screening plan, they all have existing fences and replacement of those fences may do more damage to the existing planting then just leaving as is. o Do we have flexibility to work with neighbors regarding tree plantings/landscaping on both sides of property line? This is something to be discussed with city as we move forward. We stated we will work with the south neighbors to do plantings, ect. on our site and maybe a few trees/plants on their property if that provides the best screening for both properties. • Construction traffic/timeline o What is projected timeline for demolition? And start date? Shooting for early June Demo start and should complete the demo scope in 2 weeks. o Discussed that building has had a site Phase 1 and Hazardous materials survey completed and the couple minor items (window caulk, etc.) will be removed prior t any demo work being started. o How will possible dust/air pollution be mitigated? When speaking with Demo vendors, if need be, they will use water to mitigate dust/air pollution. o What is expected construction traffic? At most this will be 60 or so trucks a day hauling at certain points throughout the initial demo and grading process. o Who’s responsible for keeping prairie lakes dr. clean and free of debris? This will be maintained by street sweeping at least twice a week if not more. • Home values & property taxes o How will this affect neighboring home values and property taxes? Overall, this project will be priced higher than neighboring homes therefore economically speaking this should increase home values. With that said, property taxes may increase but not dramatically as this new project should bring in about 25- 30,000,000 of increased tax base. o What is projected price point of these units? Most likely anywhere from just under a $1 million to $1.5 million. o How “custom are these homes” and will all be built from scratch for each homeowner? We will deliver 3 or so specs/model immediately. Most buyers will go ahead and customize their fixtures and finishes. For example, kitchen appliances, flooring, tile, etc. Each villa will not be a full-blown custom home, but we are not the run of the mill “cookie cutter” builder. Most units will have variances between them regarding finishes, giving each villa its own unique finish. Other Noted Questions: • HOA Structure - Should be similar to Greenway Villas in Golden Valley. • Why private street? - Cost is on HOA and not the city. • Water run-off/drainage issues? - There will be no additional run-off into adjacent TH’s & Homes. • Communication process- Internally REC will create a neighbor email list and send out updates. The frequency of this can be increased upon request by the neighbors. Our project information can be found on the city of EP website. Our other comparable projects can be found on our Ron Clark website. Overall, most neighbors were supportive of the change in use of the property to Single Family. As you can see most of the questions revolved around the process and the potential for noise, dust and additional traffic during construction. Long term the change will make for a much more cohesive area with all residential uses. As previously indicated, we do not object to the proposed development plan. However, given our proximity to the SAP property we are concerned that the noise pollution, dust and dirt from the project will be a nuisance that significantly impacts the use and enjoyment of our home. Ron Clark has indicated they will install a fence along the property line but has not indicated when the fence will be installed. We requested that the fence be installed prior to the start of demolition. Ron Clark has indicated that the demolition and infrastructure development will be conducted to minimize the amount of dirt and dust produced by spraying water as necessary. We understand that there will be significant noise pollution during all segments of the development process. It’s our understanding that it’s likely that the decibel level from demolition and infrastructure development, as well as the reverse beeping from construction equipment during all phases, will likely exceed the allowable levels specified in the Minnesota Noise Pollution Control Rules. We would appreciate it if the hours that equipment is operated or there is noise producing building activity (e.g., framing work) be limited to Monday through Friday, and to cease by 5:00 PM each day. Ron Clark has indicated that the grade of the property will not be changed so as to increase water flow on or under our property. Based on the drawing provided (Site Section 2, prepared by Whitten Associates, Inc.) it appears that the grade will be higher than it currently is but we really can’t tell. We request that the City monitor the traffic for speed and safety on Prairie Lakes Drive during all phases of the construction process. The speed limit on Prairie Lakes Drive was recently increased to 30 mph which did not make sense to us, especially now with this upcoming project. Mark & Becky Kuck 10684 Leaping Deer Ln Eden Prairie, MN 55344 From:City of Eden Prairie To:Planning Subject:*NEW SUBMISSION* Contact Us: Planning and Zoning Date:Thursday, March 14, 2024 2:37:01 PM Contact Us: Planning and Zoning Submission #:3067296 IP Address:15.181.49.124 Submission Date:03/14/2024 2:36 Survey Time:7 minutes, 1 second You have a new online form submission. Note: all answers displaying "*****" are marked as sensitive and must be viewed after your login. Please complete this form to provide comments or ask questions. Planning Division Eden Prairie City Center 8080 Mitchell Road 952-949-8485 Full Name Mark Kuck Email kuckchalet@outlook.com Full Address 10684 Leaping Deer Ln Eden Prairie, MN 55344 Phone (612) 578-6185 Message We understand that Ron Clark Construction has submitted a proposal to develop the SAP site at 10700 Prairie Lakes Drive. Our home in Weston Woods on Anderson Lakes is adjacent to the SAP site (the building is within 130 feet from our home). We have sent Mike Waldo our questions in writing as we can't attend the proposed meeting. We would like to send our comments to the planning commission as well. Can you please let us know who we can send them to? Thank you, Mark & Becky Kuck Would you like to be contacted regarding your comments? Yes How do you prefer we contact you? Email Thank you, City of Eden Prairie This is an automated message generated by Granicus. Please do not reply directly to this email. 6 Pictures from our Legacy Oaks Neighborhoods 7 Pictures from our Legacy Oaks Neighborhoods 8 Pictures from our Legacy Oaks Neighborhoods 20 Pictures from our Pike Lake Landing Neighborhood 9 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Stairs down and Foyer KitchenDining Study Great RoomFront of home 10 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Lower Level Family Room Laundry –Mud/Craft RoomOwners Suite Bath Lower Level Bar & Game area Owners Suite Bath Owners Suite Bedroom 11 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Office Nook KitchenDining Owners Suite Bedroom Great RoomFront of home 12 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Lower Level Family Room Laundry –Mud RoomOwners Suite Bath Lower Level Bar & Game area Owners Suite Bath Front of home 13 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Lower Level Family Room Laundry –Mud RoomOwners Suite Bath Lower Level Bar & Game area Owners Suite Bath Front of home Example Villa Floor Plans 15 GV-MANCHESTER 1956 S.F. MAIN LEVEL 3546 S.F. 1590 S.F. LOWER LEVEL TOTAL UNFIN. MECH 176 S.F. 08/31/2023 1230 GREENWAY PASS Garage 23'-9"x26'-0" Front Porch Foyer Family Foyer Bench & Hooks W D Primary Bedroom 12'-5"x15'-0" Dining 12'-5"x12'-10"Great Room 12'-0"x17'-9" Kitchen 12'-0"x20'-0" Hall Primary Bath W.I.C. Clo. Office Pwdr Pantry Deck 27'-0"x13'-0" Clo. Built-Ins Sun Room 12'-0"x14'-0" Bar 9'-0"x9'-0" Games 12'-0"x16'-0" Family Room 13'-5"x16'-5" Bedroom 2 12'-5"x13'-5" Hall Clo. Bath Mechanical Bedroom 3 12'-0"x13'-0" Flex Room Ga s F i r e p l a c e Bu i l t - I n s Bu i l t - I n s Storage Patio Screen Porch 13'-0"x14'-8" Clo. Ln. Ledge Clo. Ln . Bench Ga s F i r e p l a c e Bu i l t - I n s Bu i l t - I n s Hall UP 1 6 R D DN DN W IRONWOOD 1688 S.F. MAIN LEVEL 3088 S.F. OPT. FLEX ROOM 137 S.F. 1400 S.F. LOWER LEVEL TOTAL UNFIN. MECH 151 S.F. PatioOpt. Screened Porch Opt. Sun Room Deck 143 S.F. OPT. SUN ROOM 07/12/2022 SEAT Garage Family Foyer W.I.C. Owner's Bath Owner's Suite Hall Pwdr Foyer Kitchen Dining Great Room Deck Front Porch Study Clo. Optional Bar W.I.C Bedroom 3 Bath Clo. Bedroom 2 Hall Finished Family Room Games Opt. Flex Room Linen Patio Mechanical Ln. Drop Zone Bench & Hooks D W Fireplace Built-Ins Built-Ins Optional Fireplace Optional Built-Ins Optional Built-Ins Storage 3,368 with Porch and Flex Bufftech ® Molded and Extruded Textured Fence Products The Bufftech® Advantage Two innovative product lines under one great brand Long-lasting beauty, superior performance and the best protection you can get – that’s the Bufftech Advantage. Bufftech fence comes in an array of sophisticated styles, complementary colors and authentic finishes along with premium features to ensure it will outlast and outperform the competition. Bufftech also features a superior warranty including ColorLast® fade protection. Molded Fence Bufftech has reinvented fence manufacturing with its patented design of rotationally-molded fence, allowing realistic granite- stone and deep-grain wood textures molded from real wood and stone. Molded fence has very high impact-resistance and excellent sound absorption for quiet and secure outdoor living spaces and yards. These extremely durable privacy fences also offer fade-resistant colors and steel-reinforced sections. Extruded Fence Bufftech extruded fence is the undisputed leader in style, color and texture. Our innovative textures are molded from real wood to deliver the most authentic look available today. Fade-resistant colors, high-quality accessories, durable hardware and steel reinforced rails ensure a long- lasting installation. Extruded fence also offers SureStart™ protection, an exclusive CertainTeed benefit covering warranted repair and replacement costs, including labor, for five years after installation. On Cover: Sherwood in Nantucket Gray Bufftech® Molded Fence The Bufftech Advantage starts with details. Patented Construction Rotationally-molded allowing realistic granite- stone appearance and dramatic wood texture. Internal Reinforcement with galvanized steel to withstand significant impact or wind load without compromising aesthetics. Sound Barrier Blocks 98% of direct sound. Color & Texture Bufftech fence products set the standard for the latest innovations in decorative privacy. From our proprietary manufacturing process to our vibrant colors, CertainTeed is the undisputed leader in color and texture. Our finish is molded from real wood and stone to deliver the most authentic look available today. Plus, Bufftech is virtually maintenance-free, and never needs staining or painting. Allegheny® Sherwood Beige Granite Dark Brown Granite Walnut Brown Nantucket Gray Brown Granite Dark Gray Granite Red Cedar Dark Gray Oak Gray Granite 4 Colors throughout this brochure are simulated. Consult product color samples before making final selection. Performance Bufftech’s molded fence is made with a proprietary blend of polyethylene plastic and is reinforced with galvanized steel. Our extremely durable fence creates solid privacy and security without compromising aesthetics. With exclusive WindZone™ performance, Bufftech fence is engineered for use in high wind and hurricane conditions, as approved by Miami-Dade County NOA #22-0616.10*. Recognized as the most stringent standards in the country, Miami-Dade test protocols include dynamic wind load testing up to 115 mph. The Bufftech line meets requirements of the ASTM and includes styles that comply with local codes for swimming pool applications. Check with your local building code official as local codes may vary. Molded panels block 98% of direct sound, Allegheny has a (STC) sound transmission class of 26 and Sherwood has a STC of 23 to create quiet spaces. *Miami-Dade County-approved NOA #22-0616.10, for exceptional performance in high wind conditions. To comply with WindZone Performance, additional items are needed for installation. Please reference our product catalog. Expires 4/4/2028. Peace of Mind CertainTeed stands behind the Bufftech molded fence line with an exceptional lifetime limited warranty. Bufftech Sherwood and Allegheny have CertainTeed's ColorLast® fade protection. UV inhibitors protect against the sun’s harsh rays to maintain vibrant colors. Our polymers have been tested to withstand extreme weather conditions with little or no fading. Graffiti resistance makes removing graffiti easy by using a high-powered pressure washer. CertainTeed is actively pursuing strategies to reduce our environmental impact, while increasing the sustainability of our operations and products. CertainTeed conducted a Life Cycle Assessment (LCA) that was submitted to the National Institute of Standards and Technology (NIST) and was published in the building product LCA database, BEES (Building for Environmental and Economic Sustainability). A company you can trust. For more than 100 years, homeowners and building professionals alike have relied on CertainTeed as a trusted source of innovative, high-quality building products. Bufftech® continues this long- standing tradition with its superior fence line, proudly made in the U.S.A. 5 STC 26STC 23 STC 21 TO: Planning Commission FROM: Jeremy Barnhart, City Planner DATE: April 8, 2024 SUBJECT: Asia Mall Parking lot expansion LOCATION: 12160 Technology Drive REQUEST: • Planned Unit Development Concept Review on 4.69 acres • Planned Unit Development District Amendment with waivers on 4.69 acres • Site Plan approval on 4.69 acres BACKGROUND In 2020, approval was granted for the reuse of the former Gander Mountain to Asia Mall, a two story retail center with a ground level grocery story and restaurant spaces. Office and additional retail uses also occupy the space. Asia Mall opened in November, 2022. After a short while, it because apparent that the parking did not meet the business need of the property. With the parking lot full, mall patrons were observed parking at adjacent private properties, and crossing Technology Drive causing safety concerns for both pedestrians and motorists. At the initial opening, in the holiday season and during a winter of heavy snows, a parking issue was identified. Since then, Mall ownership has sought ways to better manage the parking needs. During periods of high business volume, additional security has been hired to direct traffic; snow will be removed from parking spaces; and the construction of additional parking is proposed. As a longer term solution, the expansion requires land use approvals. SITE PLAN The proposal is to replace an existing stormwater pond with surface parking and an underground stormwater management system. The additional parking area would add 122 spaces, primarily east of the main entrance, Staff Report – Asia Mall Parking lot expansion April 8, 2024 Page 2 2 where a right turn lane into the site is also added. The existing pedestrian pathway of red concrete will be extended east into the new portion of the parking lot for added visibility and safety of pedestrians. The proposal includes additional landscaping and provides for additional parking lot lighting. PLANNED UNIT DEVELOPMENT WAIVERS The following waivers are requested: Front yard (north, and south), side yard setback (west). A waiver has been granted for the existing parking lot to encroach into required front yard on the south. The proposal continues that encroachment along the south property line providing for consistency in the site design. Additionally, the proposed parking lot expansions encroach into the west and north required yards. These encroachments are supported because there will not be any further development of these areas and there is significant separation from the property and the large electrical transmission yard to the west, and an on-ramp to Interstate 494 to the north. Given these unique land uses, the goals of minimum setbacks (separation of uses, provision of open space, etc.) are maintained. Impervious Surface area. This property is within the shoreland overlay district, where the maximum impervious surface area is 30%. The site plan shows 97% impervious surface. Is it difficult to avoid impervious surface waivers in existing commercial/ retail environments. The shoreland regulations, including the impervious surface area limits, are intended to protect the natural characteristics of the land, and the quality of the water body. In developed commercial environments, the natural quality is already compromised, so the primary goal shifts to minimizing the impervious surface and water quality. The stormwater management standards protect the water quality. Reducing impervious surface is not practical with the scope of this project due to many factors, including timing. Staff Report – Asia Mall Parking lot expansion April 8, 2024 Page 3 3 Parking. The existing and proposed uses of the building requires 445 parking spaces: Current Proposal ITE Parking Generation Square feet Parking stalls Weekday peak Saturday Peak Office 4,873 21.9 12 1 Non-grocery retail 5,218 23.5 12 17 Common space 12,560 25.1 Grocery 33,645 151.4 99 122 Type 1 Rest. 5,725 60.0 99 109 Type 2 Rest. 886 8.0 118 118 Type 3 Rest. 11,664 155.0 Parking required 74,571 445 340 367 Total parking provided is 424 spaces. While there is a parking deficit of 21 spaces, the site provides 95% of the code requirements based on the variety of uses. The original approval of Asia Mall granted a waiver to allow 76% of the required spaces, to 294 spaces. The number of parking spaces provided exceeds the ITE suggested parking requirements for both Weekday and Saturday peaks. Parking islands (size and number). City Code requires one landscaped island per 20 stalls, each island be 160 sq ft minimum, and the cumulative area of parking islands be equal or greater than 5% of the parking lot area. While overall the total area of parking lot islands exceeds the minimum standard, to meet the standard for the number and size of islands, at least 6 new islands would need to be added, and two proposed islands would need to be enlarged, resulting is 8 less parking spaces. In this situation, waivers are preferred to prevent off-site parking, as street parking and parking on adjacent private parcels is not possible. TREE REPLACEMENT AND LANDSCAPING 39 trees will be removed to facilitate the parking lot expansion. It is the city’s practice that non-significant trees required of a previous approval be replaced at a ratio of 1:1. Other significant trees will be replaced subject to the city’s tree replacement ordinance. A combination of planting of trees, shrubbery, and payment in lieu of tree replacement will satisfy these requirements. Upon completion of the project, 43 trees and 65 shrubs will be planted on site. The landscaping plan provided shows new trees and shrubbery along the south property line, east of the main drive. Staff recommends these trees and shrubs be spaced out along the south property line, Staff Report – Asia Mall Parking lot expansion April 8, 2024 Page 4 4 to improve the streetscape interest along the entire frontage, rather than concentrated along a relatively small section of frontage. This is reasonable given the front yard setback waivers requested. SIDEWALKS AND TRAILS There is currently no sidewalk along the north side of Technology Drive And there are no plans to add a sidewalk or cross walk in the area. While there is a trail along the south side of Technology Dr., any future construction of a crosswalk would need to be intentional to avoid introduction of an unsafe situation, or funneling patrons to private property. If one is added in the future, portions of these improvements are the responsibility of the property owner. The development agreement will speak the property owner’s responsibilities. DRAINAGE Stormwater will be managed with an underground system under the eastern addition of the parking lot. This system limits the ability to plan trees or other landscaping in the immediate area. The stormwater management system will conform to applicable regulations. SIGNS No additional signage is proposed, though the existing freestanding sign near the entrance will shift to the east. STAFF RECOMMENDATION Staff recommends approval of the site and the waivers as requested. January 11, 2024 Eden Prairie Planning Commision 8080 Mitchell Road, Eden Prairie, MN, 55344 Project: Asia Mall - Parking Expansion 12160 Technology Drive, Eden Prairie, MN 55344 RE: Site Plan Review Narrative Dear Chairperson and Committee Members, On behalf of the property owner Asian Plaza Property LLC, I submit the following narrative and documents supporting their application to expand the parking lot. Documents/Exhibits Attached (or previously provided to staff): Signed Land Development Applications Form Application Fees for Site Plan Review Current Title Commitment Signed/Notarized Deposit Agreement Exhibit A Updated Traffic Study (previously performed by Alliant Engineering Inc.) Exhibit B Civil Site Plans (including Existing Conditions, Site, Grading/Drainage, Utility, Landscape, and Lighting Plans) Exhibit C Stormwater Report including a Green Infrastructure Review & Soils Report Exhibit D Phase 1 Environmental Assessment Exhibit E Shoreland Review Additional relevant existing information requested per Site Plan Review Application Checklist: Legal Description Gander Mountain Addition Lot 001 Block 001 Zoning Designation C-REG-SER (Regional Service Commercial) Executive Summary The previous Asia Mall site plan review and PUD waiver was approved with a deficit of 92 parking stalls. That approval was based on proposed areas and uses. Now that the facility has been fully built out, a PUD amendment is necessary as the actual areas and uses differ from the original proposal. This application proposes the expansion of the existing parking lot with 134 additional parking stalls to meet and exceed the required parking space requirements based on Asia Mall’s current areas and uses, now that it is fully completed. Waiver request: For the parking lot expansion to be constructed, the following waivers would need to be granted: ● Minimum Setbacks (11.03 Subd. 3. H.5.b) - The proposed parking lot is within the required 10’ setback along the North, West, and Southeast corner. ● Parking Islands (11.03 Subd. 3. G.5.h) - The proposed site layout does not meet the minimum parking island area requirements. ● Maximum Impervious (11.50 Subd. 13. E) - Proposed impervious surface is 97% which is greater than the required 30% maximum impervious. ● Screening (11.03 Subd. 3. G.5.q) - The proposed parking lot does not provide full screening of parked cars from Technology Dr. Background Information In 2006 Gander Mountain bought this site and built the existing structure and parking lot. The city granted a waiver to reduce the parking requirement from 5 to 4.5 spaces per 1,000 gsf of retail and office space. Asian Plaza Property LLC purchased the property in 2021 and converted the space to Asia Mall. The facade of the building was replaced and additional square footage was added to the second level of the building. Asia Mall is a mixed use space with office, retail, grocery and restaurant space. The converted building required more parking per city code, and a parker waiver was granted in 2021 due to site limitations. The stormwater pond on the east side of the site would need to be replaced to accommodate a parking lot expansion. Asia Mall has been open a year and it has been an incredibly popular destination for the community. Parking demand has been very high. On busy days the lot will fill up and cars will park on Technology Dr or at Costco to the west. This high demand has led to traffic congestion in the area, so the city has required that Asia Mall provide more parking. As a short term solution, 50 additional parking stalls are being provided at the Asian Plaza Property LLC office to employees who are then shuttled to Asia Mall. Project Description: This project proposes to increase off street parking to the maximum extent practicable. The existing parking lot would be significantly expanded. The existing pond to the east would be converted to underground storage. New pavement would then be constructed east out to the property line. The existing lot would also be pushed out on the west and north closer to the property line. Additionally, the city would require a right turn lane be added to Technology Dr. This project would require new pavement, underground stormwater storage, lighting, landscaping, and an entrance sign. Parking Requirements A traffic and parking study was previously performed by Alliant Engineering Inc. in 2021. During the previous site review a waiver was requested for a shortage of stalls. Since that study, square footage and restaurant seating has been added which has increased the parking shortage. The proposed site plan meets the city code requirements, and provides a substantial excess number of parking stalls for peak traffic demand. Parking Study Stall requirements to meet the Eden Prairie code have been updated per actual areas and uses. UPDATED Eden Prairie Parking Code Requirement Land Use SF Seats Parking Code Req'd Stalls Office GLA 4873 4.5/1000 22 Retail GLA 5844 4.5/1000 27 Non-Leasible 12560 NA NA Grocery 33645 4.5/1000 152 Type 1 Rest. 5725 150 1/2.5 seats 60 Type 2 Rest. 886 24 1/3 seats 8 Type 3 Rest. 11665 310 1/2 seats 155 Total 75198 484 424 Provided Parking Stalls Underground 77 Surface Parking 217 Surface Parking Expansion 134 Total 428 Provided Parking Stall Excess/ Shortage 4 The proposed site plan would add 134 stalls which provides an excess of 4 stalls per city code. The previous site plan review had a city code requirement of 386 stalls and there was a 92 stall shortage. This proposed site plan would provide dramatically more parking. Traffic Study The traffic study estimated peak traffic hours for the different businesses on the site (restaurants are busy at different times than grocery stores etc). The busiest time for the entire site was estimated. The original Alliant calculations were updated to reflect the current land uses of Asia Mall. A summary of these calculations can be seen below and full updated calculations can be found in Exhibit A. Land Use (ITE Code) Size (SF) Size (Seats) Stalls per 1,000 SF/Seats Weekday [1] Stalls per 1,000 SF/Seats Saturday [1] Weekday Peak Parking Demand (Stalls) Saturday Peak Parking Demand (Stalls) Office (710) 4873 2.4 0.3 12 1 Retail (820) 5844 2.0 2.9 12 17 Grocery (850) 33645 2.9 3.6 99 122 Type 1 Rest. (933) [2] 5725 150 0.66 0.73 99 109 Type 2 & 3 Rest. (932) 12550 334 0.35 0.35 118 118 Peak Traffic Demand 317 344 Proposed Total Parking Stalls 428 Parking Excess/ Shortage 111 84 Percent Parking Excess/ Shortage 35% 24% [1] Source: InsƟtute of TransportaƟon Engineers Parking GeneraƟon Manual, 5th EdiƟon [2] Source: Due to limited availability, Saturday Peak parking demand esƟmated by mulƟplying weekday value by a factor of 1.1 The updated traffic study shows the proposed site plan meets peak traffic demand with significant excess parking. The estimated peak traffic demand from this study is comparable to what has been seen on site in the last year of operation during peak traffic. The 294 stall parking lot and the 50 off site employee stalls are occupied and there are more vehicles on site looking for parking. The proposed site provides enough parking to meet expected traffic demand, and there should not be a traffic problem in the future. Summary of Parking Requirements ● Eden Prairie parking code requires 424 off-street parking stalls and the proposed site offers 428. ● The traffic study estimated parking requirements using data from the Institute of Transportation Engineer’s Generation Manual, 5th Edition (ITE PGM). The site design provides enough stalls for peak traffic demand. ● The proposed parking lot meets the requirements in the Eden Prairie City Code. Therefore, impacts on the surrounding properties and/or roadways are not anticipated. Asia mall is a unique business. Traffic for the different businesses is varied enough that the parking lot can handle peak traffic. Also, the multi-use format of the site means that several people coming to Asia Mall will visit multiple businesses. This was not analyzed in the traffic study, but it is assumed that this site would see a lower parking demand because of customers making multiple stops in a single trip. Additionally, employee parking spaces are currently offered at a separate location and transported via shuttle to the site. The updated traffic study shows that employees could park on site and the shuttle would not be required after the parking lot expansion is completed. Landscaping The existing site has 78 trees, 11 of which are significant. The proposed project would remove 9 significant trees and 46 non-significant trees. Eden Prairie Municipal Code 11.55 Subd. 4 requires that 24 trees be planted to accommodate this loss. Tree Replacement Total Caliper Inches of Significant Removal 136 Total Caliper Inches of Significant Trees 157 Required Caliper Inches 59 Required 2.5" Trees 24 The planting of 24 new trees would meet the city landscaping requirements found in Municipal Code 11.3 Subd.5. The proposed landscaping plan shows tree locations and the planting schedule. All proposed trees are naturalized native species according to the University of Minnesota. Landscaping Requirement GFA 76,000 Required Caliper Inches 238 Remaining Dec. Caliper Inches 131 Remaining Con. Height Ft 104 Equivalent Con. Caliper Inches 43 Remaining Shrubs 47 Equivalent Shrub Caliper Inches 24 Proposed Trees Caliper Inches 59 Total Proposed Caliper Inches 257 Construction Schedule This project would begin as soon as approval is granted by the city and materials can be procured. It is expected to last approximately 3 to 6 months and would be completed before winter 2024. Sustainability While this project is an addition and not new construction, sustainability was still considered throughout the design process. The proposed underground stormwater system would improve water quality leaving the site and lower peak discharge rates. When the building was purchased two EV chargers were installed. At the time 2 additional chargers were proposed for installation in 2024. If these are installed then the site would have EV charging at 1% of parking stalls which is halfway to the city goal of 2%. Also, when the site was purchased a potential solar array was proposed within 5 years. At this time it is not feasible for this to be installed, but will be considered again by the original goal of 2026. Additional Information: Phase 1 Environmental Assessment This site has previously undergone an environmental assessment when it was purchased in 2021. The soil had been contaminated but remediation efforts have been taken and the MPCA has sent closure letters. This alone does not assure that there are no contaminants in the soil. After reviewing site history the previous contaminants were located on the west side of the site around the current building. Groundwater in the contaminated area was found to flow to the west. Proposed excavation for this site would occur on the east side of the site approximately 300’ from the contaminated area. The east side of the site has no history of contaminants. Shoreland Review The existing stormwater pond outlets to Lake Idlewild which is protected shoreland. The proposed underground system is designed to use the existing outlet structure. Since the proposed system was designed per RPBCWD rules there should not be any impact on the shoreland. Snow and Salt Management Plans Snow and salt management will not be greatly altered. In the event of a large snowfall, snow would be hauled off site. This would keep the proposed parking stalls free from snow piles. Salt is currently not stored on site and will not be stored on site. Thank you for reviewing this application. Sincerely, Lance Elliott, PE Elliott Design Build >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> > > >> > > >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> 2 2 6 6 64 5 6 10 25 6 8 4 EXISTING TRUCK AREA 3 PARKING CALCULATION EXISTING UNDERGROUND = 77 EXISTING SURFACE = 217 TOTAL EXISTING = 294 TOTAL ADA STALL PROVIDED =9 ||| | | | | | | | | | | | | | | | | | | | | | | | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| |||| EXPAND TO 2' FROM NORTH PROPERTY LINE NEW EXIT (RIGHT OUT ONLY) EXISTING DRIVE TO REMAIN AS-ISCHANGE EXITING TRAFFIC TO RIGHT-OUT ONLY EXPAND OUT TO WEST PROPERTY LINE TO ACCOMMODATE PARALLEL STALLS RIGHT TURN LANE PER CITY REQUIREMENTS 1 APPROX. 3' RETAINING WALL B612 CURB B612 CURB B624 CURB B612 CURB RELOCATED LIGHT -6 10' SEBACK ALONG FRONTPROPOSED SIGN | | | | | | | | | | | | |||| PARKING CALCULATION EXISTING UNDERGROUND = 77 EXISTING SURFACE = 217 TOTAL EXISTING = 294 SURFACE EXPANSION = 122 PROPOSED TOTAL = 425 TOTAL ADA STALLS REQ'D = 9 TOTAL ADA STALL PROVIDED = 9 PROPOSED LIGHT PROPOSED LIGHT EXISTING PAVEMENT EDGE 24' 16' 100' 14' 24' 200' > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >>>>>>>>>>>> > > > > > > > > > > > > > > > > > > > > > > > > >>>> > > > > > > > > > > > > > > >> 5' 13' 19' 24' 24' 24' -33 38'36' 5' 19' 5' 18'9' 19'9' 9'23' 20' 9' 23' 9' 18' CONCRETE PEDESTRIAN PATH MATCH EXISITNG5 6 11 >> >> >> YELLOW CURB YELLOW CURB NO LEFT TURN R3-2 RIGHT TURN LANE MUST TURN RIGHT R3-7 DO NOT ENTER R5-1 ARROWS ARROW 6" WHITE STRIPE NO PARKING FIRE LANE SIGN VALLEY GUTTER VALLEY GUTTER NO LEFT TURN R3-2 CROSSWALK STRIPING 14' >> ONE-WAY R6-1R INSTALL WOOD MULCH LEGEND EXISTING SITE PROPOSED SITE PROPOSED PAVEMENT DECOMPACT AND SEED WITH MNDOT 25-131 DECOMPACT AND INSTALL LANDSCAPE ROCK PROPERTY LINE UNDERGROUND STORAGE EXISTING TREE Asia Mall. 12160 Technology Dr., Eden Prairie, MN 55344 E519 GENERAL NOTES: 1.FOLLOW ALL CITY REQUIREMENTS. 2.MINIMIZE DISTURBANCE TO LAWN DURING DEMOLITION RESTORE WHEN COMPLETE. 3.PUBLIC STREETS ARE TO BE CLEAN OF DEBRIS AND DIRT ON A DAILY BASIS. 4.STATE LAW REQUIRES NOTIFICATION OF GOPHER ONE CALL, BUT CAN BE LOCATED BY A CONTRACT LOCATOR OR OTHER SUITABLE MEANS. 5.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITY LINES PRIOR TO CONSTRUCTION. 6.CONTRACTOR SHALL PROTECT AND SUPPORT AS NECESSARY ALL EXISTENCE PUBLIC AND PRIVATE UTILITIES. 7.CONTRACTOR SHALL FOLLOW ALL LOCAL, STATE AND FEDERAL REGULATIONS IN DISPOSING OF DEMOLISHED MATERIALS REMOVED FROM THIS SITE. PLANTING SCHEDULE SYMBOL NAME SIZE QTY BLACK HILLS SPRUCE 6' 9 IVORY SILK 2.5" 15 JAPANESE TREE LILAC REJOICE CRABAPPLE 2.5" 15 MATADOR MAPLE 2.5" 4 KARL FORESTER #1 50 GRASS BLUE STAR JUNIPER #5 15 Feet 1" = 40' 16080040 Tree Removal Calculations Non-Significant Tree Replacement Non-Significant Healthy Trees Removed=39 Required Tree=39 Significant Tree Replacement Caliper Inches of Significant Trees Removed=136" Caliper Inches of Significant Trees Remaining=21" Required Tree=24 Proposed Landscaping Plan Total Required Caliper Inch=157.5" Proposed Trees=43 (107.5") Proposed Grasses & Shrubs=65 (6.5") Total Proposed Caliper Inch=114" Tree Replacement Fee 43.5" X $125=$5,438 >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> > > > > >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> EXISTING TRUCK AREA ||| | | | | | | | | | | | | | | | | | | | | | | | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| |||| 865 870 87 5 86 5 87 0 850 850 855 855 860 85 0 85 0 85 5 85 5 86 0 860 865 870 86 0 86 0 86 5 86 0 86 0 865 860 860 850 855 860 865 870 875 880 885 86587087 5 88 0 860 86 5 865 EXPAND TO 2' FROM NORTH PROPERTY LINE NEW EXIT (RIGHT OUT ONLY) EXISTING DRIVE TO REMAIN AS-IS CHANGE EXITING TRAFFIC TO RIGHT-OUT ONLY EXPAND OUT TO WEST PROPERTY LINE TO ACCOMMODATE PARALLEL STALLS RIGHT TURN LANE PER CITY REQUIREMENTS B612 CURB B612 CURB B624 CURB B612 CURB SILT FENCE CONSTRUCTION ENTERENCE TW=860.0 BW=858.5 TW=862.0 BW=861.0 TW=865.0 BW=862.0 TW=861.0 BW=860.0 REDUNDANT SILT FENCE 10' SEBACK ALONG FRONT TW=861.0 BW=858.5 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSF SILT FENCE Total Area Disturbed: 46,276 SF Total New Impervious: 43,699 SF Asia Mall Impervious: 183,318 SF (87%) Asia Mall Pervious: 25,624 SF Turn Lane Impervious: 4,551 SF GRADING ANALYSIS CUT=2,500 CY FILL=4,500 CY | | | | | | | | | | | | |||| SF > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >>>>>>>>>>>> > > > > > > > > > > > > > > > > > > > > > > > > > >>>> > > > > > > > > > > > > > >> INLET PROTECTION INLET PROTECTION >> >> >> UNDERGROUND SYSTEM UNDERGROUND SYSTEM UNDERGROUND SYSTEM VALLEY GUTTER VALLEY GUTTER >> 866.56 863.00 859.75 LP 860.93 861.15 861.73 861.57 860.58 859.00 LP 864.00 862.62 862.34 864.03 863.99 862.58 862.45 861.94 859.79 859.32859.34 861.63 873.25 863.03 861.82 860.82 LP 861.86 863.00 863.00 859.5 EOF 861.94 861.47862.17 863.04 864.01 865.49 865.89 859.05 866.46 865.87 867.00 859.03 Asia Mall. 12160 Technology Dr., Eden Prairie, MN 55344 E519 EROSION CONTROL NOTES 1.NATURAL TOPOGRAPHY AND SOIL CONDITIONS MUST BE PROTECTED, INCLUDING RETNETION ONSITE OF NATIVE TOPSOIL TO THE GREATEST EXTEND POSSIBLE. NEW TOPSOIL THAT IS INSTALLED SHALL CONTAIN AT LEAST 5% ORGANIC CONTENT CONSISTENT WITH RPBCWD TOPSOIL DEFINITION. 2.ADDITIONAL MEASURES, SUCH AS HYDRAULIC MULCHING AND OTHER PRACTICES AS SPECIFIEID BY THE DISTRICT MUST BE USED ON SLOPES OF 3:1 (H:V) OR STEEPER TO PROVIDE ADEQUATE STABILIZATION. 3.FINAL SITE STABILIZATION MEASURES MUST SPECIFY THAT AT LEAST SIX INCHES OF TOPSOIL OR ORGANIC MATTER BE SPREAD AND INCORPORATED INTO THE UNDERLYING SOIL DURING FINAL SITE TREATMENT WHEREVER TOPSOIL HAS BEEN REMOVED. 4.CONSTRUCTION SITE WASTE SUCH AS DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, LITTER, AND SANITARY WASTE MUST BE PROPERLY MANAGED. 5.ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION AND VEGETATION IS ESTABLISHED SUFFICIENTLY TO ENSURE STABILITY OF THE SITE, AS DETERMINED BY THE DISTRICT. 6.ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S MUST BE REMOVED UPON FINAL STABILIZATION. 7.SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUST BE DECOMPACTED TO ACHIEVE A SOIL COMPACTION TESTING PRESSURE OF LESS THAN 1,400 KILOPASCALS OR 200 POUNDS PER SQUARE INCH IN THE UPPER 12 INCHES OF THE SOIL PROFILE WHILE TAKING CARE TO PROTECT UTILITES, TREE ROOTS, AND OTHER EXISTING VEGETATION. 8.ALL DISTURBED AREAS MUST BE STABILIIZED WITHIN 7 CALENDAR DAYS AFTER LAND-DISTURBING WORK HAS TEMORRILY OR PERMANENTLY CEASED ON A PROPERTY THAT DRAINS TO AN IMPAIRED WATER, WITHIN 14 DAYS ELSEWHERE. 9.THE PERMITTE MUST, AT A MINIMUM, INSPECT, MAINTAIN, AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL STABILIZATION MEASURES EVERY DAY WORK IS PERFORMED ON THE SITE AND AT LEAST WEEKLY UNTIL LAND-DISTURBING ACTIVIITY HAS CEASED. THEREAFTER, THE PERMITTEE MUST PERFORM THESE RESPONSIBILITIES AT LEAST WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED. THE PERMITTEE WILL MAINTAIN A LOG OF ACTIVITIES UNDER THIS SECTION FOR INSPECTION BY THE DISTRICT ON REQUEST. Feet 1" = 40' 16080040 LEGEND PROPOSED CONTOURS EXISTING CONTOURS EXISTING SPOT PROPOSED SPOT SILT FENCE INLET PROTECTION SF SF 1025. 0 EAST RETAINING WALL DETAIL SEE VERSA-LOK FOR FULL DETAILS 862.34 863.47 >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> > > > > > > >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> ||| | | | | | | | | | | | | | | | | | | | | | | | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| |||| 86 5 870 87 5 86 5 87 0 850 850 855 85 5 860 85 0 85 0 85 5 85 5 86 0 86 0 865 870 860 860 86 5 860 86 0 865 860 860 850 855 860 865 870 875 880 885 865870 87 5 88 0 860 86 5 865 SANITARY BUILDING CONNECTION 17LF 6' PVC INV=849.2 8 6 0 860 86 1 861 862 862 863 863864 8 6 2 8 6 3 863 86 4 864 86 0 860 85 9 859 8 6 1 861 8 6 2 865 870 863 86 4 866 867 868 869 871 872 873 850 855 860 865 86 0 86 5 87 0 875 880 885 855 860 865 87 0 875 88 0 885 855 860 85 5 860 8 6 0 865 870 875 865 8 7 0 870 8 7 0 860 86 0861 8 6 1 86 2 86 2 | | | | | | | | | | | | |||| TRENCH DRAIN RIM=857.90 INV=855.90 SB-3 853.4 SB-2 853.2 SB-1 850.9 SB-4 854.8 853.5SB-5 SB-6 855.0 > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >>>>>>>>>>>> > > > > > > > > > > > > > > > > > > > > > > > > > > > > >>>> > > > > > > > > > > > > > > 17 6 L F 1 0 " @ 0 . 4 0 % 213LF 10 " @ 0.39% 217L F 1 0 " @ 0. 1 5 % 148LF 1 0 " @ 0.24% 95 L F 1 0 " @ 1 . 0 1 % 203LF 1 0 " @ 1. 0 4 % 166LF 10" @ 0.96% 20 0 L F 1 0 " @ 0 . 2 5 % 67LF 10" @ 4.43% 177 L F 1 0 " @ 1. 1 2 % 24LF 10" @ 0.29% >> EX. MH 7 RIM=874.32 INV=854.85(W) INV=854.75(NE) EX. MH 1 RIM=867.53 INV=840.03(N) INV=839.93(SW) EX. MH 6 RIM=869.97 INV=852.78(NE) INV=852.78(SW) INV=852.68(N) EX. MH 8 RIM=869.34 INV=857.94(S) INV=857.84(E) EX. MH 5 RIM=864.85 INV=851.72(S) INV=851.62(NW) EX. MH 4 RIM=858.18 INV=849.52(SE) INV=849.42(W) EX. MH 11 RIM=861.78 INV=854.60(SE) INV=854.50(W) ADJUST RIM TO 862.30 EX. MH 9 RIM=863.69 INV=853.23(SE) INV=853.13(SW) ADJUST RIM TO 864.15 EX. DROP MH 3 RIM=859.00 INV=847.83(E) INV=840.70(W) EX. MH 10 RIM=858.01 INV=853.66(E) INV=853.56(NW) ADD ADDITIONAL SECTION PROPOSED RIM 860.66 EX. MH 2 RIM=848.50 INV=840.63(E) INV=840.53(S) >> CBMH 1003 RIM=859.75 INV=854.31(NE) SUMP=851.31 6LF 12" HDPE @ 1.00% 17LF 12" HDPE @ 1.00% CB 350 RIM=860.82 INV=856.84(S) 15LF 12" Reinforced Concrete Pipe @ 1.00% INSTALL SALVAGED PIPE 4LF 12" HDPE @ 0.00% 47LF 12" HDPE @ 1.48% 32LF 12" HDPE @ 5.59%239LF 12" HDPE @ 2.94% 14 4 L F 1 2 " H D P E @ 0 . 4 3 % 36LF 12" HDPE @ -1.92% 4 6 L F 1 2 " H D P E @ 1 . 5 2 % 62LF 1 2 " H D P E @ 0.6 4 % 14LF 1 2 " H D P E @ 1. 3 0 % 134LF 1 2 " H D P E @ 1.0 1 % 43 L F 1 2 " H D P E @ 1 . 0 2 % 49LF 1 2 " H D P E @ 0.91 % 68 L F 1 2 " H D P E @ 5 . 3 8 % 87 L F 1 2 " H D P E @ 5 . 2 9 % 332 L F 1 2 " H D P E @ 0. 6 1 % 47 L F 1 2 " R e i n f o r c e d C o n c r e t e P i p e @ 0 . 5 3 % 285LF 12" Reinforced Concrete Pipe @ 2.11% 208LF 24" HDPE @ 0.19% 12LF 12" HDPE@ 0.42% 48 L F 1 5 " R e i n f o r c e d C o n c r e t e P i p e @ 0 . 5 6 % 185LF 15" Reinforced Concrete Pipe @ 0.54% 11 9 L F 1 2 " R e i n f o r c e d C o n c r e t e P i p e @ 3 . 1 9 % EX. CB 202 RIM=860.38 INV=856.37(SE) CBMH 1000 RIM=863.00 INV=854.35(NW) INV=854.35(SE) SUMP=851.35 CONSTRUCT OVER EX. STRUCTURE CBMH 1002 RIM=862.35 INV=857.40(W) INV=854.34(E) SUMP=851.34 CONSTRUCT OVER EX. STRUCTURE EX. CBMH 212 RIM=862.35 INV=858.35(W) INV=858.10(E) EX. CBMH 213 RIM=0.00 INV=860.15(W) INV=860.15(E) EX. CBMH 214 RIM=871.18 INV=867.18(N) INV=867.18(E) EX. CB 215 RIM=871.80 INV=867.80(NW) INV=867.80(S) INV=867.80(W) EX. FES 100 RIM=851.88 INV=850.00(E) EX. STORMCEPTOR 101 RIM=861.00 INV=850.40(SE) INV=850.40(W) EX. CBMH 102 RIM=860.94 INV=851.62(E) INV=855.45(S) INV=856.95(SW) INV=850.58(NW) EX. CB 103 RIM=857.00 INV=852.97(W) EX. CBMH 105 RIM=866.38 INV=862.50(S) INV=862.5(N) INV=862.50(W) BULKHEAD AND ABANDON NORTH PIPE CORE WEST PIPE INTO STRUCTURE REPLACE CASTING EX. CB 106 RIM=871.11 INV=867.11(N) REPLACE CASTING EX. CBMH 104 RIM=862.70 INV=857.40(S) INV=857.40(NE) EX. CB 304 RIM=864.75 INV=861.00(S) EX. CBMH 303 RIM=864.75 INV=860.75(N) INV=860.75(E) EX. CBMH 248 RIM=864.45 INV=853.30(E) INV=853.30(S) EX. STMH 249 RIM=860.00 INV=853.70(N) INV=853.70(W) EX. OCS 250 SEE DETAIL C-5 EX. CBMH 300 RIM=861.00 INV=854.73(W) INV=854.98(N) INV=853.52(S) EX. CBMH 301 RIM=861.00 INV=855.25(E) INV=855.25(S) PROP INV=856.69(N) CORE NORTH PIPE INTO STRUCTURE ADJUST RIM TO MATCH PAVEMENT REPLACE CASTING SALVAGE EXISTING CASTING FOR CB 350 EX. CBMH 302 RIM=861.50 INV=856.25(W) ADJUST RIM TO 861.4 REPLACE CASTING EX. STMH 403 RIM=862.00 INV=855.80(S) INV=855.80(N) Verify Structure Location Adjust to Match Gutter EX. STMH 402 RIM=857.20 INV=852.00(S) INV=852.00(NW) ADD ADDITIONAL SECTION PROPOSED RIM 859.63 EX. STMH 401 RIM=862.50 INV=??? ADJUST RIM TO 862.87 EX. FES 400 INV=??? >> STMH 2000 RIM=861.92 INV=859.32(S) INV=858.82(N) CONSTRUCT OVER EX. PIPE BULKHEAD AND ABANDON EX. PIPE TO SOUTH 26 L F 1 2 " H D P E @ 5 . 3 8 % >> 19LF 12" HDPE @ 0.00% 3LF 12" HDPE @ 52.18% CBMH 1001 RIM=859.00 INV=855.50(S) SUMP=852.50 23LF 12" HDPE @ 0.00% >> 20LF 18" HDPE @ 0.49% INSTALL SALVAGED PIPE 9LF 18" HDPE @ 1.00% INSTALL SALVAGED PIPE 1LF 12" HDPE @ 0.00% 861.63 873.25 861.86 859.5EOF 861.94 861.47 862.17 863.04 864.01 865.49 865.89 859.05 866.46 865.87 867.00 859.03 BMP-11-34G BOT=854 HWL=858.97 TOP STONE=859.0 SEE C-5 FOR DETAILS BMP-11-34H BOT=858.5 HWL=862.57 TOP STONE=863.0 SEE C-5A FOR DETAILS 855 856 857 858 859 860 861 862 863 864 865 1+00 1+50 48LF 15" Reinforced Concrete Pip e EX. CBMH 301 RIM=861.00 INV=855.25(E) INV=855.25(S) PROP INV=856.69(N) CORE INTO STRUCTURE CB 350 RIM=860.80 INV=856.84(S) 15LF 12" Reinforced Concrete Pipe @ 1.00% EX. CBMH 300 RIM=861.00 INV=854.73(W) INV=854.98(N) INV=853.52(S) EXISTING GRADE PROPOSED FINISHED GRADE MATCH EXISTING CROWN Asia Mall. 12160 Technology Dr., Eden Prairie, MN 55344 E519 LEGEND EXISTING SANITARY SEWER EXISTING SANITARY SEWER MANHOLE EXISTING STORM SEWER EXISTING STORM SEWER CATCH BASIN PROPOSED STORM SEWER PROPOSED STORM SEWER CATCH BASIN EXISTING WATERMAIN EXISTING GATE VALVE EXISTING HYDRANT UTILITY EASEMENT >>> ||| Feet 1" = 40' 16080040 >>>>>> TURN LANE PROFILE GENERAL NOTES 1.ALL ELEVATIONS ARE FINISH GRADE. 2.CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE PRIOR TO BIDDING TO ASSURE SCOPE OF WORK IS UNDERSTOOD AND IS TO CONTACT ENGINEER PRIOR TO BIDDING FOR ANY CLARIFICATION NEEDED. THERE WILL BE NO ADDITIONAL COMPENSATION FOR ITEMS THAT COULD HAVE BEEN CLARIFIED PRIOR TO BID SUBMITTAL 3.COORDINATE GAS, ELECTRIC, AND COMMUNICATION SERVICES CONNECTIONS WITH OWNER. 4.STATE LAW REQUIRES NOTIFICATION OF GOPHER STATE ONE CALL FOR LOCATION OF UTILITY OWNED LINES 48 HOURS PRIOR TO BEGINNING WORK. PRIVATE UTILITY LINES WILL NOT BE LOCATED BY A CONTRACT LOCATOR OR OTHER SUITABLE MEANS. CONTRACTOR IS RESPONSIBLE FOR LOCATION ALL UTILITY LINES PRIOR TO CONSTRUCTION. 5.WORK WITHIN PUBLIC RIGHT-OF-WAY OR CONNECTION TO PUBLIC UTILITIES MUST BE COORDINATED WITH THE EDEN PRAIRIE PUBLIC WORKS DEPARTMENT. CONTRACTOR MUST PROVIDE A MINIMUM 48-HOUR NOTICE PRIOR TO BEING PERFORMED. UTILITY NOTES 1.CONTRACT TO VERIFY EXISTING INVERTS PRIOR TO CONSTRUCTION 2.ALL SITE UTILITY MATERIALS AND INSTALLATION METHOSTO MEET STATE AND CITY REQUIREMENTS. 3.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITY LINES PRIOR TO CONSTRUCTION. 4.ANY VARIATIONS FROM THIS PLAN FOUND ON SITE TO BE REPORTED TO PROJECT ENGINEER. >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >> >> >>>>>> INV=854.25INV=853.75 OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH 17LF 12" HDPE @ 1.00% 6LF 12" HDPE @ 1.00%4LF 12" HDPE @ 0.00% INV=854.43 23LF 12" HDPE @ 0.00% >> >> >> INV=854.25 9LF 18" HDPE @ 1.00% INV=854.25 20LF 18" HDPE @ 0.49% INV=855.33 1LF 12" HDPE @ 0.00% INV=854.25 INV=854.25 INV=854.43 CBMH 1000 RIM=863.00 INV=854.35(NW) INV=854.35(SE) SUMP=851.35 CBMH 1002 RIM=862.35 INV=857.40(W) INV=854.34(E) SUMP=851.34 EX. OCS 250 RIM=860.00 INV=853.75(NW) INV=853.75(S) INV=851.75(NW) SUMP=851.75 MODIFY PER DETAIL CBMH 1003 RIM=859.75 INV=854.31(NE) SUMP=851.31 CBMH 1001 RIM=859.00 INV=855.50(S) SUMP=852.50 Asia Mall. 12160 Technology Dr., Eden Prairie, MN 55344 E519 Feet 1" = 20' 8040020 GRAVEL LAYER EXTENDS 1' BEYOND CMP APPROX. 18,700 SF 6" Ø Orifice INV = 853.75 INSTALL SALVAGED GRATE WEIR WALL SEE DETAIL 48" MH NWL = 853.75 INV = 851.75 12" RCP INV = 853.75 12" HDPE 12" RCP REMOVE EXISTING PIPE BULKHEAD STRUCTURE CORE INTO STRUCTURE INSTALL SALVAGED PIPE RIM = 860.0 RIM = 856.5 EXISTING OUTLET CONTROL STRUCTURE 250 NOT TO SCALE EXISTING WEIR WALL DETAIL NOT TO SCALE ADD NEW CONCRETE SECTIONS REMOVE AND SALVAGE EXISTING GRATE 6'X12' STORM FILTER VAULT B A PIPE CROSSING SCHEDULE A*EX 12" RCP TOP 853.97 PROP 12" HDPE BOT 854.23 B*EX 10" SDR 35 TOP 854.90 PROP 12" HDPE BOT 855.40 CONTECH STORM FILTER DESIGN NOT TO SCALE SEE CONTECH PLAN FOR DETAILS INLET=854.25' OUTLET=853.75' 857.00' 10 X 27" STORMFILTER CARTRIDGES WITH PHOSPHOSORB MEDIA FILTRATION BAY OUTLET BAYINLET BAY TRANSFER HOLE COVER FRAME AND COVER AND ACCESS HATCH CAST FLUSH IN TOP STEP (TYP) HIGH FLOW BYPASS WEIR FILTRATION BAY FLOORINLET BAY FLOOR TRANSFER HOLE TO FILTRATION BAY ELEVATION SECTION B-B INV = 856.0 GENERAL NOTES 1.ALL INLET STRUCTURES TO THE UNDERGROUND SYSTEM TO HAVE 3' SUMPS 2.TO THE MAXIMUM EXTENT POSSIBLE, MINIMIZE POTENTIAL INVASIVE SPECIES (EG. ZEBRA MUSSELS, EURASIAN WATERMILFOIL, ETC.) TRANSFER WHEN WORKING IN EXISTING POND SUBWATERSHED. *INSULATE CROSSINGS PER CITY DETAIL HIGH FLOW BYPASS WEIR IN SITU NOT TO SCALE SEE CONTECH PLAN FOR DETAILS 48" CMP SECTION 859.00' 854.00' 858.00' 858.98' HWL 48" PERFORATED CMP PAVEMENT (PER ENGINEER'S DRAWINGS) CMP TO SIT DIRECTLY ON SUBGRADE STONE BACKFILL SUBBASE >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> > > > > >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >> >> >> >> >> PARKING CALCULATION EXISTING UNDERGROUND = 77 EXISTING SURFACE = 217 TOTAL EXISTING = 294 TOTAL ADA STALL PROVIDED =9 ||| | | | | | | | | | | | | | | | | | | | | | | | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| |||| 865 870 87 5 86 5 87 0 850 850 855 855 860 85 0 85 0 85 5 85 5 86 0 860 865 870 86 0 86 0 86 5 86 0 86 0 865 860 860 850 855 860 865 870 875 880 885 86587087 5 88 0 860 86 5 865 20 ' S T O R M S E W E R E A S M E N T ( P E R D O C N O . 4 6 5 3 7 7 ) 2 0 ' S A N I T A R Y S E W E R E A S M E N T ( P E R D O C N O . 4 2 5 0 0 4 0 ) 3 4 5 6 7 8 9 10 14 15 16 17 18 19 20 21 22 23 3635 24 25 26 27 28 29 30 31 32 33 34 2 1 11 12 13 37 38 39 40 41 42 43 44 45 46 47 48 49 60 61 64 62 50 51 59 52 63 58 57 53 54 5556 65 666768 69 70 7172 7374 75 76 77 78 | | | | | | | | | | | | |||| SB-3 853.4 SB-2 853.2 SB-1 850.9 SB-4 854.8 853.5 SB-5 SB-6 855.0 N0 0 ° 0 6 ' 3 2 " E 37 9 . 2 7 S83° 10' 12"E 230.57 S6 2 ° 3 0 ' 3 6 " E 39 0 . 1 0 L=384.23,Δ=20°45'36"R=1054.94 N89° 04' 05"E 745.79 L =189.74 Δ=5°5 5'2 9" R=18 34.86 N0 6 ° 4 3 ' 4 8 " E 35 . 1 7 10.0' 17.5' 10.0' 20.0' 20.0' 20.0' 20.0' 20.0' > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >>>>>>>>>>>> > > > > > > > > > > > > > > > > > > > > > > > > > >>>> > > > > > > > > > > > > > >> E E E E E E E E E E E E E E E E E OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH LEGEND EXISTING CONTOURS EXISTING SANITARY SEWER EXISTING SANITARY SEWER MANHOLE EXISTING STORM SEWER EXISTING STORM SEWER CATCH BASIN EXISTING STORM SEWER MANHOLE EXISTING WATERMAIN EXISTING GATE VALVE EXISTING HYDRANT UTILITY EASMENT SOIL SAMPLE EXISTING TREE Asia Mall. 12160 Technology Dr., Eden Prairie, MN 55344 E519 Feet 1" = 40' 16080040 PROPERTY LINE EASEMENT FENCE BURIED ELECTRIC OVERHEAD LINES |||| EXISTING FENCE ALONG PROPERTY LINE EXISTING TREES EXISTING TRANSMISSION TOWER EXISTING TRANFORMERS STA T E H I G H W A Y N O . 5 TECHNOLOGY DR Tree Size (in dbh)Common Name Scientific Name Notes Save Non Significant Tree (in) Save Significant Tree (in) Remove Non Significant Tree (in) Remove Significant Tree (in) 1 8 Japanese Tree Lilac Syringa reticulata 8 2 9 Japanese Tree Lilac Syringa reticulata 9 3 6 Crabapple Malus sp.6 4 5 Crabapple Malus sp.5 5 6 Japanese Tree Lilac Syringa reticulata 6 6 6 Crabapple Malus sp.6 7 5 Crabapple Malus sp.5 8 6 Japanese Tree Lilac Syringa reticulata 6 9 4 Japanese Tree Lilac Syringa reticulata 4 10 5 Crabapple Malus sp.5 11 6 Japanese Tree Lilac Syringa reticulata 6 12 6 Japanese Tree Lilac Syringa reticulata 6 13 7 Crabapple Malus sp.7 14 9 Crabapple Malus sp.9 15 7 Japanese Tree Lilac Syringa reticulata 7 16 7 Crabapple Malus sp.7 17 10 Crabapple Malus sp.10 18 8 Crabapple Malus sp.8 19 7 Crabapple Malus sp.7 20 6 Crabapple Malus sp.6 21 7 Japanese Tree Lilac Syringa reticulata 7 22 8 Japanese Tree Lilac Syringa reticulata 8 23 7 Crabapple Malus sp.UNHEALTHY 7 24 7 Crabapple Malus sp.7 25 5 Japanese Tree Lilac Syringa reticulata 5 26 7 Crabapple Malus sp.UNHEALTHY 7 27 7 Crabapple Malus sp.7 28 7 Japanese Tree Lilac Syringa reticulata 7 29 6 Crabapple Malus sp.UNHEALTHY 6 30 6 Norway Maple Acer platanoides UNHEALTHY 6 31 6 Norway Maple Acer platanoides UNHEALTHY 6 32 6 Norway Maple Acer platanoides UNHEALTHY 6 33 5 Crabapple Malus sp.UNHEALTHY 5 34 4 Crabapple Malus sp.4 35 7 Crabapple Malus sp.7 36 6 Crabapple Malus sp.6 37 6 Japanese Tree Lilac Syringa reticulata 6 38 6 Norway Maple Acer platanoides 6 39 14 Cottonless Cottonwood Populus deltoides 14 40 8 Norway Maple Acer platanoides 8 41 14 Cottonless Cottonwood Populus deltoides 14 42 9 Norway Maple Acer platanoides 9 43 14 Cottonless Cottonwood Populus deltoides 14 44 26 Clump Redmond Linden Tilia americana 26 45 7 Japanese Tree Lilac Syringa reticulata 7 46 9 Japanese Tree Lilac Syringa reticulata 9 47 16 Clump Redmond Linden Tilia americana 16 48 15 Clump Redmond Linden Tilia americana 15 49 11 Clump Redmond Linden Tilia americana 11 50 11 Japanese Tree Lilac Syringa reticulata 11 51 10 Norway Maple Acer platanoides 10 52 12 Norway Maple Acer platanoides 12 53 5 Japanese Tree Lilac Syringa reticulata 5 54 10 Norway Maple Acer platanoides 10 55 8 Norway Maple Acer platanoides 8 56 6 Prairie Cascade Salix 'Prairie Cascade'6 57 11 Redmond Linden Tilia americana 11 58 13 Redmond Linden Tilia americana 13 59 10 Redmond Linden Tilia americana 10 60 22 Clump Prairie Cascade Salix 'Prairie Cascade' Willow not signifiicant 22 61 9 Clump Redmond Linden Tilia americana 9 62 11 Prairie Cascade Salix 'Prairie Cascade'11 63 12 Redmond Linden Tilia americana 12 64 11 Norway Maple Acer platanoides 11 65 6 White Spruce Picea glauca 6 66 9 White Spruce Picea glauca 9 67 10 Norway Maple Acer platanoides 10 68 6 White Spruce Picea glauca 6 69 6 White Spruce Picea glauca 6 70 10 Japanese Tree Lilac Syringa reticulata 10 71 12 Japanese Tree Lilac Syringa reticulata 12 72 9 Japanese Tree Lilac Syringa reticulata 9 73 6 Japanese Tree Lilac Syringa reticulata 6 74 9 Norway Maple Acer platanoides 9 75 5 White Spruce Picea glauca 5 76 7 White Spruce Picea glauca 7 77 10 Norway Maple Acer platanoides 10 78 7 Norway Maple Acer platanoides 7 10' D&U EASEMENT ALONG FRONT AND SIDE 17.5' D&U EASEMENT ALONG REAR PROPERTY LINE 25' WETLAND BUFFER SETBACK 60' WETLAND BUFFER WETLAND PERIMETER >>>>>> >>>>>>>>>>>> E E OH OH ANNOTATED AGENDA TO: Planning Commission Members FROM: Jeremy Barnhart, City Planner RE: Planning Commission Meeting for Monday, April 8, 2024 _______________________________________________________________________________ MONDAY, APRIL 8, 2024 7:00 PM, COUNCIL CHAMBERS I. CALL THE MEETING TO ORDER II.PLEDGE OF ALLEGIANCE III. APPROVAL OF AGENDA MOTION: Move to approve the agenda. IV. APPROVAL OF MINUTES A. PLANNING COMMISSION MEETING HELD MONDAY, MARCH 25, 2024 MOTION: Move to approve the Planning Commission minutes dated March 25, 2024 V. PUBLIC HEARINGS A. Enclave at Manor Rd. (2023-14) Request for: • PUD Concept Review on 6.43 acres • PUD District Review with waivers on 6.43 acres • Zoning Change from Rural to R1-9.5 on 6.43 acres • Preliminary Plat to divide one parcel into 17 lots and 1 outlot on 6.43 acres The applicant is requesting a PUD Concept Review, PUD District review with waivers, Zoning Change and Preliminary Plat review, all on 6.43 acres. The project would subdivide one lot to create 17 new lots for single family homes. The site is located about a quarter mile north of Duck Lake and is surrounded by existing single-family homes. The property is identified as an infill site in the Comprehensive Plan, and the proposed density of 2.6 units per acre is consistent with the low density guiding, which allows up to 5 units per acre. The plans also show a road connection with the existing neighborhood to the east, as anticipated in the Comprehensive Plan. Waivers are being requested for front yard setback and lot width. The front yard setback waivers would promote more tree preservation/replacement and the lot width waiver is consistent with other lots in the neighborhood. MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for PUD Concept Review, PUD District Review with waivers, Zoning Change and Preliminary Plat all on 6.43 acres as represented in the April 8, 2024 staff report. ANNOTATED AGENDA April 8, 2024 Page 2 B. Lotus Villas on Anderson Lakes (2024-02) Request for: • Guide Plan Change from Office to Low Density Residential on 5.0 acres • PUD Concept Plan Review on 5.0 acres • PUD District Review with waivers on 5.0 acres • Zoning District Change from Office to R1-9.5 on 5.0 acres • Preliminary Plat review on 5.0 acres The applicant is requesting for Guide Plan Change, PUD Concept Review, PUD District review with waivers, Zoning Change and Preliminary Plat review, all on 5 acres. The project redevelops an existing office building into a 19 lot single family development, in a villas concept. The applicant describes a villa as a ‘detached’ townhome, with individual ownership of the unit, nut common maintenance of grounds, streets, and driveways. MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for Guide Plan Change, PUD Concept Plan Review, PUD District Review with waivers, Zoning District Change and Preliminary Plat all on 5.0 acres as represented in the April 8, 2024 staff report. C. Asia Mall Parking lot Expansion (2024-01) Request for: • Planned Unit Development Concept Review on 4.69 acres • Planned Unit District Amendment with waivers on 4.69 acres • Site Plan Review on 4.69 acres. The applicant is requesting approvals to expand the parking lot at Asia Mall. This expansion will add 122 parking spaces, but require several waivers from setbacks, lot coverage, and parking lot islands. MOTION 1: Move to close the public hearing. MOTION 2: Move to recommend approval for Planned Unit Development Concept review, PUD District review with waivers, and Site Plan Review on 4.69 acres as represented in the April 8, 2024 staff report. VI. PLANNERS’ REPORT VII. MEMBERS’ REPORT VIII. ADJOURNMENT MOTION: Move to adjourn the Planning Commission meeting. THE ENCLAVE AT MANOR ROAD Brandl Anderson Homes has been building award-winning homes since 1993. We are local builder. We are a builder who respects the environment within our homes which are built to Green Path standards. Minnesota’s Green Path is the leading energy efficiency and green building program for the residential construction industry in Minnesota. Neighborhood Exceptions Setbacks adjusted to save more of the trees Self-Imposed Redundancy Rules Elevation – No duplicates to the left, the right, and directly across the street Color – No duplicates to the left, the right, and directly across the street Community Commitment Helping with sizing pipe off site per city guidelines Traffic Study completed Local company contact The Enclave at Manor Road Neighborhood The Enclave at Manor Road Landscape Plan The Enclave at Manor Road Landscape Plan The Enclave at Manor Road Time Frame June 2024 – Start Development work August 2024 – Sales Start April 2026 – Complete our last home The Enclave at Manor Road Product Homes will Range in size from 2400-4165 sq. ft. Pricing will start in Low 700’s. The Enclave at Manor Road Included Features Stone Accents (Per Plan) Increased roof pitches for visual appeal LP Smartside Siding on Fronts LP Trim Around Windows on All Four Sides Garage Doors with Windows Enhanced Landscaping Package Electric Vehicle Ready Solar Ready The Enclave at Manor Road Thank you! 1 Detached Villa example from Legacy Oaks in Minnetonka Lotus Villas - 10700 Prairie Lakes Drive - Planning Commission Meeting April 8, 2024 Existing Area map with surrounding land uses 2 Area map with proposed site plan and surrounding land uses 3 Existing Office Building - Data Center Site Survey 4 5 Lotus Villas on Anderson Lake - Site plan 6 Lotus Villas on Anderson Lake - Site plan 7 Lotus Villas on Anderson Lake – Preliminary Plat 8 Lotus Villa on Anderson Lake – Grading Plan 9 Lotus Villa on Anderson Lake – Landscape Plan 10 Requests - Proposed PUD – Preliminary Plat • Guide Plan Change from Office to Low Density Residential on 5.0 acres • PUD Concept Plan Review on 5.0 acres • PUD District Review with waivers on 5.0 acres • Zoning District Change from Office to R1-9.5 on 5.0 acres • Preliminary Plat review on 5.0 acres Why is does the change on Zoning make sense: •More Compatible with the surrounding uses then Office! •Increase in Tax value – Villa homes provide a 4-5 times increase in tax base with limited demand on schools and services •Gives current Eden Prairie residents a new maintenance free, main level living design which is in high demand. •Provides Parents and Grandparents of existing Eden Prairie residents a place to live closer to family •This also, through their existing homes, grants access to young families aspiring to raise their children within the high-quality Eden Prairie schools. 11 Lotus Villas – Site Plan showing Cross-section locations 12 Lotus Villas to Single Family area - Cross-section 13 Lotus Villas to Westin Woods Townhomes area - Cross-section 14 Pictures from our Legacy Oaks Neighborhoods 15 Pictures from our Legacy Oaks Neighborhoods 16 Pictures from our Legacy Oaks Neighborhoods 17 Pictures from our Legacy Oaks Neighborhoods 18 Pictures from our Legacy Oaks Neighborhoods 19 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Lower Level Family Room Laundry – Mud/Craft RoomOwners Suite Bath Lower Level Bar & Game area Owners Suite Bath Owners Suite Bedroom 20 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Office Nook KitchenDining Owners Suite Bedroom Great RoomFront of home 21 Pictures from Various Model homes in our Legacy Oaks and Trout Run Preserve Neighborhoods Lower Level Family Room Laundry – Mud RoomOwners Suite Bath Lower Level Bar & Game area Owners Suite Bath Front of home Example Villa Floor Plans 22 Example Villa Floor Plans 23 Example Villa Floor Plans 24 Example Villa Floor Plans 25 Asia Mall Parking Expansion 4/8/2024 Planned Unit Development 4.69 AC Required Waivers -Setbacks -Impervious Surface Area -Parking -Islands Landscaping & Tree Replacement Stormwater Improvements 4/8/2024 2 Existing Conditions 4/8/2024 3 Waivers 4/8/2024 4 •Setbacks – 10’ Front & 2’ Side and Rear •Impervious surface –87% Proposed (30% Max) •Parking Stall – 20 Stall Deficit •Parking Islands – 1.5% Island Area Proposed Shortage (3.5% Provided/5.0% Required) Parking Calculations 4/8/2024 5 Eden Prairie Parking Code Land Use Square Ft Stalls Office 4,873 21.9 Retail 5,218 23.5 Common Area 12,560 25.1 Grocery 33,645 151.4 Type 1 Rest.5,725 60 Type 2 Rest.886 8 Type 3 Rest 11,664 155 Required Stalls 445 Proposed Stalls 425 ITE Parking Generation Land Use Weekday Saturday Office 12 1 Retail 12 17 Common Area Grocery 99 122 Type 1 Rest.99 109 Type 2 Rest.118 118 Type 3 Rest Peak Parking 340 367 Expected Parking at Peak Time 317 344 Summary Thank you for your consideration. Approval of these waivers and the construction of the parking expansion would provide a long-term solution for traffic and public safety. 4/8/2024 8